Building Permits at 2 Saint Thomas More Brighton MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2 Saint Thomas More Brighton MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Cutting &;welding of 8" of 4 pipe that provides heating hot water &; domestic hot water for residence (dpl) bfd paid detail required
Date:  November 25, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw429599
2014/11/250952 Saint Thomas More Brighton Ma
Edmonds hall
Date:  June 2, 2016

Client: Boston College Trs Of | Permit type: Bfd asbestos removal | Permit id: Asb598043 | Parcel: 2102473001
2016/06/020952 Saint Thomas More Brighton Ma
SCORE
82
Install on private property a temporary chain link fence around the perimeter of existing building for asbestos removal and future demolition of structure.
Date:  May 23, 2016
Value:   $25,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Short form bldg permit | Expiration date: November 23, 2016 | Current use: Comm | Permit id: Sf594624 | Parcel: 2102473001
2016/05/2325000822 Saint Thomas More Brighton MaAlexander Macleod
SCORE
99
Complete demolition of existing structure
Date:  August 9, 2016
Value:   $700,000
Contractor: Diane Miller

Client: Boston College Trs Of | Permit type: Short form bldg permit | Expiration date: February 9, 2017 | Current use: Other | Permit id: Sf622471 | Parcel: 2102473001
2016/08/09700000992 Saint Thomas More Brighton MaDiane Miller
Building is being torn down need to remove fire alarm and masterbox out of the building doc20160740 (to internal systems supervisor for master box removal)
Date:  March 30, 2017

Client: Boston College Trs Of | Permit type: Bfd fire alarm installations | Permit id: Bfdf599621 | Parcel: 2102473001
2017/03/300952 Saint Thomas More Brighton Ma
SCORE
82
Mobilizing equipment to start installing 664 pressure injected footings plans are filed and submitted with ert619401.
Date:  April 3, 2017
Value:   $300,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Short form bldg permit | Expiration date: October 3, 2017 | Current use: Comm | Permit id: Sf690210 | Parcel: 2102473001
2017/04/03300000822 Saint Thomas More Brighton MaAlexander Macleod
SCORE
82
Complete electrical system for the new construction of a recreation center.
Date:  April 10, 2017
Value:   $3,800,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Electrical permit | Expiration date: October 10, 2017 | Current use: Vacld | Permit id: E693500 | Parcel: 2102473001
2017/04/103800000822 Saint Thomas More Brighton MaMike Abbott
SCORE
82
Temporary service for the use of site office trailers and a separate temp service for the use of the new construction building.
Date:  April 5, 2017
Value:   $25,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Electrical temporary service | Expiration date: October 5, 2017 | Current use: Vacld | Permit id: Ets693434 | Parcel: 2102473001
2017/04/0525000822 Saint Thomas More Brighton MaMike Abbott
SCORE
82
Complete addressable fire alarm system for new construction recreation center
Date:  May 15, 2017
Value:   $300,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Electrical fire alarms | Expiration date: November 15, 2017 | Current use: Vacld | Permit id: Efa693516 | Parcel: 2102473001
2017/05/15300000822 Saint Thomas More Brighton MaMike Abbott
SCORE
89
Our scope is installing metal framing partitions and drywall by cutting metal studs for framing installations and hanging drywall. We will use hand snips to cut or a chop saw with non-spark blades out of a rolling fireproof cutting station with sidewall pockets that have fire blanket drapes. (dpl 4 1 19)
Date:  May 2, 2017
Contractor: Tony Lopez

Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw703758 | Parcel: 2102473001
2017/05/020892 Saint Thomas More Brighton MaTony Lopez
SCORE
83
Installation of new domestic water sanitary & storm water systems
Date:  May 23, 2017
Value:   $400,000
Contractor: Jennifer Galland

Client: Boston College Trs Of | Permit type: Plumbing permit | Expiration date: November 23, 2017 | Current use: Other | Permit id: Pl711708 | Parcel: 2102473001
2017/05/23400000832 Saint Thomas More Brighton MaJennifer Galland
SCORE
99
Construct new recreation center lpr (2) sets
Date:  June 19, 2017
Value:   $75,000,000
Contractor: Sandy Macleod

Client: Boston College Trs Of | Permit type: Erect/new construction | Expiration date: December 19, 2017 | Current use: Comm | Permit id: Ert619401 | Parcel: 2102473001
2017/06/1975000000992 Saint Thomas More Brighton MaSandy Macleod
SCORE
56
Cutting of reinforcing steel for cast in place concrete operations with a demo saw or grinder (dpl) . The tools used to cut the reinforcing steel will be either a 4" hand held grinder with a metal cutting wheel or a hand held demo saw (gas powered 14" power cutter) with a metal cutting blade (dpl)
Date:  June 26, 2017
Contractor: Scott Bulger

Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw722861 | Parcel: 2102473001
2017/06/260562 Saint Thomas More Brighton MaScott Bulger
SCORE
56
Installation of pressure injected footings for new construction. This will involve intermittent cutting burning grinding and welding metal to install the piles and to also intermittently perform repairs on installation equipment. Work will be performed outside in an open field at ground level (dpl 9 30 17)
Date:  March 28, 2017
Contractor: Anne Mcmahon

Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw692135 | Parcel: 2102473001
2017/03/280562 Saint Thomas More Brighton MaAnne Mcmahon
;: applicant to follow nfpa 241 : nfpa 1 sec. 16. 2. 3-16. 2. 3. 2. 4 to conduct the folliwng fuel storage of gasoline and diesel. Not to exceed gallons. Fuel cans to be stored in the gallon capacity saftey cabinet
Date:  March 13, 2017

Client: Boston College Trs Of | Permit type: Bfd general permit | Permit id: Gp687908 | Parcel: 2102473001
2017/03/130952 Saint Thomas More Brighton Ma
SCORE
97
Cutting welding and burning for the installation of sheet piling (dpl 5-15-2017)
Date:  March 27, 2017
Contractor: David Hill

Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw689757 | Parcel: 2102473001
2017/03/270972 Saint Thomas More Brighton MaDavid Hill
SCORE
82
Install one triple wide construction trailer on site in conjunction with ert619401; also install approx 500lin feet of chain link fence; install approx 8 lin ft of temporary sheathing; perform exploratory excavation around site in preparation for foundation work.
Date:  March 7, 2017
Value:   $200,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Short form bldg permit | Expiration date: September 7, 2017 | Current use: Comm | Permit id: Sf686417 | Parcel: 2102473001
2017/03/07200000822 Saint Thomas More Brighton MaAlexander Macleod
SCORE
83
Cutting burning welding for the installation of heating cooling gas piping fuel oil lines and associated support system for the new construction at boston college recreation center. This is new construction (dpl)
Date:  July 13, 2017
Contractor: Jennifer Galland

Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw729869 | Parcel: 2102473001
2017/07/130832 Saint Thomas More Brighton MaJennifer Galland
SCORE
82
Complete addressable fire alarm system for new construction recreation center
Date:  May 15, 2017
Value:   $300,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Fire alarm | Permit status: Open | Current use: Vacld | Permit id: Efa693516 | Parcel: 2102473001
2017/05/15300000822 Saint Thomas More Brighton Ma 02467Mike Abbott
SCORE
83
Installation of new domestic water sanitary & storm water systems
Date:  May 23, 2017
Value:   $400,000
Contractor: Jennifer Galland

Client: Boston College Trs Of | Permit type: Plumbing | Permit status: Open | Current use: Other | Permit id: Pl711708 | Parcel: 2102473001
2017/05/23400000832 Saint Thomas More Brighton Ma 02467Jennifer Galland
SCORE
99
Construct new recreation center lpr (2) sets
Date:  June 19, 2017
Value:   $75,000,000
Contractor: Sandy Macleod

Client: Boston College Trs Of | Permit type: Erect | Permit status: Open | Current use: Comm | Permit id: Ert619401 | Parcel: 2102473001
2017/06/1975000000992 Saint Thomas More Brighton Ma 02467Sandy Macleod
SCORE
82
Install one triple wide construction trailer on site in conjunction with ert619401; also install approx 500lin feet of chain link fence; install approx 8 lin ft of temporary sheathing; perform exploratory excavation around site in preparation for foundation work.
Date:  March 7, 2017
Value:   $200,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Other | Permit status: Open | Current use: Comm | Permit id: Sf686417 | Parcel: 2102473001
2017/03/07200000822 Saint Thomas More Brighton Ma 02467Alexander Macleod
SCORE
82
Mobilizing equipment to start installing 664 pressure injected footings plans are filed and submitted with ert619401.
Date:  April 3, 2017
Value:   $300,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Renovations - exterior | Permit status: Open | Current use: Comm | Permit id: Sf690210 | Parcel: 2102473001
2017/04/03300000822 Saint Thomas More Brighton Ma 02467Alexander Macleod
SCORE
82
Temporary service for the use of site office trailers and a separate temp service for the use of the new construction building.
Date:  April 5, 2017
Value:   $25,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Temporary service | Permit status: Open | Current use: Vacld | Permit id: Ets693434 | Parcel: 2102473001
2017/04/0525000822 Saint Thomas More Brighton Ma 02467Mike Abbott
SCORE
82
Complete electrical system for the new construction of a recreation center.
Date:  April 10, 2017
Value:   $3,800,000
Contractor: Mike Abbott

Client: Boston College Trs Of | Permit type: Electrical | Permit status: Open | Current use: Vacld | Permit id: E693500 | Parcel: 2102473001
2017/04/103800000822 Saint Thomas More Brighton Ma 02467Mike Abbott
SCORE
82
Install on private property a temporary chain link fence around the perimeter of existing building for asbestos removal and future demolition of structure.
Date:  May 23, 2016
Value:   $25,000
Contractor: Alexander Macleod

Client: Boston College Trs Of | Permit type: Fencing renovation < 6ft | Permit status: Expired | Current use: Comm | Permit id: Sf594624 | Parcel: 2102473001
2016/05/2325000822 Saint Thomas More Brighton Ma 02467Alexander Macleod
SCORE
99
Complete demolition of existing structure
Date:  August 9, 2016
Value:   $700,000
Contractor: Diane Miller

Client: Boston College Trs Of | Permit type: Removal of structure | Permit status: Open | Current use: Other | Permit id: Sf622471 | Parcel: 2102473001
2016/08/09700000992 Saint Thomas More Brighton Ma 02467Diane Miller
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?