Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: October 17, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Expired | Permit id: 561502 | |||||
Administrative permit Date: January 30, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 581656 | |||||
Zoning/use permit Date: June 20, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 541094 | |||||
Suppression permit Date: April 8, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 595407 | |||||
Plumbing permit Date: December 30, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 582232 | |||||
Mechanical permit Date: March 2, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 593510 | |||||
Plumbing permit Date: May 13, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 609841 | |||||
Electrical permit Date: March 13, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 595987 | |||||
New construction permit Date: October 17, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Expired | Permit id: 561502 | |||||
Administrative permit Date: January 30, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 581656 | |||||
Zoning use permit Date: June 20, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 541094 | |||||
Electrical permit Date: March 13, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 595987 | |||||
Suppression permit Date: April 8, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 595407 | |||||
Plumbing permit Date: December 30, 2014 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 582232 | |||||
Plumbing permit Date: May 13, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 609841 | |||||
Mechanical permit Date: March 2, 2015 Client: Gutstein Marc A Ladov Hillary | Permit status: Completed | Permit id: 593510 | |||||
For the new construction of an attached structure with roof access stair enclosure and roof deck; size and location as shown in the submitted plan application. For use as single family household living. Date: June 20, 2014 Client: Gutstein Marc A Ladov Hillary | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 20, 2014 | Permit id: 541094 | |||||
New construction of a sfd Date: October 17, 2014 Client: Gutstein Marc A Ladov Hillary | Permit type: New construction permit | Permit status: Expired | Completion date: September 10, 2015 | Permit id: 561502 | |||||
Amending building permit 561502 for a revision to party wall. Date: January 30, 2015 Client: Gutstein Marc A Ladov Hillary | Permit type: Administrative permit | Permit status: Completed | Completion date: February 26, 2015 | Permit id: 581656 | |||||
SCORE 89 Install 1 hvac unit with ductwork(sfd) Date: March 2, 2015 Contractor: Alkaun Co Client: Gutstein Marc A Ladov Hillary | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 12, 2015 | Permit id: 593510 | |||||
Amend permit #561502 deletion of front egress well on york st. No bedrooms in the basement as per original floor plan(ap# 561502) egress well in the rear yard that leads to easement. New co Date: June 1, 2015 Client: Gutstein Marc A Ladov Hillary | Permit type: Administrative permit | Permit status: Completed | Completion date: June 29, 2015 | Permit id: 600733 | |||||
SCORE 96 Sewer ejector pit, 3 water closets, 3 lavy sinks, 1 bar sink, 1 kitchen sink, 1 bathtub, 1 shower 1 washer box - the installation will compy with the philadephia plubming code 2004 Date: December 30, 2014 Contractor: Pipe Tech Plumbing And Heating I Client: Gutstein Marc A Ladov Hillary | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 12, 2015 | Permit id: 582232 | |||||
SCORE 100 For the installation of a fire supression system for a single family dwelling serviced by one inch combined fire service line with a water meter assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire supression system to be installed in accordance with nfpa 13d. Separate permits required for all other work. Date: April 8, 2015 Contractor: Shannon Fire Protection Client: Gutstein Marc A Ladov Hillary | Permit type: Suppression permit | Permit status: Completed | Completion date: September 12, 2015 | Permit id: 595407 | |||||
SCORE 100 Install new overhead 150amp service with grounding and install all wiring through out switches, recepts, lights and inter connected smoke detectors as per 2008 nec (east district) Date: March 13, 2015 Contractor: Raw Power Electric Client: Gutstein Marc A Ladov Hillary | Permit type: Electrical permit | Permit status: Completed | Completion date: November 17, 2015 | Permit id: 595987 | |||||
SCORE 96 5"lateral,curb trap,fai and 1" domestic water service pa20151204215(sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: May 13, 2015 Contractor: Pipe Tech Plumbing And Heating I Client: Gutstein Marc A Ladov Hillary | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 21, 2015 | Permit id: 609841 |