Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Kitchen & powder room renovations: replace fixtures and outlets as per 2008 nec (south district) Date: October 3, 2017 Contractor: Crivello Electric Inc Client: Cohen Claire A | Permit type: Electrical permit | Permit status: Completed | Completion date: November 7, 2017 | Permit id: 808393 | |||||
SCORE 98 Waste and water lines for powder room,laundry stand pipe,new sink faucet and disposal (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: September 5, 2017 Contractor: John Devine Client: Cohen Claire A | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 813561 | |||||
SCORE 99 Remodel kitchen & installation of powder room. Installation of patio door per engineers drawings. Date: July 28, 2017 Contractor: Bellweather Construction Llc Client: Cohen Claire A | Permit type: Alteration permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 801015 | |||||
SCORE 100 Remodel of existing kitchen and powder room, relocate fixtures, 1 toilet, 1 lav, 1 washing machine and 1 kitchen sink. The installation will comply with the philadephia plubming code 2004 Date: August 2, 2017 Contractor: Edward Donnelly J And Son Inc Client: Cohen Claire A | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 805032 |