Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install and remove 1 pole on 1919 35th place, south of whitehaven parkway nw as indicated on the attached prints. Attched typical is acceptable, and must be always visible for ddot inspectors. Wr#3352612 (mdw) 1 calendar days Date: February 16, 2011 Contractor: Pepco Phi Holdings Inc Client: Pepco Phi Holdings, Inc | Permit type: Over head work; pole installation (single or first one) | Permit status: Permit expired | Expiration date: August 23, 2011 | Permit id: Pa60141 | |||||
Dccr proposes to drill one geotechnical boring (pra1gi-07) located in the alley to the east the listed property (1919 35th place nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional in Date: January 13, 2016 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: June 25, 2016 | Permit id: Pa121685 | |||||
SCORE 95 Over head work; pole installation (single or first one) Date: February 16, 2011 Contractor: Pepco Phi Holdings Inc Permit status: 8 | Expiration date: August 23, 2011 | Permit id: Pa60141 | |||||
SCORE 59 Moving truck Date: December 6, 2011 Contractor: Luke Diorio Permit status: Expired | Expiration date: December 10, 2011 | Permit id: Pa10045432 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pra1gi-07) located in the alley to the east the listed property (1919 35th place nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional in Date: January 13, 2016 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: June 25, 2016 | Permit id: Pa121685 | |||||
SCORE 99 Moving truck Date: July 10, 2013 Contractor: Patrick Smith Permit status: Permit expired | Expiration date: July 13, 2013 | Permit id: Pa10105136 | |||||
SCORE 99 Construction staging area Date: February 4, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: March 7, 2016 | Permit id: Pa10228762 | |||||
SCORE 56 Moving truck Date: July 9, 2017 Contractor: Florence Linko Permit status: Permit expired | Expiration date: July 19, 2017 | Permit id: Pa10431284 |