Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Conduit & manholes have been pre-installed by other contractors. Fmcc will be responsible for the installation of the street lights. (4) #16 cast iron poles, (3) twin- cast iron poles, (3) 28ft pendant post poles with fixtures. Also the installation of the associated foundations for each light pole. Date: October 10, 2013 Contractor: Fort Myer Construction Corporation Client: Wc Smith | Permit type: Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; streetlight(s) installation | Permit status: Permit expired | Expiration date: December 13, 2013 | Permit id: Pa87783 | |||||
SCORE 100 Conduit & manholes have been pre-installed by other contractors. Fmcc will be responsible for the installation of the street lights. (4) #16 cast iron poles, (3) twin- cast iron poles, (3) 28ft pendant post poles with fixtures. Also the installation of the associated foundations for each light pole. Date: December 23, 2013 Contractor: Fort Myer Construction Corporation Client: Wc Smith | Permit type: Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; streetlight(s) installation | Permit status: Permit expired | Expiration date: March 7, 2014 | Permit id: Pa87783-R1 | |||||
SCORE 100 Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: January 14, 2014 Contractor: Fort Myer Construction Corporation Permit status: 8 | Expiration date: March 7, 2014 | Permit id: Pa87783-R1 | |||||
SCORE 100 Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: October 24, 2013 Contractor: Fort Myer Construction Corporation Permit status: 8 | Expiration date: December 13, 2013 | Permit id: Pa87783 | |||||
SCORE 100 Conduit & manholes have been pre-installed by other contractors. Fmcc will be responsible for the installation of the street lights. (4) #16 cast iron poles, (3) twin- cast iron poles, (3) 28ft pendant post poles with fixtures. Also the installation of the associated foundations for each light pole. Date: October 24, 2013 Contractor: Fort Myer Construction Corp Permit status: Permit expired | Expiration date: December 13, 2013 | Permit id: Pa87783 | |||||
SCORE 100 Conduit & manholes have been pre-installed by other contractors. Fmcc will be responsible for the installation of the street lights. (4) #16 cast iron poles, (3) twin- cast iron poles, (3) 28ft pendant post poles with fixtures. Also the installation of the associated foundations for each light pole. Date: January 14, 2014 Contractor: Fort Myer Construction Corp Permit status: Permit expired | Expiration date: March 7, 2014 | Permit id: Pa87783-R1 | |||||
SCORE 95 Installing 3 of 4" plastic gas main in mst ne on main in roadway at 2 m st. Ne between 1st st. Ne and north capitol st. Ne, permit # 110859, wr # 816191, 4 x 5 over man. Attached sketch condition of permit. Ward# 6. "gas co must coordinate with wmata to re-locate bus stop which is in the work area before start of construction." Date: May 5, 2010 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench) | Permit status: Permit expired | Expiration date: July 14, 2010 | Permit id: Pa55314 |