Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Closed as incomplete - expired permit. Temporary christmas tree sales lot from november 25, 20 through december 22, 2010, per pan. Date: November 2, 2010 Applicant: Olson, Tim | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6265173 | |||||
Closed as incomplete - expired permit. Temporary christmas tree sales lot from november 25, 20 through december 22, 2010, per pan. Date: November 15, 2010 Applicant: Olson, Tim | Permit type: Construction | Permit status: Permit closed | Expiration date: May 15, 2012 | Current use: Commercial | Permit id: 6265173 | |||||
SCORE 95 Installing 9 co; 9 no2 sensors & 6 thermosats Date: August 24, 2016 Contractor: Merit Mechanical Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: August 24, 2017 | Current use: Commercial | Permit id: 6553033 | |||||
Canceled pending fees 5/2/2014 jh Applicant: Patterson-Ohare, Jodi | Current use: Commercial | Permit id: 3018078 | |||||
SCORE 95 Installation of new elevator Date: August 3, 2016 Contractor: Otis Elevator Company Applicant: Otis Elevator Company | Permit type: Conveyance | Permit status: Permit issued | Expiration date: February 3, 2018 | Permit id: 6548236 | |||||
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will installed on roof of a multi-family dwelling. 10 27 16 jk added revision for review. 10 27 16 jk approved revised plans. Date: February 1, 2016 Contractor: Puget Sound Solar Llc Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2017 | Current use: Commercial | Permit id: 6516598 | |||||
SCORE 100 2 25 2016 - cancelled customer log #16-281 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will be installed on roof of residence. Date: February 22, 2016 Contractor: Puget Sound Solar Llc Permit type: Electrical | Permit status: Permit issued | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520181 | |||||
Canceled pending fees 5 2 2014 jh on hold pending fees 4 2 14 jh. Land use application to allow a six-story structure containing 9,576 sq. Ft. Of commercial space at ground level and 222 residential units above. Parking for 229 vehicles to be provided below grade. Project includes 29,7 cu. Yds. For grading. (design review under project #2204305.) Applicant: Patterson-Ohare, Jodi | Current use: Commercial | Permit id: 3018078 | |||||
SCORE 95 Wall panels, handrails. Applicant: Vertical Dimensions Llc | Permit type: Conveyance | Permit status: Permit issued | Expiration date: July 20, 2018 | Permit id: 6572895 | |||||
SCORE 100 Install piping for a/c units Date: August 26, 2016 Contractor: Comfort Systems Usa Inc Applicant: Comfort Systems Usa (nw) Inc | Permit type: Refrigeration | Permit status: Permit issued | Expiration date: February 26, 2018 | Current use: Commercial | Permit id: 6553414 | |||||
SCORE 99 Pressure vessell for domestic water booster pump Date: May 26, 2017 Contractor: Tristate Plumbing Inc Applicant: Tri-State Plumbing Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: November 26, 2018 | Current use: Multifamily | Permit id: 6599080 | |||||
SCORE 99 New domestic hot water system (expansion tank) Date: May 26, 2017 Contractor: Tristate Plumbing Inc Applicant: Tri-State Plumbing Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: November 26, 2018 | Current use: Multifamily | Permit id: 6599077 | |||||
SCORE 95 Install a low voltage fire alarm system/fire fighter telephone system per plan. 2/25/16vp: joint venture with independent eletrical contractors. Date: February 17, 2016 Contractor: Independent Elec Contr Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: February 17, 2017 | Current use: Multifamily | Permit id: 6511236 | |||||
SCORE 95 Electrical & low voltage wiring for new 157 units mixed use building [no fire alarm] 2/24/16vp: corrected address from 20 e madison st. To 2026 e madision st. Permit type: Electrical | Permit status: Permit issued | Expiration date: February 22, 2017 | Current use: Commercial | Permit id: 6501073 | |||||
SCORE 99 New domestic hot water system (storage tank) Date: May 26, 2017 Contractor: Tristate Plumbing Inc Applicant: Tri-State Plumbing Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: November 26, 2018 | Current use: Multifamily | Permit id: 6599081 | |||||
SCORE 99 2 25 2016 - cancelled customer log #16-281[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will be installed on roof of residence. Date: February 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520181 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will installed on roof of a multi-family dwelling. 10 27 16 jk added revision for review. 10 27 16 jk approved revised plans. 03 09 2017 ndm renewal. Date: February 1, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 5, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6516598 | |||||
SCORE 99 New domestic hot water system (water heater) Date: May 26, 2017 Contractor: Tristate Plumbing Inc Applicant: Tri-State Plumbing Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: November 26, 2018 | Current use: Multifamily | Permit id: 6599084 | |||||
SCORE 100 Install piping for a c units Date: August 26, 2016 Contractor: Comfort Systems Usa Inc Applicant: Comfort Systems Usa (nw) Inc | Permit type: Refrigeration | Permit status: Permit closed | Completion date: December 6, 2017 | Expiration date: February 26, 2018 | Current use: Commercial | Permit id: 6553414 | |||||
Canceled pending fees 5 2 2014 jhon hold pending fees 4 2 14 jh. Land use application to allow a six-story structure containing 9,576 sq. Ft. Of commercial space at ground level and 222 residential units above. Parking for 229 vehicles to be provided below grade. Project includes 29,7 cu. Yds. For grading. (design review under project #2204305.) Applicant: Patterson-Ohare, Jodi | Current use: Commercial | Permit id: 3018078 | |||||
SCORE 100 New sanitary connection to main. One new storm drain connection to storm main. Pe eval and cert reqd. Cap exist. Side sewers. Assoc. Bldg. Permit #6426745. (mcb: extended to 08 31 2017) Date: October 20, 2015 Contractor: Cornerstone Const Seattle Inc Applicant: Cornerstone Const/seattle Inc | Permit type: Side sewer | Permit status: Permit issued | Completion date: October 25, 2017 | Expiration date: April 20, 2017 | Current use: Commercial | Permit id: 6500805 |