Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: August 10, 2015 Permit status: Completed | Permit id: 631040 | |||||
Mechanical permit Date: July 10, 2015 Permit status: Completed | Permit id: 615048 | |||||
Plumbing permit Date: November 6, 2015 Permit status: Completed | Permit id: 634003 | |||||
Use permit Date: July 10, 2012 Permit status: Completed | Permit id: 415468 | |||||
Alteration permit Date: June 30, 2015 Permit status: Completed | Permit id: 612402 | |||||
Electrical permit Date: September 11, 2015 Permit status: Expired | Permit id: 637084 | |||||
Zoning/use permit Date: October 28, 2015 Permit status: Completed | Permit id: 631747 | |||||
Sign permit Date: October 28, 2015 Permit status: Completed | Permit id: 641596 | |||||
Use permit Date: May 4, 2015 Permit status: Completed | Permit id: 592789 | |||||
Special exception for the take-out restaurant on first floor and accessory storage on cellar in an existing structure. No sign on this application. Date: March 13, 2015 Applicant: Alan Krawitz | Permit type: Appeal | Permit status: Granted/prov | Completion date: April 30, 2015 | Permit id: 24795 | |||||
Sign permit Date: October 28, 2015 Permit status: Completed | Permit id: 641596 | |||||
Suppression permit Date: July 16, 2015 Permit status: Completed | Permit id: 624012 | |||||
Electrical permit Date: September 11, 2015 Permit status: Expired | Permit id: 637084 | |||||
Alteration permit Date: June 30, 2015 Permit status: Completed | Permit id: 612402 | |||||
Plumbing permit Date: November 6, 2015 Permit status: Completed | Permit id: 634003 | |||||
Mechanical permit Date: July 10, 2015 Permit status: Completed | Permit id: 615048 | |||||
Use permit Date: May 4, 2015 Permit status: Completed | Permit id: 592789 | |||||
Use permit Date: July 10, 2012 Permit status: Completed | Permit id: 415468 | |||||
Zoning use permit Date: October 28, 2015 Permit status: Completed | Permit id: 631747 | |||||
Special exception for the take-out restaurant on first floor and accessory storage on cellar in an existing structure. No sign on this application. Date: March 13, 2015 Applicant: Alan Krawitz | Permit type: Appeal | Permit status: Granted/prov | Completion date: April 30, 2015 | Permit id: 24795 | |||||
SCORE 100 Install domestic back flow-the installation will comply with the philadephia plubming code 2004 Date: November 20, 2015 Contractor: Ed Scannapieco Plumbing Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 653581 | |||||
Installation of awning over the window outside of the property Date: October 28, 2015 Permit type: Sign permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 641596 | |||||
SCORE 100 Replace (1) pull stgastion @ rear door onto existing wiring. Replace (10) smoke detectors (over years old) onto existing wiring. Replace (5) painted over horns onto existing wiring. (all devices painted over) as per 2008 nec. (cc district) Date: September 11, 2015 Contractor: Sommerville William Permit type: Electrical permit | Permit status: Expired | Completion date: September 11, 2015 | Permit id: 637093 | |||||
SCORE 100 Install (8) emergency combo units onto existing wiring. Install (4) emergency light units onto existing wiring. Install (7) 1 volt smoke alarms inside the apartments onto existing wiring as per 2008 nec. (cc district) Date: September 11, 2015 Contractor: Sommerville William Permit type: Electrical permit | Permit status: Expired | Completion date: September 11, 2015 | Permit id: 637084 | |||||
SCORE 100 Relocation of (9) fire sprinklers Date: August 10, 2015 Contractor: Edwards Fire Protection Permit type: Suppression permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 631040 | |||||
The application is for the erection of awning sign in front of the first floor of an existing attach structure, accessory to an existing take out restaurant with other uses as previously approved on the same existing structure(size and location as shown in the application). Date: October 28, 2015 Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 631747 | |||||
SCORE 89 Interior plumbing alterations on the 1st floor and basement for a take-out restaurant (revolution taco) - the installation will comply with the phila plumbing code 2004 tables p-811. 2, p-904. 7 and the water supplies to fixtures equipment will be protected by an isolation method listed in table 608. 1 of the 2009 ipc (international plumbing code) - note: the backflow prevention containment device installation at the water meter will be done "by others" (separate permit required) - fuel gas requires a separate permit Date: November 6, 2015 Contractor: Thomas D Lepore Permit type: Plumbing permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 634003 | |||||
SCORE 100 Install new kitchen and dining room lighting. Install (2) amp circuits for bamboree. Install (2) amp circuits in kitchen for exhaust as per 2008 nec. (cc district) Date: September 9, 2015 Contractor: Ar Electric Llc Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2016 | Permit id: 637059 | |||||
Use to property management and real estate office Date: July 10, 2012 Permit type: Use permit | Permit status: Completed | Completion date: July 10, 2012 | Permit id: 415468 | |||||
Convert vacant commercial space for use as a take -out restaurant with seating (customers pay for food before consumption) Date: May 4, 2015 Permit type: Use permit | Permit status: Completed | Completion date: May 4, 2015 | Permit id: 592789 | |||||
SCORE 94 For interior level 2 alterations with change of occupancy as per plans. Separate permits required for mechanical, electrical, plumbing Date: June 30, 2015 Contractor: Carmine Varallo Permit type: Alteration permit | Permit status: Completed | Completion date: December 23, 2015 | Permit id: 612402 | |||||
SCORE 99 Install hood with ductwork and fans as per plan. Date: July 10, 2015 Contractor: Reliable Fire Protection Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: February 24, 2016 | Permit id: 615048 | |||||
SCORE 99 Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Install a new fire suppression system for a hood. Phc approval stamp dayed 7 16 15 Date: July 16, 2015 Contractor: Reliable Fire Protection Inc Permit type: Suppression permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 624012 |