Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: September 1, 2015 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 635888 | |||||
Plumbing permit Date: March 1, 2016 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 673138 | |||||
Mechanical permit Date: May 10, 2016 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 689905 | |||||
Addition permit Date: November 16, 2015 Client: Rg Home Remodeling Llc | Permit status: Active | Permit id: 647778 | |||||
Electrical permit Date: June 16, 2016 Client: Rg Home Remodeling Llc | Permit status: Active | Permit id: 700591 | |||||
Zoning permit Date: November 16, 2015 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 647776 | |||||
Plumbing permit Date: May 10, 2016 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 690980 | |||||
Zoning permit Date: November 16, 2015 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 647776 | |||||
Demolition permit Date: September 1, 2015 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 635888 | |||||
Mechanical permit Date: May 10, 2016 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 689905 | |||||
Addition permit Date: November 16, 2015 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 647778 | |||||
Electrical permit Date: June 16, 2016 Client: Rg Home Remodeling Llc | Permit status: Completed | Permit id: 700591 | |||||
SCORE 99 Install 1 hvac unit with ductwork (sfd) Date: May 10, 2016 Contractor: Full Service Investment Llc Client: Kraft Crystal | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 13, 2016 | Permit id: 689905 | |||||
SCORE 97 Install 3 water closets, 2 bath tubs, 3 shower, 3 lavy sinks, 1 kitchen sink, 1 lalundry waste pipe - the installation will comply with the philadephia plumbing code, 2004. Date: May 10, 2016 Contractor: Richard Lawrence Client: Kraft Crystal | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 18, 2016 | Permit id: 690980 | |||||
SCORE 100 Installing new 200amp service complete with meter, panel and grounding,outlets,switches,lights and hardwired smokes co detectors as per 2008 nec (south district) Date: June 16, 2016 Contractor: East Coast Electrical Svcs Client: Kraft Crystal | Permit type: Electrical permit | Permit status: Completed | Completion date: December 29, 2016 | Permit id: 700591 | |||||
SCORE 89 For the erection of an addition above an existing attached structure (no roof deck permitted in required third floor front setback) with top roof deck and pilot house (for access to roof deck only). Size and location as shown in application. For use as existing single family household living. Date: November 16, 2015 Contractor: Uporau Client: Kraft Crystal | Permit type: Zoning permit | Permit status: Completed | Completion date: November 16, 2015 | Permit id: 647776 | |||||
SCORE 89 Int demo of non bearing walls-sfd ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: September 1, 2015 Contractor: Uporau Client: Kraft Crystal | Permit type: Demolition permit | Permit status: Completed | Completion date: July 13, 2016 | Permit id: 635888 | |||||
SCORE 100 Replace curb trap and connect to existing pipe and water line from curb to house pa20160550874(sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: March 1, 2016 Contractor: Norman Cole Sr, Client: Kraft Crystal | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 673138 | |||||
SCORE 89 Level iii alterations (no change of occupancy) to include new front wall and third floor addition (no roof deck permitted in required third floor front setback) with roof deck above and pilot house (access to roof deck only) to an existing single family dwelling. Building not required to be sprinklered. Separate permits required for mep work Date: November 16, 2015 Contractor: Uporau Client: Kraft Crystal | Permit type: Addition permit | Permit status: Completed | Completion date: December 29, 2016 | Permit id: 647778 |