Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Gratis permit dpw project #st-25-162: georgia st/super bowl; utility excavation for steam for c Date: September 29, 2010 Contractor: Michael Thompson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row10-05814 | |||||
Food and beer tasting festival to benefit the cystic fibrosis foundation Date: July 27, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-04245 | |||||
SCORE 96 Installation of air handler and air conditioner in the elevator room Date: February 1, 2012 Contractor: Stanley Peterman Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg12-00637 | |||||
SCORE 93 Right of way Date: July 2, 2010 Contractor: Abby Cudworth Client: Station Place Llc % Thrasher Realty Corporation | Permit status: Complete | Permit id: Row10-03772 | |||||
SCORE 93 Replacing hydrants valves and water main along georgia street between illinois street and meridian s Date: September 27, 2010 Contractor: Abby Cudworth Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row10-05691 | |||||
SCORE 96 Repairing low pressure steam leak Date: November 9, 2010 Contractor: Scott Herald Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row10-06698 | |||||
Ihpc wholesale district / parking lot improvements/reconfiguration & new ticket booth / 21465 sf / Date: July 25, 2011 Client: Denison Parking | Permit type: Improvement location permit | Permit status: Issued | Expiration date: August 17, 2013 | Permit id: Ilp11-01253 | |||||
SCORE 96 Build out 2 condos: installing two 2-ton heat pumps one for each unit and the ductwork registers an Date: August 30, 2011 Contractor: Amy Pauley Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg11-06895 | |||||
Indiana elevator safety code section 2. 7. 6-the elevator will not be provided with a separate machine Date: August 27, 2012 Client: Janus Bldg Mgmt Llc | Permit type: State variance | Permit status: Closed | Completion date: August 27, 2012 | Permit id: Svr03-00165 | |||||
SCORE 69 Installing new driveway from parking lot to meridian takiing parking lot down to sidewalk level at Date: September 16, 2011 Contractor: Danny Maish Client: Palace At Union Station Inc | Permit type: Driveway | Permit status: Issued | Permit id: Drv11-00493 | |||||
SCORE 96 Public improvement - 1 asphalt cut in north side lane of louisiana street and 1 asphalt cut in merid Date: November 3, 2010 Contractor: Vicky Burton Permit type: Right of way | Permit status: Complete | Permit id: Row10-06509 | |||||
SCORE 96 Remodel Date: August 2, 2010 Contractor: Jerry Bratton Client: Rakesh Goyal | Permit type: Plumbing | Permit status: Issued | Expiration date: June 8, 2011 | Permit id: Plm10-01170 | |||||
SCORE 96 Installation of air handler and air conditioner in the elevator room Date: February 1, 2012 Contractor: Kristy Muse Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg12-00637 | |||||
Spaghetti factory Date: July 26, 2012 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Encroachment | Permit status: Complete | Permit id: Enc12-00065 | |||||
SCORE 96 Build out 2 condos: installing two 2-ton heat pumps one for each unit and the ductwork registers an Date: August 30, 2011 Contractor: Phillip Compton Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg11-06895 | |||||
Install sign reading: el rodeo mexican restaurant & bar. Date: September 29, 2011 Permit type: Encroachment | Permit status: Complete | Permit id: Enc11-00149 | |||||
SCORE 96 Adding two new apartment units on an existing floor. New electrical wiring for the new units Date: September 28, 2011 Contractor: Mark Purcell Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03313 | |||||
2008 indiana building code section 3410. 6. 11-existing stair handrails do not comply with current cod Date: July 16, 2010 Permit type: State variance | Permit status: Approved | Permit id: Svr10-00115 | |||||
SCORE 96 Electrical remodel of existing structure. Date: August 11, 2010 Contractor: Stephen Land Permit type: Electrical | Permit status: Issued | Expiration date: August 13, 2011 | Permit id: Ele10-02442 | |||||
SCORE 96 Main repair - contractor hit gas line - actual cut in 2 mccrea st. Date: October 13, 2010 Contractor: Vicky Burton Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row10-06107 | |||||
2008 indiana mechanical code section 504. 6. 1-clothes dryer exhaust ducts will exceed the maximum per Date: July 16, 2010 Permit type: State variance | Permit status: Approved | Permit id: Svr10-00114 | |||||
SCORE 96 Service repair Date: April 25, 2011 Contractor: Vicky Burton Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02220 | |||||
SCORE 93 Change out exist disconnect to lockable and fuseable. Run conduit and circuits for elevator and pit. Date: February 22, 2012 Contractor: James Lozinak Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele12-00610 | |||||
SCORE 89 6 sfinstallation date: 7-26-14 removal date: 7-26-14eme Date: July 29, 2014 Contractor: Kevin Schwab Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Notification | Permit status: Open | Permit id: Not14-01341 | |||||
SCORE 89 6 sfinstallation date: 7-26-14 removal date: 7-26-14eme Date: July 29, 2014 Contractor: Jack Hawkin Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Notification | Permit status: Open | Permit id: Not14-01341 | |||||
Blocking meters 54 -5461 /parking busesemergency contact alec synnestvedt 248-561-9357 Date: February 7, 2014 Client: Janus Bldg Mgmt Llc | Permit type: Right of way | Permit status: Complete | Permit id: Row14-00584 | |||||
17538 - block party during fdic - charity involved. Open to the public 21 and over. Live music bee Date: March 5, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-01012 | |||||
18496- block party / tailgate - football themed Date: August 19, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-04550 | |||||
18672- block party / tailgate - - 21 and over Date: September 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-05192 | |||||
18673- block party / 21 and over Date: September 16, 2014 Permit type: Right of way | Permit status: Void | Permit id: Row14-05193 | |||||
18675- block party / 21 and over Date: September 16, 2014 Permit type: Right of way | Permit status: Void | Permit id: Row14-05194 | |||||
SCORE 89 St. Patricks day tent party / 1 tent / 5400sf / installation date: 3-14-14 removal date: 3-16-14 / Date: March 4, 2014 Contractor: Kevin Schwab Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 17, 2014 | Expiration date: September 13, 2014 | Permit id: Str14-00613 | |||||
SCORE 89 St. Patricks day tent party / 1 tent / 5400sf / installation date: 3-14-14 removal date: 3-16-14 / Date: March 4, 2014 Contractor: Jack Hawkin Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 17, 2014 | Expiration date: September 13, 2014 | Permit id: Str14-00613 | |||||
Installation of build-a- bar structure / installed: 9/13/2014 / removed:9/14/2014 / emergency contac Date: September 3, 2014 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: September 13, 2014 | Expiration date: March 12, 2015 | Permit id: Str14-04607 | |||||
Installation of build-a-bar for big football championship event / installed: 12-6-2014 / removed: Date: December 1, 2014 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: December 6, 2014 | Expiration date: June 4, 2015 | Permit id: Str14-06286 | |||||
3 wide blade sign protruding from ne corner of bldg encroaches on georgia st side by about 1 Date: September 15, 2015 Client: Walter J Swyers Jr | Permit type: Encroachment | Permit status: Complete | Permit id: Enc15-00192 | |||||
Morris sub l1 & 29. 25ft n end l2 / 2 new awnings / ihpc wholesale district / coa # / Date: October 5, 2015 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Improvement location permit | Permit status: Open | Permit id: Ilp15-02066 | |||||
SCORE 89 Lane restrictions along north and south side of georgia st between meridian st and scioto st and alo Date: April 28, 2015 Contractor: Alex Sharpe Client: Palace At Union Station Inc | Permit type: Right of way | Permit status: Complete | Permit id: Row15-02083 | |||||
SCORE 86 Lane restrictions along north and south side of georgia st between meridian st and scioto st and alo Date: April 28, 2015 Contractor: Jana Lause Client: Palace At Union Station Inc | Permit type: Right of way | Permit status: Complete | Permit id: Row15-02083 | |||||
SCORE 96 Repair a steam leak in the curb lane of 2 s meridian. Meters: 72 - 7283dates: 10/6/15 thru 10/16 Date: September 29, 2015 Contractor: Scott Herald Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row15-04968 | |||||
SCORE 96 Repair a steam leak on georgia street in front of the restaurant hooters dates:10/6/15 thru 10/16/15 Date: September 29, 2015 Contractor: Scott Herald Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row15-04969 | |||||
SCORE 79 Installing sign/ blocking georgia st on 11/5 from 9am to 3pmemergency contact mickey levy 546-1111 Date: October 20, 2015 Contractor: Josh Zubcic Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row15-05374 | |||||
SCORE 96 Installing sign/ blocking georgia st on 11/5 from 9am to 3pmemergency contact mickey levy 546-1111 Date: October 20, 2015 Contractor: Mickey Levy Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row15-05374 | |||||
Zoning history letter / cbd2 rc / iphc wholesale district / center twp Date: July 10, 2015 Client: Palace At Union Station Inc | Permit type: Research | Permit status: Ready to issue | Permit id: Rsr15-01542 | |||||
Block party 21 and over event. Date: July 6, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-00788 | |||||
Block party 21 and over food beer alcohol soft drinks served. Date: August 18, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-00965 | |||||
Morris sub l1 & 29. 25ft n end l2 / new projecting 18 sf interior illuminated sign / the escape roo Date: August 26, 2015 Value: $5,000 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Issued | Expiration date: October 7, 2017 | Permit id: Sgn15-00665 | |||||
Morris sub l1 & 29. 25ft n end l2 / 3 new awning signs / north elevation / / the old spaghetti Date: October 5, 2015 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Open | Permit id: Sgn15-00786 | |||||
SCORE 89 Indy promotions st patricks party / 1 tent / 54 sf / installation date: 03/12/2015 / removal d Date: March 10, 2015 Contractor: Kevin Schwab Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 13, 2015 | Expiration date: September 9, 2015 | Permit id: Str15-00810 | |||||
SCORE 89 Indy promotions st patricks party / 1 tent / 54 sf / installation date: 03/12/2015 / removal d Date: March 10, 2015 Contractor: Jack Hawkins Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 13, 2015 | Expiration date: September 9, 2015 | Permit id: Str15-00810 | |||||
Rally on meridian tent / 132 sf / installation date: 3-31-2015 / removal date: 4-6-2015 / emergenc Date: March 31, 2015 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Issued | Expiration date: September 28, 2015 | Permit id: Str15-01225 | |||||
Fdic claddagh tent / 1 tent / 7200sf / installation date: 4-24-2015 removal date: 4-25-2015 / emerge Date: April 17, 2015 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Cancelled | Permit id: Str15-01560 | |||||
Fdic tent / 1 tent / 60 sf / installation date 4/22/2015 / removal date 4/25/2015 / emergency cont Date: April 17, 2015 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: April 22, 2015 | Expiration date: October 19, 2015 | Permit id: Str15-01567 | |||||
Installation of build-a- bar structure / installed: ??? / removed:???? / emergency contact: jason je Date: August 3, 2015 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: August 7, 2015 | Expiration date: February 3, 2016 | Permit id: Str15-03897 | |||||
Comm add within existing bldg footprint and existing bldg height / 212. 5 sf on penthouse apt / coa # Date: July 22, 2010 Client: Rakesh Goyal | Permit type: Improvement location permit | Permit status: Received | Permit id: Ilp10-01222 | |||||
SCORE 93 Dpw proj st-25-162 dpw proj mgr rick brost 327-2306 ##restricting traffic to one lane in each dir Date: January 7, 2011 Contractor: R G Hunt Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row11-00138 | |||||
SCORE 93 Temporary structure - 72 sf installed ~7: am weds 4-18-12removed ~11: pm weds 4-18-12 Date: April 3, 2012 Contractor: Timothy Simpson Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: May 2, 2012 | Expiration date: October 29, 2012 | Permit id: Str12-01168 | |||||
Event cancelled permit cancelled blocking parking lane and 2 meters #sm 224 & 226 on s meridian Date: August 16, 2011 Permit type: Right of way | Permit status: Cancelled | Permit id: Row11-04674 | |||||
SCORE 64 Super bowl xlvihost committee structure #19 - pepsi activation tenttemporary structure - 6 sflocat Date: January 20, 2012 Contractor: Allison Melangton Client: Vivid Marketing Llc | Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00270 | |||||
SCORE 96 Install of hvac and ductwork Date: August 13, 2010 Contractor: Marc Coffman Client: Rakesh Goyal | Permit type: Heating & cooling | Permit status: Issued | Expiration date: June 6, 2011 | Permit id: Htg10-04569 | |||||
Parking lot at the corner of s meridian and jackson street - for moto gp Date: February 27, 2012 Permit type: Right of way | Permit status: Cancelled | Permit id: Row12-01175 | |||||
Parking lot at the corner of s meridian and jackson street - for st patricks day Date: February 17, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-01023 | |||||
SCORE 96 Service repair Date: January 6, 2012 Contractor: Vicky Burton Permit type: Right of way | Permit status: Complete | Permit id: Row12-00097 | |||||
Installation of portable bar 2000sf for big championship / no signs to be visible on structure i Date: November 27, 2012 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Structural | Permit status: Closed | Completion date: December 10, 2012 | Expiration date: June 5, 2013 | Permit id: Str12-05894 | |||||
SCORE 96 For remodel install water and drain for (2) toilets (2) lavs (1) tub (1) shower (2) kitchens and (2) Date: September 20, 2011 Contractor: Jerry Bratton Client: Rakesh Goyal | Permit type: Plumbing | Permit status: Issued | Expiration date: July 14, 2012 | Permit id: Plm11-01532 | |||||
SCORE 86 Permit cancelled; duplicate of #row10-05814 resurfacing of s meridian for dpw project; use of cur Date: September 30, 2010 Contractor: Kathleen Thompson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Cancelled | Permit id: Row10-05822 | |||||
1998 indiana building code section 1005. 3. 3. 5-the new stair discharge corridor will have an opening Date: May 2, 2012 Client: Janus Bldg Mgmt Llc | Permit type: State variance | Permit status: Closed | Completion date: May 2, 2012 | Permit id: Svr03-00132 | |||||
SCORE 64 Super bowl xlvihost committee structure #19 - pepsi activation tenttemporary structure - 6 sflocat Date: January 20, 2012 Contractor: Shawn Hitchcock Client: Vivid Marketing Llc | Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00270 | |||||
2 s. Meridian stsidewalk cafe Date: May 12, 2010 Permit type: Research | Permit status: Open | Permit id: Rsr10-00541 | |||||
Block party for mens big ten tournament and supercross Date: February 22, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-00888 | |||||
SCORE 96 Self certification Date: July 20, 2012 Contractor: Jerry Toller Client: Station Place Llc % Thrasher Realty Corporation | Permit status: Authorized | Permit id: 38756 | |||||
Installation of non-illuminated projecting sign reading: the old spaghetti factory. Date: April 18, 2012 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Encroachment | Permit status: Complete | Permit id: Enc12-00030 | |||||
SCORE 89 Temporary structure - 72 sf installed ~7: am weds 4-18-12removed ~11: pm weds 4-18-12 Date: April 3, 2012 Contractor: Terrence Simpson Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: May 2, 2012 | Expiration date: October 29, 2012 | Permit id: Str12-01168 | |||||
SCORE 93 Gratis permit dpw project #bk-25-022: brick paver repair downtown area s meridian st btwn georgi Date: May 14, 2012 Contractor: Lisa Miller Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02821 | |||||
SCORE 98 Partial closure sidewalk parking lane reskin awning repairemergency contact john 534-9643 Date: December 12, 2012 Contractor: David Dean Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row12-07128 | |||||
Comm int/ext remodel of 2nd 3rd 4th and 5th floor & 7th floors 12246sf / cdr#346463/class a r-2 chan Date: June 3, 2010 Value: $700,000 Client: Rakesh Goyal | Permit type: Structural | Permit status: Permit amendment | Expiration date: March 28, 2012 | Current use: Other commercial | Permit id: Str10-01903 | |||||
Sidewalk & curb lane use on maryland to remove courtyard super bowl signage from 6: p. M. To 5: a Date: January 20, 2012 Permit type: Right of way | Permit status: Cancelled | Permit id: Row12-00368 | |||||
SCORE 98 Rack built with (3) 4 ridged posts concreted into the ground with 1 7/8 unistrut per ipalco (2) sets Date: September 12, 2012 Contractor: Mike Watson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Electrical | Permit status: Issued | Expiration date: June 26, 2013 | Permit id: Ele12-03404 | |||||
SCORE 84 Super bowl xlvibornes lottemporary tent9604 sfinstalled: 1/22/2012removed: 2/6/2012 Date: December 29, 2011 Contractor: Joseph Dodson Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str11-05095 | |||||
SCORE 93 Metes & bounds legal / 1 new wall sign on east elevation facing meridian street sf allowed (propo Permit type: Sign | Permit status: Issued | Expiration date: October 13, 2013 | Permit id: Sgn11-00904 | |||||
Use of curb lane & 4 meters on s meridian st for delivery unloading and planting of summer annuals i Date: April 30, 2012 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02587 | |||||
SCORE 96 Metes and bounds / 1 new projecting wall sign (20. 5 sf) per plans / located on east elevation / the Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Cancelled | Permit id: Sgn12-00372 | |||||
SCORE 98 Permit cancelled; duplicate of #row10-05814 resurfacing of s meridian for dpw project; use of cur Date: September 30, 2010 Contractor: Michael Thompson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Cancelled | Permit id: Row10-05822 | |||||
Food and beer tasting festival food and beer samples silent auction live entertainment and light act Date: June 27, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-03858 | |||||
Use of sidewalk parking lane 4 meters #sm 218220222224 and 1 traffic lane on south meridian st to Date: September 3, 2010 Permit type: Right of way | Permit status: Complete | Permit id: Row10-05209 | |||||
SCORE 95 Partial closure sidewalk parking lane reskin awning repairemergency contact john 534-9643 Date: December 12, 2012 Contractor: John Walker Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row12-07128 | |||||
Sidewalk & curb lane use on maryland to install motorola super bowl signage on 1/30/12 from 2: a. M Date: January 20, 2012 Permit type: Right of way | Permit status: Complete | Permit id: Row12-00367 | |||||
SCORE 82 Dpw proj st-25-162 dpw proj mgr rick brost 327-2306 ##restricting traffic to one lane in each dir Date: January 7, 2011 Contractor: R M Decker Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row11-00138 | |||||
SCORE 96 Install of hvac and ductwork Date: August 13, 2010 Contractor: Julie Ohern Client: Rakesh Goyal | Permit type: Heating & cooling | Permit status: Issued | Expiration date: June 6, 2011 | Permit id: Htg10-04569 | |||||
SCORE 96 Adding two new apartment units on an existing floor. New electrical wiring for the new units Date: September 28, 2011 Contractor: William Hornaday Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03313 | |||||
Food and beer tasting festival to benefit the cystic fibrosis foundation Date: July 25, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-04161 | |||||
Use of curb lane & meters on s meridian s illinois & south st for temporary taxi zones for new years Date: December 14, 2012 Permit type: Right of way | Permit status: Complete | Permit id: Row12-07146 | |||||
Block party at the time of moto gp - live music and alcoholic beverages. Annual event for 21 and ol Date: May 13, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-02550 | |||||
SCORE 96 Rack built with (3) 4 ridged posts concreted into the ground with 1 7/8 unistrut per ipalco (2) sets Date: September 12, 2012 Contractor: Jerry Toller Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Electrical | Permit status: Issued | Expiration date: June 26, 2013 | Permit id: Ele12-03404 | |||||
SCORE 86 Build out of loft apartments / adding receptacles lights switches and one 200amp panel Date: July 12, 2013 Contractor: Brent Cox Client: Rakesh Goyal | Permit type: Electrical | Permit status: Issued | Expiration date: January 12, 2014 | Permit id: Ele13-02874 | |||||
SCORE 96 Morris / 2nd floor remodel / new outlets / switches / light fixtures / cbd2 rc / center twp Date: December 18, 2013 Contractor: James Blanton Client: Clete Kunce | Permit type: Electrical | Permit status: Issued | Expiration date: July 11, 2014 | Permit id: Ele13-05521 | |||||
SCORE 96 Install (1) split system and ductwork. Date: April 3, 2013 Contractor: David Gooderum Client: Rakesh Goyal | Permit type: Heating & cooling | Permit status: Issued | Expiration date: May 26, 2014 | Permit id: Htg13-01837 | |||||
SCORE 96 Install (1) split system and ductwork. Date: April 3, 2013 Contractor: Regan Roberts Client: Rakesh Goyal | Permit type: Heating & cooling | Permit status: Issued | Expiration date: May 26, 2014 | Permit id: Htg13-01837 | |||||
SCORE 96 Addition of ductwork to existing ductwork Date: December 20, 2013 Contractor: Travis Lucas Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Heating & cooling | Permit status: Issued | Expiration date: December 10, 2014 | Permit id: Htg13-08322 | |||||
SCORE 96 Relocating toilet lavsand shwr in north bathrm. Adding toilet lavand shwr in south bathrm. Also adding Date: May 7, 2013 Contractor: Jerry Bratton Client: Rakesh Goyal | Permit type: Plumbing | Permit status: Issued | Expiration date: May 7, 2014 | Permit id: Plm13-00738 | |||||
SCORE 96 One studio pc-installation of plumbing- 5 fixtures stool lav two laundry tubs and water heater. Date: December 17, 2013 Contractor: R Bruce Mitchell Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Plumbing | Permit status: Issued | Expiration date: December 20, 2014 | Permit id: Plm13-02178 | |||||
SCORE 100 One studio pc-installation of plumbing- 5 fixtures stool lav two laundry tubs and water heater. Date: December 17, 2013 Contractor: Amanda Mitchell Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Plumbing | Permit status: Issued | Expiration date: December 20, 2014 | Permit id: Plm13-02178 | |||||
Parking lot at the corner of s meridian and jackson street - for st patricks day Date: February 4, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-00637 | |||||
Closure of georgia st between illinois st and meridian st for private allison transmission event wit Date: February 19, 2013 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Cancelled | Permit id: Row13-00961 | |||||
Use of curb lane and 2 meters to park truck to empty trash out of building on 3/7/13 & 3/8/13; emerg Date: March 6, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-01239 | |||||
Use of w curb ln sidewalk & 3 parking meters on s meridian st on 6/26/13 to unload drywall; emergenc Date: June 24, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-03501 | |||||
Use of sidewalk for tuck pointing on exterior of bldg from 8/26/13 thru 8/30/13; emergency contact: Date: August 19, 2013 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row13-04558 | |||||
16964 - 2 south meridian lot Date: August 29, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-04756 | |||||
Parking race cars/ blocking 5 meters 5470-5474 on 9/14 from 8am to to 9/15 8amergency contact morgan Date: September 3, 2013 Client: Janus Bldg Mgmt Llc | Permit type: Right of way | Permit status: Complete | Permit id: Row13-04815 | |||||
Blocking meters twio meters on s meridian st 7282 - 7283 on 10/ 7 from 7pm to 12 amindiana associati Date: October 7, 2013 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row13-05374 | |||||
17154 - block party tailgate pre-game over 21 / beer alcohol food an soft drinks serviced / dj music Date: November 7, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-05933 | |||||
7th floor / commercial remodel of space into multi-family dwelling / plans filed under str10-01903 / Date: February 19, 2013 Value: $20,000 Client: Rakesh Goyal | Permit type: Structural | Permit status: Issued | Expiration date: January 7, 2014 | Current use: Multi-family dwelling | Permit id: Str13-00478 | |||||
SCORE 89 1 tent st. Patricks day rally downtown / 54 sf / installed 3/16/13 8:30am removal 3/18/13 6am / e Date: March 6, 2013 Contractor: Kevin Schwab Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 16, 2013 | Expiration date: September 12, 2013 | Permit id: Str13-00691 | |||||
SCORE 89 1 tent st. Patricks day rally downtown / 54 sf / installed 3/16/13 8:30am removal 3/18/13 6am / e Date: March 6, 2013 Contractor: Jack Hawkin Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: March 16, 2013 | Expiration date: September 12, 2013 | Permit id: Str13-00691 | |||||
Installation of 2 temporary bars / rally on meridian / installed: 8/16/2013 / removed: 8/18/2013 / e Date: August 13, 2013 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Closed | Completion date: August 16, 2013 | Expiration date: February 12, 2014 | Permit id: Str13-03613 | |||||
SCORE 89 Morris/ one studio/ ste 301/ commercial remodel 2147 sf per plans/ cdr exempt/ class b/ const typ Client: One Studio Architects | Permit type: Structural | Permit status: Issued | Expiration date: August 9, 2014 | Current use: Office | Permit id: Str13-05354 | |||||
SCORE 89 Morris/ one studio/ ste 301/ commercial remodel 2147 sf per plans/ cdr exempt/ class b/ const typ Client: One Studio Architects | Permit type: Structural | Permit status: Issued | Expiration date: August 9, 2014 | Current use: Office | Permit id: Str13-05354 | |||||
1 tent 1 mobile bar / 1200sf tent 25 sf bar Date: December 4, 2013 Client: Palace At Union Station Inc | Permit type: Structural | Permit status: Issued | Expiration date: June 3, 2014 | Permit id: Str13-05498 | |||||
SCORE 96 Metes & bounds / fan coil unit replacement / i3u rc / center twp Date: May 21, 2014 Contractor: Greg Fuller Client: Robert Solberg | Permit type: Heating & cooling | Permit status: Issued | Expiration date: June 4, 2015 | Permit id: Htg14-02959 | |||||
SCORE 96 Installation of air handler and air conditioner in the elevator room Date: February 1, 2012 Contractor: Kristy Muse Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg12-00637 | |||||
SCORE 96 Installation of air handler and air conditioner in the elevator room Date: February 1, 2012 Contractor: Stanley Peterman Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Heating & cooling | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Htg12-00637 | |||||
SCORE 96 Remodel Date: August 2, 2010 Contractor: Jerry Bratton Client: Rakesh Goyal | Permit type: Plumbing | Permit status: Issued | Expiration date: June 8, 2011 | Permit id: Plm10-01170 | |||||
SCORE 69 Installing new driveway from parking lot to meridian takiing parking lot down to sidewalk level at Date: September 16, 2011 Contractor: Danny Maish Client: Palace At Union Station Inc | Permit type: Driveway | Permit status: Issued | Permit id: Drv11-00493 | |||||
Ihpc wholesale district parking lot improvements reconfiguration & new ticket booth 21465 sf Date: July 25, 2011 Client: Denison Parking | Permit type: Improvement location permit | Permit status: Issued | Expiration date: August 17, 2013 | Permit id: Ilp11-01253 | |||||
SCORE 98 Gratis permit dpw project #st-25-162: georgia st super bowl; utility excavation for steam for c Date: September 29, 2010 Contractor: Michael Thompson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row10-05814 | |||||
SCORE 96 Adding two new apartment units on an existing floor. New electrical wiring for the new units Date: September 28, 2011 Contractor: Mark Purcell Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03313 | |||||
SCORE 96 Electrical remodel of existing structure. Date: August 11, 2010 Contractor: Stephen Land Permit type: Electrical | Permit status: Issued | Expiration date: August 13, 2011 | Permit id: Ele10-02442 | |||||
SCORE 93 Change out exist disconnect to lockable and fuseable. Run conduit and circuits for elevator and pit. Date: February 22, 2012 Contractor: James Lozinak Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele12-00610 | |||||
Comm add within existing bldg footprint and existing bldg height 212. 5 sf on penthouse apt coa # Date: July 22, 2010 Client: Rakesh Goyal | Permit type: Improvement location permit | Permit status: Received | Permit id: Ilp10-01222 | |||||
SCORE 96 Electrical remodel of existing structure. Date: August 11, 2010 Contractor: Stephen Land Permit type: Electrical | Permit status: Issued | Expiration date: August 13, 2011 | Permit id: Ele10-02442 | |||||
SCORE 96 Install of hvac and ductwork Date: August 13, 2010 Contractor: Marc Coffman Client: Rakesh Goyal | Permit type: Heating & cooling | Permit status: Issued | Expiration date: June 6, 2011 | Permit id: Htg10-04569 | |||||
Installation of portable bar 2000sf for big championship no signs to be visible on structure i Date: November 27, 2012 Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Structural | Permit status: Closed | Completion date: December 10, 2012 | Expiration date: June 5, 2013 | Permit id: Str12-05894 | |||||
SCORE 96 Self certification Date: July 20, 2012 Contractor: Jerry Toller Client: Station Place Llc % Thrasher Realty Corporation | Permit status: Authorized | Permit id: 38756 | |||||
SCORE 93 Gratis permit dpw project #bk-25-022: brick paver repair downtown area s meridian st btwn georgi Date: May 14, 2012 Contractor: Lisa Miller Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02821 | |||||
SCORE 96 Metes and bounds / 1 new projecting wall sign (20. 5 sf) per plans / located on east elevation / the Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Issued | Expiration date: May 25, 2014 | Permit id: Sgn12-00455 | |||||
SCORE 93 St. Patricks day / rally on meridiantemporary tent 5400sfinstalled: 3/16/2012removed: 3/18/2012 Date: March 13, 2012 Contractor: Mike Wiggins Client: Indiana Bell Telephone Co Inc C O Sbc Communications Inc | Permit type: Structural | Permit status: Closed | Completion date: March 23, 2012 | Expiration date: September 11, 2012 | Permit id: Str12-00854 | |||||
SCORE 89 2 temporary tents 5400sft & 225sf installed: 9/22/2012 / removed: 9/22/2012 / emergecy contact: jes Date: September 17, 2012 Contractor: Jack Hawkin Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Structural | Permit status: Closed | Completion date: September 22, 2012 | Expiration date: March 21, 2013 | Permit id: Str12-04720 | |||||
SCORE 89 St. Patricks day / rally on meridiantemporary tent 5400sfinstalled: 3/16/2012removed: 3/18/2012 Date: March 13, 2012 Contractor: Jack Hawkin Client: Indiana Bell Telephone Co Inc C O Sbc Communications Inc | Permit type: Structural | Permit status: Closed | Completion date: March 23, 2012 | Expiration date: September 11, 2012 | Permit id: Str12-00854 | |||||
SCORE 97 Metes & bounds legal / 1 new wall sign on east elevation facing meridian street sf allowed (propo Permit type: Sign | Permit status: Issued | Expiration date: October 13, 2013 | Permit id: Sgn11-00904 | |||||
SCORE 89 2 temporary tents 5400sft & 225sf installed: 9/22/2012 / removed: 9/22/2012 / emergecy contact: jes Date: September 17, 2012 Contractor: Kevin Schwab Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Structural | Permit status: Closed | Completion date: September 22, 2012 | Expiration date: March 21, 2013 | Permit id: Str12-04720 | |||||
SCORE 96 Metes and bounds / 1 new projecting wall sign (20. 5 sf) per plans / located on east elevation / the Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Cancelled | Permit id: Sgn12-00372 | |||||
SCORE 96 Metes and bounds / 1 new projecting wall sign (20. 5 sf) per plans / located on east elevation / the Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Sign | Permit status: Issued | Expiration date: May 25, 2014 | Permit id: Sgn12-00455 | |||||
SCORE 86 Gratis permit dpw project #st-25-162: georgia st/super bowl; utility excavation for steam for c Date: September 29, 2010 Contractor: Kathleen Thompson Client: Station Place Llc % Thrasher Realty Corporation | Permit type: Right of way | Permit status: Issued | Permit id: Row10-05814 |