Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 Supplement to outstanding permit school supp to #b000011 to incr scope of work. Work to incl: modify exstng pavd area to develop an entry courtyard to existg school(isadore newman) per plans Date: November 28, 2000 Contractor: Chris Poche Client: Newman School, Isidore | Permit id: B00006031 | |||||
SCORE 74 Alteration school alterations to existing school (isidore newman school) as per plans. Date: June 6, 2001 Contractor: John Labruzzo Client: Newman School, Isidore | Permit id: B01002411 | |||||
SCORE 60 Building renovations school to do landscaping & patio to existing school. Date: October 16, 2001 Contractor: John Labrusso Client: Newman School, Isidore | Permit id: B01004998 | |||||
SCORE 56 General repairs school repair existing canvas awning Date: November 6, 2001 Contractor: Johnny Labruza Client: Newman School, Isidore | Permit id: B01005252 | |||||
SCORE 74 New construction project school to erect prefabricated classroom build - ings as per plans.(needs zoning approval for off street parking) Date: November 26, 2001 Contractor: John Labruzzo Client: Newman School, Isidore | Permit id: B01005518 | |||||
SCORE 90 Building addition equal to 50% & over school construct walkway between existing building a and new constructed building b with minor interior reno to building a as per plans. Date: August 27, 2002 Contractor: Scott Fuller Client: Newman School, Isidore | Permit id: B02002106 | |||||
SCORE 90 Building demolition and debris removal vacant lot demolition to grade of existing building "stern " as per owners request. Inside of the hcdrc district. Apprvls are needed Date: May 8, 2002 Contractor: Scott Fuller Client: Newman School, Isidore | Permit id: B02002107 | |||||
SCORE 90 New construction project school new construction of a 2-story educational facilty. Building "c" as per plans and bza docket #167 01 Date: August 28, 2002 Contractor: Scott Fuller Client: Newman School, Isidore | Permit id: B02002109 | |||||
SCORE 90 New construction project school new construction of a two story educational facilty. Building "b" as per plans and bza docket#167 01 Date: August 28, 2002 Contractor: Scott Fuller Client: Newman School, Isidore | Permit id: B02002152 | |||||
SCORE 98 Electrical rewiring school thomas quinn Date: August 9, 2001 Contractor: Thomas Quinn Client: Newman School, Isidore | Permit id: E01006069 | |||||
SCORE 98 Circuits only school thomas quinn Date: January 25, 2002 Contractor: Thomas Quinn Client: Newman School, Isidore | Permit id: E02000550 | |||||
SCORE 89 Temporary construction trailer school w. Conner ellis address change from 1838 soniat st Date: July 30, 2002 Contractor: W. Conner Ellis Client: Newman School, Isidore | Permit id: E02005879 | |||||
SCORE 56 Building renovations school w. Conner ellis Date: September 5, 2002 Contractor: W. Conner Client: Newman School, Isidore | Permit id: E02006963 | |||||
Install mechanical equipment school repairs for elevator thyssen elevator 733-6141 Date: July 19, 2001 Client: Newman School, Isidore | Permit id: M01004592 | |||||
SCORE 86 Install mechanical equipment school install two 10-ton system with duct work. Edless verdin 415-6792 Date: July 27, 2001 Contractor: Eds Ac And Heating Client: Newman School, Isidore | Permit id: M01004791 | |||||
SCORE 86 Install operate passenger elevator office building install fire service tommy 734-0888 Date: February 20, 2003 Contractor: Schindler Client: Newman School, Isidore | Permit id: M03001264 | |||||
SCORE 89 Install mechanical equipment school install two 10-ton system with duct work. Edless verdin 415-6792 Date: July 27, 2001 Contractor: Eds A C And Heating Client: Newman School, Isidore | Permit id: M01004791 | |||||
SCORE 95 Install mechanical equipment school repairs for elevator thyssen elevator 733-6141 Date: July 19, 2001 Contractor: Thyssen Krupp Elevator Client: Newman School, Isidore | Permit id: M01004592 | |||||
SCORE 59 General repairs school walter barnes Date: April 3, 2003 Contractor: 2alter Barnes Client: Newman School, Isidore | Permit id: E03002537 | |||||
SCORE 82 Building renovations college w. Ellis conner isadore newman school Date: June 20, 2003 Contractor: W Conner Ellis Client: Newman School, Isidore | Permit id: E03004793 | |||||
SCORE 82 Install mechanical equipment school install 2-elec warm air furnace and two 4-ton split system. Thomas boudreaux - 833-8291 Date: August 19, 2002 Contractor: Mech.Const. Co Client: Isidore Newman, School | Permit id: M02005279 | |||||
SCORE 77 Install mechanical equipment school duct alterations- building -a thomas boudreaux - 833-8291 Date: August 8, 2003 Contractor: Mech. Conts. Co Client: Isidore Newman, School | Permit id: M03004964 | |||||
SCORE 89 Install mechanical equipment school install 6-elec warm air and unit heater. Thomas boudreaux 833-8291 building b see attach Date: August 8, 2003 Contractor: Mech. Const. Co Client: Isidore Newman, School | Permit id: M03004967 | |||||
SCORE 89 Install mechanical equipment school install 9-elec warm air furnace and 30-ton ahu system. Thomas boudreaux - 833-8291 see attached Date: August 8, 2003 Contractor: Mech. Const. Co Client: School, Isidore | Permit id: M03004968 | |||||
SCORE 86 Install mechanical equipment school install 9-elec warm air furnace and unit heater. Thomas boudreaux - 833-8291 see attached Date: August 8, 2003 Contractor: Mech. Constr. Co Client: Isidore Newman, School | Permit id: M03004975 | |||||
SCORE 89 Install mechanical equipment school install 7-elec warm air furnace and 12-ton ahu system. Thomas boudreaux- 833-8291 see attached Date: August 8, 2003 Contractor: Mech. Const. Co Client: Isidore Newman, School | Permit id: M03004976 |