Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington park lot #2 ![]() Permit status: Issued | Permit id: 13-01284 | |||||
SCORE 95 Wellington park lot #2 Client: Wellington Park Lot #2 | Permit type: Res: mfg. Home | Permit status: Expired | Current use: Residential | Permit id: 13-01284 | Parcel: 6077 | |||||
SCORE 100 Wellington park lot #2 Client: Wellington Park Lot #2 | Permit type: Res: mfg. Home | Permit status: Expired | Current use: Residential | Permit id: 13-01284 | Parcel: 6077 | |||||
March 5, 2013 9:19:04 am heatherr. Wellington mobile home set up lot #2 - move mobile home and set up in existing park; har location:airport rd to wellington estates; march 13, 2013 12:39:09 pm ssalyer. 12-5279 for conditional zoning permit need to have site approval before release this permit;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" inc Permit type: Res: mfg. Home | Permit status: Expired | Permit id: 13-01284 | Parcel: 6077 | |||||
Wellington park lot #2 ![]() ![]() Permit type: Residential | Permit status: Issued | Permit id: 13-01284 | |||||
March 5, 2013 9:19:04 am heatherr. Wellington mobile home set up lot #2 - move mobile home and set up in existing park; har location:airport rd to wellington estates; march 13, 2013 12:39:09 pm ssalyer. 12-5279 for conditional zoning permit need to have site approval before release this permit;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" inc ![]() Permit type: Res: mfg. Home | Permit status: Expired | Permit id: 13-01284 | Parcel: 6077 |