Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: October 11, 2016 Client: Morris Robert F | Permit status: Active | Permit id: 728367 | |||||
SCORE 89 Install drain & water lines from basement to 3-bathroom,1-kitchen,1-water heater & 1-laundry. The installation will comply with the philadelphia plumbing code 2004 Date: June 5, 2017 Contractor: Reliance Star Plumbing And Heat Client: Morris Zachary C Morris Jocelyn | Permit type: Plumbing permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 789044 | |||||
SCORE 100 Install lights, outlets, 25 switches and amp 2 volt central air with 9 smoke detectors as per nec 2008 Date: July 13, 2017 Contractor: Greg Terinoni Client: Morris Zachary C Morris Jocelyn | Permit type: Electrical permit | Permit status: Active | Completion date: July 13, 2017 | Permit id: 799482 | |||||
SCORE 100 Install new 1" water service from main to meter-pa1#20171980656-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 17, 2017 Contractor: William J Whartenby Inc Client: Morris Zachary C Morris Jocelyn | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 31, 2017 | Permit id: 800424 | |||||
SCORE 98 Interior demo of non load bearing partitions only. (sfd) Date: October 11, 2016 Contractor: Sinni Removal Services Llc Client: Morris Zachary C Morris Jocelyn | Permit type: Demolition permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 728367 | |||||
SCORE 87 For the erection of a third story addition with two (2) tier roof decks; one (1) roof deck over the second story, accessed from the third story rear; and one (1) roof deck over the third story, accessed from the exterior stair on the third floor rear (no roof deck access structure) in an existing single family household living, size and location as shown in the application plan, Date: April 3, 2017 Contractor: Burgese Builders And Design Inc Client: Morris Zachary C Morris Jocelyn | Permit type: Zoning permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 757532 | |||||
SCORE 87 For the interior exterior alterations and renovation with a third story addition and two (2) roof decks (no roof deck access structure) in an existing single family dwelling as per plans, Date: April 3, 2017 Contractor: Burgese Builders And Design Inc Client: Morris Zachary C Morris Jocelyn | Permit type: Addition permit | Permit status: Active | Completion date: September 22, 2017 | Permit id: 757533 | |||||
SCORE 100 Install (2) hvac systems with ductwork. (sfd) Date: June 1, 2017 Contractor: Talgar Inc Client: Morris Zachary C Morris Jocelyn | Permit type: Mechanical permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 788164 |