Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: July 22, 2010 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Completed | Permit id: 292567 | |||||
Plumbing permit Date: September 12, 2011 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Completed | Permit id: 362422 | |||||
Alteration permit Date: May 25, 2010 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Expired | Permit id: 281304 | |||||
Plumbing permit Date: December 17, 2007 Client: Sokol Wilma A Sokol Alexander A | Permit status: Completed | Permit id: 122014 | |||||
Alteration permit Date: July 22, 2010 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Expired | Permit id: 289454 | |||||
Plumbing permit Date: July 22, 2010 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Completed | Permit id: 292567 | |||||
Plumbing permit Date: December 17, 2007 Client: Sokol Wilma A Sokol Alexander A | Permit status: Completed | Permit id: 122014 | |||||
Plumbing permit Date: September 12, 2011 Client: Zyla Michael M Shofer-Zyla Frances S | Permit status: Completed | Permit id: 362422 | |||||
SCORE 100 Repair water service at curb Date: December 17, 2007 Contractor: Edward Hughes And Sons Inc Client: Sokol Wilma A Sokol Alexander A | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 24, 2008 | Permit id: 122014 | |||||
Erect rooftop deck with access pilot house (for stairs and landing only). Install metal gates (four feet, max height) adjacent to footway. Date: October 19, 2017 Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Zoning permit | Permit status: Completed | Completion date: October 19, 2017 | Permit id: 775726 | |||||
Construct new roof deck, pilot house, install new elevator, and interior renovations as shown on plans. Date: October 19, 2017 Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Addition permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 775727 | |||||
SCORE 100 Replace 4" darin line to receive rain leader from roof - pa1 call# 2011-2540176 Date: September 12, 2011 Contractor: Pasquarello Plumbing And Heating Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 13, 2013 | Permit id: 362422 | |||||
SCORE 100 Installing fixtures only on water closet, 3 lav in shower room,install drain and water lines to kitchen sink. Rear yard rain conductor Date: July 22, 2010 Contractor: Nicademo Saturno Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 14, 2011 | Permit id: 292567 | |||||
SCORE 99 For the structural repairs as identified by the professional engineer of record. The work scope shall require the repiars to be made in whole as to be in complete compliance with the engineers report. The engineer shall present the field inspector with a compliance report noting the completed work is compliance with the engineered design. A separate permit is required for the approval of the facade balcony. Date: July 22, 2010 Contractor: Americon Inc Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Alteration permit | Permit status: Expired | Completion date: February 7, 2016 | Permit id: 289454 | |||||
SCORE 99 Install sheetrock, tape and spackle, install millwork, install hardwood flooring and install kitchen and bath. Separate permits for mechanical,plumbing and electric. Date: May 25, 2010 Contractor: Americon Inc Client: Zyla Michael M Shofer-Zyla Frances S | Permit type: Alteration permit | Permit status: Expired | Completion date: January 3, 2013 | Permit id: 281304 |