Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: micro inverters total system size in kilowatts: 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 26, 2011 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: September 7, 2011 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters micro inverters total system size in kilowatts 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 26, 2011 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 7, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 26, 2016 Contractor: Oak Island Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters micro inverters total system size in kilowatts 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 26, 2011 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 7, 2011 | Permit id: Pds2011-1031-20 | |||||
Final Date: September 7, 2011 Permit status: Pass | Permit id: Pds2011-1031-20 | |||||
Final Date: November 19, 2007 Permit status: Pass | Permit id: Pds2007-1005-20 |