Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Apt.#3l: trace repair all leaks in bathroom. Install new g. W. B in bathroom ceiling approx. (42 sq. Ft.) scrape prime paint walls and ceiling. No Date: May 16, 2005 Permit type: Gc | Permit id: E531385 | |||||
(apt. #4r) at room east (3) & room north east (4): trace and repair the source of water leak and loose plaster. At room east (3): ceiling 25 sq. Ft. Date: April 3, 2008 Permit type: Gc | Permit id: E821266 | |||||
Local law #1 violation : as per rc 20030025080603 (pdg)and attached scope of work thoroughly remove all lead violations as per new york city admini Date: December 15, 2004 Permit type: Delead | Permit id: E514978 | |||||
Apt 3r) from cellar to apt#3r, make necesary repairs to the existing gas line. Then call key span to install the gas meter and restore to p-w-o. Als Date: August 7, 2006 Permit type: Plumb | Permit id: E703746 | |||||
Replace defective window in bathroom, of apt. # 4-w. Install ( 1) window brick to brick and finish inside wall. Use double hung aluminum window. Date: April 2, 2002 Permit type: Gc | Permit id: E217173 | |||||
Trace and repair source of concealed water leak effecting ph / bulkhead ceiling / walls. At a minimum provide and install 90lb asphaltic roll roofin Date: October 8, 2010 Permit type: Gc | Permit id: Eb10996 | |||||
Supply and install complete system of public lights to include 5-4 vandal proof fluorescent fixtures.(one in each landing) (and 2 in lobby) with re Date: April 8, 2002 Permit type: Elec | Permit id: E217476 | |||||
Public area: secure the 3rd tread from the 4th floor down at front fire escape. Remove all work related debris. Note: contractor must contact hpd Date: March 12, 2007 Permit type: Gc | Permit id: E724124 | |||||
Public area) replace with new thr broken side glass at building entrance door. Remove all work related debris. Note: contractor must conta Date: June 22, 2007 Permit type: Gc | Permit id: E732898 | |||||
Public area: replace main entrance door lock with proper lock set and provide each tenant with a key. Note: contract must contract hpd @ (718) 63 Date: April 25, 2003 Permit type: Intcom | Permit id: E320479 | |||||
Public area roof and publichall at roof / bulkhead roof trace and repair the source of concealed leaks effecting the ceilings at publichall. Using 9 Date: September 3, 2010 Permit type: Gc | Permit id: Eb08561 | |||||
Install (1) window stop at the 2. 5 intermediate landing also the 3. 5 landing and the 4. 5 landing. Date: November 13, 2009 Value: $54 Permit type: Gc | Permit id: Ea16536 | |||||
Apt #4r) at bathroom : install (1) window guard, at kitchen and living room install (8 each rooms) one way screws, and at bedroom#4 install (4) one wa Date: March 17, 2008 Value: $163 Permit type: Gc | Permit id: E826309 | |||||
Apt 4l: install window guards complete in kitchen, livingroom, first bedroom, second bedroom, third bedroom, bathroom (a total of seven windows) Date: September 29, 2006 Value: $135 Permit type: Gc | Permit id: E709599 | |||||
Apartment #4w: kitchen: reinstall 1 window guard and stop. Livingroom: reinstall 3 window guards and stops. Bedroom: re-install 1 window guard a Date: October 31, 2003 Permit type: Gc | Permit id: E408057 | |||||
Apartment #3e: bathroom: install 1 window guard and stop. Date: April 14, 2003 Value: $32 Permit type: Gc | Permit id: E320474 | |||||
Apartment # 4e livingroom: install 4 w/gs and stops. Bedroom: install 3 w/gs and stops. Bathroom: install 1 w/g and stop. Date: May 29, 2002 Permit type: Gc | Permit id: E221046 | |||||
P/a.: 1st. Story; install 1 window guard and stop. 2nd. Story; install 1 window guard and stop. 3rd. Story; install 1 window guard and stop. 4th. Date: May 22, 2002 Value: $200 Permit type: Gc | Permit id: E220672 | |||||
Apt.# 2-e: remove mildew form bathroom walls and ceiling. Apply stain killer, prime & paint. Date: March 26, 2002 Value: $321 Permit type: Gc | Permit id: E217176 | |||||
SCORE 100 Date: August 10, 2007 Contractor: Derrick Durgana Client: Damiola Akinola | Client Address: 2018 Bergen St Brklyn Ny 11201 | Client Phone: (718) 922-6460 | Permit status: Initial | Permit id: 302220889 | |||||
SCORE 98 Date: January 31, 1995 Contractor: Gurcharan Singh Client: Michael Van Biema | Client Address: 75 Maiden Lane New York Ny 10038 | Client Phone: (212) 806-8324 | Client Company: Div. Of Maintenance/hpd | Permit status: Initial | Permit id: 300414727 | |||||
SCORE 99 Date: December 30, 2003 Contractor: Brian Crockwell Client: Janet Johnson | Client Address: 2018 Bergen Street Brooklyn Ny 11233 | Client Phone: (718) 647-8472 | Permit status: Initial | Permit id: 301671536 | |||||
P a.: 1st. Story; install 1 window guard and stop. 2nd. Story; install 1 window guard and stop. 3rd. Story; install 1 window guard and stop. 4th. Date: May 22, 2002 Value: $200 Permit type: Gc | Permit id: E220672 | |||||
Apartment # 4e livingroom: install 4 w gs and stops. Bedroom: install 3 w gs and stops. Bathroom: install 1 w g and stop. Date: May 29, 2002 Permit type: Gc | Permit id: E221046 | |||||
Public area roof and publichall at roof bulkhead roof trace and repair the source of concealed leaks effecting the ceilings at publichall. Using 9 Date: September 3, 2010 Permit type: Gc | Permit id: Eb08561 | |||||
Trace and repair source of concealed water leak effecting ph bulkhead ceiling walls. At a minimum provide and install 90lb asphaltic roll roofin Date: October 8, 2010 Permit type: Gc | Permit id: Eb10996 |