Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: March 23, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 678052 | |||||
Alteration permit Date: January 20, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 664581 | |||||
Mechanical permit Date: February 8, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 668429 | |||||
Plumbing permit Date: February 23, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 671590 | |||||
Alteration permit Date: May 11, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 677757 | |||||
Plumbing permit Date: February 23, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 671590 | |||||
Electrical permit Date: March 23, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 678052 | |||||
Mechanical permit Date: February 8, 2016 Client: Ssj Group Llc | Permit status: Completed | Permit id: 668429 | |||||
SCORE 93 Permit to install three star bolts at front facade, second floor level, as shown on plans. Date: May 11, 2016 Contractor: Aaron Weiner Construction Inc Client: Poku-Boateng Adwoa | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 677757 | |||||
SCORE 100 Complete re-wire, existing service: 15- circuits, 120v interconnected smoke detectors... Work in accordance with 2008 nec for a one family building Date: March 23, 2016 Contractor: Barry J Yeslow Inc Client: Poku-Boateng Adwoa | Permit type: Electrical permit | Permit status: Completed | Completion date: June 24, 2016 | Permit id: 678052 | |||||
SCORE 93 Demo interior non bearing walls, install new bathroom and new kitchen, re-drywall house. Ez permit standard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: January 20, 2016 Contractor: Aaron Weiner Construction Inc Client: Poku-Boateng Adwoa | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 664581 | |||||
SCORE 100 Install (1) hvac system with ductwork. (sfd) Date: February 8, 2016 Contractor: Above And Below Heating And Air Client: Poku-Boateng Adwoa | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 668429 | |||||
SCORE 93 1-water closet, 1-lav, 1-tub, 1-kitchen sink, 1 garbage disposal, a ac condencate line & 1-washing machine & electric water heater the installation will comply with the philadelphia plumbing code 2004 Date: February 23, 2016 Contractor: Aaron Weiner Construction Inc Client: Poku-Boateng Adwoa | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 671590 | |||||
SCORE 93 Remove and replace steps from 1st to 2nd floor and basement steps.(rise and run according to irc standards) Date: March 14, 2016 Contractor: Aaron Weiner Construction Inc Client: Poku-Boateng Adwoa | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 676017 | |||||
SCORE 93 Remove and replace staircase reinforce rear addition Date: March 21, 2016 Contractor: Aaron Weiner Construction Inc Client: Poku-Boateng Adwoa | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2016 | Permit id: 677756 |