Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 (dc 1027) install 5 of 2" pla main; replace 14 services, transfer 2 services, abandon 1 service, in the roadway and sidewalk of good hope rd se, u pl se, 19th pl se, u st se, 23rd st se, fort baker dr, naylor rd se, 669295 w 2735353 bca 131262 Date: April 6, 2016 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench), excavation; keyhole (utility co. Only) | Permit status: Revise and resubmit | Expiration date: July 14, 2016 | |||||
SCORE 95 Excavation; gas main line (trench), excavation; keyhole (utility co. Only) Contractor: Wash Gas And Light Co Permit status: 3 | Expiration date: July 14, 2016 | Permit id: 0 | |||||
SCORE 100 Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; repair water main line, excavation; valves (excavation) Contractor: Dcwater Cip Permit status: 10 | Expiration date: June 7, 2018 | Permit id: 0 | |||||
SCORE 100 Dc water will be performing replacement of existing water main and fire hydrant in the anacostia neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on good hope road s. E. Between fendall street s. E. And altamont place s. E., and 19th place s. E. Between u street s. E. And good hope road s. E. Date: March 31, 2017 Contractor: Dcwater Cip Permit type: Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; repair water main line, excavation; valves (excavation) | Permit status: Revise and resubmit | Expiration date: June 7, 2018 | Permit id: 0 | |||||
SCORE 82 Enp for ddot contractors Date: March 1, 2016 Contractor: Jean Baum Permit status: Expired | Expiration date: March 23, 2016 | Permit id: Pa10233000 | |||||
SCORE 100 Dc water will be performing replacement of existing water main and fire hydrant in the anacostia neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on good hope road s. E. Between fendall street s. E. And altamont place s. E., and 19th place s. E. Between u street s. E. And good hope road s. E. Contractor: Dcwater Cip Permit status: Revise and resubmit | Expiration date: June 7, 2018 | Permit id: 0 | |||||
SCORE 95 Excavation; gas main line (trench), excavation; keyhole (utility co. Only) Contractor: Wash Gas And Light Co Permit status: 3 | Expiration date: July 14, 2016 | Permit id: 0 | |||||
SCORE 100 Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; repair water main line, excavation; valves (excavation) Contractor: Dcwater Cip Permit status: 10 | Expiration date: June 7, 2018 | Permit id: 0 | |||||
SCORE 100 Dc water will be performing replacement of existing water main and fire hydrant in the anacostia neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on good hope road s. E. Between fendall street s. E. And altamont place s. E., and 19th place s. E. Between u street s. E. And good hope road s. E. Contractor: Dcwater Cip Permit status: Revise and resubmit | Expiration date: June 7, 2018 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: July 29, 2016 Contractor: Brittany Houston Permit status: Permit expired | Expiration date: October 12, 2016 | Permit id: Pa10327952 |