Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp used mh ![]() Permit status: Closed | Permit id: 12-02921 | |||||
SCORE 100 Wellington mhp used mh Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02921 | Parcel: 1890778 | |||||
SCORE 100 Wellington mhp used mh Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02921 | Parcel: 1890778 | |||||
SCORE 88 Wellington mhp used mh Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02921 | Parcel: 1890778 | |||||
May 24, 2012 11:35:39 am kneel. Wellington mhp - used mh with hp, master zoning approval 09-6160. Location: wellington mhp off airport rd.; june 5, 2012 1:14:06 pm heatherr. Premise #redacted phone number2; har; june 12, 2012 2:28:06 pm kneel. Wellington mhp - used mh with hp.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires se Permit type: Permits - historical | Permit status: Closed | Permit id: 12-02921 | Parcel: 1890778 | |||||
Wellington mhp used mh ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 12-02921 | |||||
May 24, 2012 11:35:39 am kneel. Wellington mhp - used mh with hp, master zoning approval 09-6160. Location: wellington mhp off airport rd.; june 5, 2012 1:14:06 pm heatherr. Premise #redacted phone number2; har; june 12, 2012 2:28:06 pm kneel. Wellington mhp - used mh with hp.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires se ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 12-02921 | Parcel: 1890778 |