Use permit Date: January 13, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 196396 | |||||
Demolition permit Date: April 8, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 529290 | |||||
Mechanical permit Date: June 21, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 84720 | |||||
Plumbing permit Date: October 27, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 244730 | |||||
Plumbing permit Date: April 25, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 532665 | |||||
Mechanical permit Date: April 1, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 142381 | |||||
Alteration permit Date: March 2, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 391070 | |||||
Demolition permit Date: November 10, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 232338 | |||||
Alteration permit Date: December 23, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 496887 | |||||
Electrical permit Date: January 31, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 444569 | |||||
Plumbing permit Date: June 22, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 84982 | |||||
Electrical permit Date: December 16, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 377327 | |||||
Demolition permit Date: February 23, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 325307 | |||||
Sign permit Date: September 30, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 686179 | |||||
Mechanical permit Date: August 22, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 418352 | |||||
Electrical permit Date: July 5, 2007 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 87532 | |||||
Electrical permit Date: May 30, 2014 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 539897 | |||||
Electrical permit Date: January 28, 2008 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 128808 | |||||
Plumbing permit Date: July 3, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 414444 | |||||
Electrical permit Date: November 23, 2009 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 249324 | |||||
Plumbing permit Date: January 20, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 664644 | |||||
Alteration permit Date: November 26, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 574975 | |||||
Mechanical permit Date: December 30, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 381197 | |||||
Alteration permit Date: July 25, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 702351 | |||||
Electrical permit Date: March 23, 2016 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 678682 | |||||
Alteration permit Date: October 21, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 243691 | |||||
Suppression permit Date: May 17, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 440562 | |||||
Alteration permit Date: April 1, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 326539 | |||||
Alteration permit Date: September 17, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 639341 | |||||
Alteration permit Date: February 5, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 54593 | |||||
Electrical permit Date: October 29, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 309040 | |||||
Suppression permit Date: September 2, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 559169 | |||||
Plumbing permit Date: December 13, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 511067 | |||||
Alteration permit Date: December 11, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 188481 | |||||
Mechanical permit Date: April 17, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 589779 | |||||
Suppression permit Date: November 29, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 440441 | |||||
Plumbing permit Date: March 7, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 328194 | |||||
Suppression permit Date: January 10, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 320073 | |||||
Electrical permit Date: August 30, 2012 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 424869 | |||||
Suppression permit Date: January 16, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 32992 | |||||
Mechanical permit Date: September 29, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 725632 | |||||
Zoning/use permit Date: July 25, 2016 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 672989 | |||||
Mechanical permit Date: December 17, 2013 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 511145 | |||||
Administrative permit Date: March 30, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 594803 | |||||
Demolition permit Date: October 2, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 498163 | |||||
Demolition permit Date: February 6, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 130984 | |||||
Plumbing permit Date: April 2, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 142604 | |||||
Alteration permit Date: December 16, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 310014 | |||||
Demolition permit Date: April 15, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 684558 | |||||
Electrical permit Date: November 5, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 650289 | |||||
Plumbing permit Date: November 6, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 650538 | |||||
Fast form building permit Date: February 20, 2008 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 130762 | |||||
Plumbing permit Date: October 28, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 308782 | |||||
Electrical permit Date: September 11, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 418797 | |||||
Plumbing permit Date: February 7, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 518760 | |||||
Mechanical permit Date: June 21, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 84720 | |||||
Fast form building permit Date: February 20, 2008 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 130762 | |||||
Sign permit Date: September 30, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 686179 | |||||
Alteration permit Date: November 21, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 505739 | |||||
Alteration permit Date: July 25, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 702351 | |||||
Alteration permit Date: May 11, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 62467 | |||||
Mechanical permit Date: December 17, 2013 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 511145 | |||||
Alteration permit Date: June 8, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 401121 | |||||
Demolition permit Date: January 25, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 322173 | |||||
Electrical permit Date: October 7, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 566506 | |||||
Mechanical permit Date: March 17, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 330329 | |||||
Plumbing permit Date: December 5, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 377070 | |||||
Suppression permit Date: July 5, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 414768 | |||||
Plumbing permit Date: October 27, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 244730 | |||||
Demolition permit Date: April 15, 2016 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 684558 | |||||
Electrical permit Date: November 26, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 505839 | |||||
Electrical permit Date: January 24, 2011 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 322097 | |||||
Mechanical permit Date: April 17, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 589779 | |||||
Alteration permit Date: December 29, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 194207 | |||||
Plumbing permit Date: April 2, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 142604 | |||||
Alteration permit Date: December 29, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 379313 | |||||
Electrical permit Date: November 23, 2009 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 249324 | |||||
Alteration permit Date: November 25, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 576307 | |||||
Plumbing permit Date: March 2, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 59434 | |||||
Plumbing permit Date: October 28, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 308782 | |||||
Administrative permit Date: March 30, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 594803 | |||||
Use permit Date: January 13, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 196396 | |||||
Electrical permit Date: January 11, 2017 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 749224 | |||||
Electrical permit Date: August 22, 2008 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 158087 | |||||
Demolition permit Date: April 8, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 529290 | |||||
Plumbing permit Date: November 23, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 738930 | |||||
Demolition permit Date: February 6, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 130984 | |||||
Plumbing permit Date: December 13, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 511067 | |||||
Suppression permit Date: May 17, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 440562 | |||||
Plumbing permit Date: January 18, 2017 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 752629 | |||||
Plumbing permit Date: August 23, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 423833 | |||||
Alteration permit Date: October 23, 2015 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 630487 | |||||
Mechanical permit Date: September 29, 2016 Client: Rittenhouse Plaza Inc | Permit status: Active | Permit id: 725632 | |||||
Alteration permit Date: November 12, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 242925 | |||||
Electrical permit Date: March 16, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 62646 | |||||
Mechanical permit Date: August 22, 2012 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 418352 | |||||
Electrical permit Date: October 29, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 309040 | |||||
Demolition permit Date: November 10, 2009 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 232338 | |||||
Plumbing permit Date: November 6, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 650538 | |||||
Zoning use permit Date: July 25, 2016 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 672989 | |||||
Suppression permit Date: January 16, 2007 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 32992 | |||||
Suppression permit Date: January 10, 2011 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 320073 | |||||
Demolition permit Date: October 2, 2013 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 498163 | |||||
Electrical permit Date: March 23, 2016 Client: Rittenhouse Plaza Inc | Permit status: Expired | Permit id: 678682 | |||||
Electrical permit Date: November 5, 2015 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 650289 | |||||
Alteration permit Date: December 16, 2010 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 310014 | |||||
Mechanical permit Date: April 1, 2008 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 142381 | |||||
Suppression permit Date: September 2, 2014 Client: Rittenhouse Plaza Inc | Permit status: Completed | Permit id: 559169 | |||||
SCORE 100 Interior demolition of existing finishes and non structural partitions as per attached demolition Date: September 15, 2014 Contractor: Shay Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 561101 | |||||
SCORE 65 Level i alterations work to include: bathroom demo existing tile and sheetrock walls. Install new sheetrock and tile replace 28 doors (applicant agrees to ez standard for limited commercial alterations). Date: September 22, 2014 Contractor: Gf Remodeling Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Expired | Completion date: July 31, 2015 | Permit id: 563152 | |||||
SCORE 100 To amend ap #553603 to state: relocate replace light fixtures... In accordance with 2008 nec Date: September 2, 2014 Contractor: Kevin Ford Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: September 2, 2014 | Permit id: 558655 | |||||
SCORE 100 Relocating heads to fit new wall ceiling layout-coffee shop. No work changes to exterior or windows doors as per historical commission. Date: September 2, 2014 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: September 15, 2014 | Permit id: 559169 | |||||
SCORE 100 Relocate 3 horn strobes per 2008 nec & nfpa 72(mixed use) Date: September 15, 2014 Contractor: Kevin Ford Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: September 16, 2014 | Permit id: 561736 | |||||
SCORE 95 Replacement of 2 water closets, 2 lavy sinks, 1 tub and 1 shower with no additional piping Date: October 8, 2014 Contractor: Robert Mickles Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 20, 2015 | Permit id: 566322 | |||||
SCORE 100 Existing service to remain as is,demo existing power and lighting and wire power and lighting per 2008 nec (high rise) Date: October 7, 2014 Contractor: Integrations Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: September 3, 2015 | Permit id: 566506 | |||||
SCORE 100 Replace existing luminares, switches, receptacles... In accordance with 2008 nec Date: September 23, 2014 Contractor: Barry J Yeslow Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 29, 2015 | Permit id: 563284 | |||||
SCORE 100 Install 2 phone lines & 1 gfci receptacle. Date: September 26, 2014 Contractor: Rnv Electric Contractors Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 19, 2014 | Permit id: 564488 | |||||
SCORE 100 For interior alterations to include the installation of new partition walls, and new floor wall finishing. (iebc 2009, compliance path: work-area method, lvl ii alterations.) separate permits required for plumbing and electrical alterations. No work or alterations to exterior. Date: November 26, 2014 Contractor: Shay Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 23, 2015 | Permit id: 574975 | |||||
SCORE 96 5 lights, 3 outlets, 3 switches, 1 coax cable line, and minor electric demo of walls being removed in accordance with 2008 nec(apt complex with various commercial uses)(cc dist) Date: August 30, 2012 Contractor: B And F Electrical Contractors Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: August 30, 2012 | Permit id: 424869 | |||||
SCORE 78 For the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: September 29, 2016 Contractor: A.J. Appliance Inc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 11, 2017 | Permit id: 725632 | |||||
SCORE 100 Replace 12 switches, 27 outlets, 5 gfis and 12 lights onto existing 150amp panel as per 2008 nec (cc district) Date: March 23, 2016 Contractor: Kosmatos Mechanical Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: March 23, 2016 | Permit id: 678682 | |||||
SCORE 89 Selective demolition of interior non-oload bearing partition walls. Removal of doors, hardwood floors and selective demolition of gwb ceilings and ceramic tiles from baths. See attached drawings. Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 15, 2016 Contractor: R J Deluca And Son Llc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: January 23, 2017 | Permit id: 684558 | |||||
SCORE 86 Kitchen sink waste line and water supply piping Date: September 6, 2017 Contractor: Arthur Abraham Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 6, 2017 | Permit id: 813909 | |||||
SCORE 100 Replace three existing lennox a c unit and three hi velocity blower units with 3 new lennox a c units one 3 1 2 ton unit and one 2 1 2 unit and one 2 ton with unico units ,one 3 1 2 ton blower unit and two unnico, 2 1 2 ton blower units and all new duct work Date: October 4, 2016 Contractor: Condino Andrew Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Expired | Completion date: October 3, 2017 | Permit id: 726690 | |||||
SCORE 100 For interior alterations to include the installation of new partition walls, repair of ceiling slab, steel support angle installation, and new floor wall finishing. (iebc 2009, compliance path: work-area method, lvl ii alterations.) separate permits required for plumbing and electrical alterations. No work or alterations to exterior. Date: July 25, 2016 Contractor: Hanson General Contracting Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 702351 | |||||
SCORE 100 Master bedroom - water closet, shower, and lavatory; hall bath - water closet, lavatory and bathtub; powder room - water closet and lavatory; kitchen - sink and dishwasher; laundry - washing machine Date: December 5, 2011 Contractor: Adelphia Plumbing And Htng Corp Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 30, 2012 | Permit id: 377070 | |||||
SCORE 100 Moving outlets in kitchen per 2008 nec (apt bldg) Date: April 21, 2014 Contractor: Rnv Electric Contractors Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 19, 2014 | Permit id: 531461 | |||||
SCORE 100 Masonry wall refurbishment and selective repairs masonry wall per engineers plan as approved by phila. Historical commission. Date: January 14, 2013 Contractor: Dugan, Joseph Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 26, 2015 | Permit id: 432609 | |||||
Interior renovations, tile painting, no change to exterior no structural work. No change to number of units in building. Date: May 15, 2013 Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 10, 2013 | Permit id: 463517 | |||||
SCORE 100 For the erection of a shelter platform to serve as pedestrian protection for exterior alterations being performed under permit #463517. Date: June 27, 2013 Contractor: Superior Scaffold Services Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2014 | Permit id: 469937 | |||||
SCORE 96 New lighting & recepts ,appliances,equiptment,200a feeder wiring throughout condo as per 2008 nec (condo) Date: August 15, 2013 Contractor: Pittaoulis Electric Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: August 15, 2013 | Permit id: 480475 | |||||
SCORE 95 For the installation of two (2) warm-air appliances (capacity for each < 20 cfm), associated ductwork, and supply return grilles to be self-contained within a single dwelling unit. No penetrations through fire-rated assemblies, and no alterations to exterior facade. Date: April 17, 2015 Contractor: Amerigas Propane Lp Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 29, 2015 | Permit id: 589779 | |||||
SCORE 100 Sidewalk shelter platform shed scaffold Date: November 25, 2014 Contractor: Superior Scaffold Services Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 28, 2015 | Permit id: 576307 | |||||
SCORE 100 Unit 11-a interior plumbing alterations - install (3)water closets, (4)lavatories, (2)kitchen sinks, a bathtub, a shower, a laundry tub, a clothes washing machine standpipe, an indirect waste to replace existing bathrooms and kitchen - connect to existing utilities Date: January 7, 2015 Contractor: Adelphia Plumbing And Htng Corp Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 29, 2015 | Permit id: 582759 | |||||
SCORE 91 For amendment of building permit# 554053, issued for interior alterations to exist. Cafe space, to retain existing front facade at walnut st; no new exterior door opening to be created. Date: March 30, 2015 Contractor: Commercial Construction Mgt Client: Rittenhouse Plaza Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: May 28, 2015 | Permit id: 594803 | |||||
SCORE 87 Install 22 recessed lts, 8 sws, 5 new amp gfi crt in kitchen. All wiring in m. C. Cable. (cc dist) Date: March 16, 2007 Contractor: Fred Dinardo Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: July 2, 2008 | Permit id: 62646 | |||||
SCORE 78 For level ii alterations to an existing residential unit, alterations to include the removal installation of partition walls and to provide furnishing and finishes throughout. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permtis required for all other work. Date: October 23, 2015 Contractor: Decus Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Expired | Completion date: August 2, 2017 | Permit id: 630487 | |||||
SCORE 73 Level i minor alterations; work to include: kitchen and bath re-model, flooring, drywall, paint, trim, interior doors Date: September 17, 2015 Contractor: Hdi Associates Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 27, 2016 | Permit id: 639341 | |||||
SCORE 89 Fixtures only with brief adjustments to the water and the drain line to accomodate the new fixtures. (wc, lav, ks, tub) Date: March 2, 2007 Contractor: Ra Lavin Plumbing And Heating Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 26, 2007 | Permit id: 59434 | |||||
SCORE 100 Change existing 125 amp service feed with new 2 amp service and install new meter enclosure aand disconnect for unit - feed going to existing 2 amp panel Date: December 16, 2011 Contractor: Costa Electric Llc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 31, 2012 | Permit id: 377327 | |||||
SCORE 99 Condos-installing 35 new outlets ,6 switches in 30% of apt unit 14c also replace all old outlets and switches. Relocate 200amp panel. Replace and install all new lights (20) as per 2008 nec (cc district) Date: February 2, 2012 Contractor: Schreiner David A Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 31, 2012 | Permit id: 379300 | |||||
SCORE 83 Interior renovations to condo unit. Separate electrical permit required. Date: December 29, 2011 Contractor: J And L Designs Unlimited Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 30, 2012 | Permit id: 379313 | |||||
SCORE 61 Supply and install 3 ton heat pump system with auxiliary heat Date: December 30, 2011 Contractor: John A Cella Inc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 30, 2012 | Permit id: 381197 | |||||
SCORE 59 Interior alterations - single family(condo) dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations. No demolition or change to fire rated assembilies. Call inspector 24hr prior to starting work. Separate permits required for plumbing, electric and hvac. No Date: March 2, 2012 Contractor: Masterpiece Contractors Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 23, 2013 | Permit id: 391070 | |||||
SCORE 98 Mixed use-new bathrooms and kitchen;new laundry-powder room Date: March 22, 2012 Contractor: John Devine Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 28, 2012 | Permit id: 395040 | |||||
SCORE 100 Renovation of areas of the existing basement and corridor outside residential units on floor 18 west. Asbestos removal required prior to the start of construction. Date: June 8, 2012 Contractor: Intech Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 11, 2012 | Permit id: 401121 | |||||
SCORE 56 Fixture installation Date: October 27, 2009 Contractor: Vincent Mallace Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 19, 2010 | Permit id: 244730 | |||||
SCORE 100 Demoliton of existing electrical distrib new substation new electrical distribution ltg fixt electrical receptacles emergency generator ats connect existing electrical equipment misc per 2008 nec code(central dis) Date: November 15, 2010 Contractor: Anmar Electrical Contractor In Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: June 16, 2011 | Permit id: 302872 | |||||
SCORE 100 Relocate and install new fixtures & receptacles unit 18e only, as per 2005 nec (cc district) Date: December 11, 2009 Contractor: Cahill Controls Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 10, 2010 | Permit id: 252900 | |||||
For the retail sale of clothing in space 1905 walnut st. (first floor) as part of an existing structure with 117 dwellings and uses as previously approved. No signs this permit. Date: January 13, 2009 Client: Rittenhouse Plaza Inc | Permit type: Use permit | Permit status: Completed | Completion date: August 8, 2014 | Permit id: 196396 | |||||
SCORE 56 Interior alterations at partial apt. 14b as per plans. Date: April 21, 2009 Contractor: Kyle Broeker Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 22, 2009 | Permit id: 208333 | |||||
SCORE 100 Replace existing lighting in office, bedroom and bathrooms. Replace existing devices with new. Install (6) new light fixtures... In accordance with 2005 nec Date: January 14, 2009 Contractor: A T B Electric Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: January 14, 2009 | Permit id: 196293 | |||||
SCORE 77 For interior alterations to existing unit within an existing high rise building to include demolition and reconstruction of non-load bearing walls, and interior finishes, as per approved plans. No change in occupancy Date: October 4, 2016 Contractor: Phillip Johnson Construction C Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 724557 | |||||
For prescriptive alterations within unit 10d in an existing high-rise residential structure as per plans; separate permits required for any and all mechanical, electrical, and plumbing work; building is currently not sprinklered. Date: February 3, 2017 Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 746798 | |||||
SCORE 61 Interior alterations. Install new bathroom,new drywall,new hardwood floor new ceramic tile floors in bathrooms. Date: February 5, 2007 Contractor: Cro Construction Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 2, 2008 | Permit id: 54593 | |||||
SCORE 100 Relocate and or replace 7- pieces of coffee equipment, replacement only- 30- light fixtures... In accordance with 2008 nec Date: August 20, 2014 Contractor: Kevin Ford Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2014 | Permit id: 553603 | |||||
SCORE 100 Replace all recepts, switches and lighting fixtures, no additianl wiring, no change in load as per 2005 nec (cc district) Date: July 5, 2007 Contractor: Santo Mitchel Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: July 5, 2007 | Permit id: 87532 | |||||
SCORE 100 Relocate 19 sprinkler heads on the first floor, space 12. Date: November 29, 2012 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: June 17, 2013 | Permit id: 440441 | |||||
SCORE 100 Install new sanitary and water lines from existing services to new wc, 2 lavs and 1 ks(mixed use) Date: October 19, 2012 Contractor: Bbj Mechanical Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 7, 2015 | Permit id: 433650 | |||||
SCORE 100 Removal of existing kitchen and bathrooms carpets, shelving, floor finishes, and 1 non load bearing wall. Date: April 8, 2014 Contractor: Horstmann Lynch Cons Svcs Llc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: August 4, 2014 | Permit id: 529290 | |||||
SCORE 100 For the extension of an existing sprinkler system with an existing back flow preventer, new layout to include sprinkler heads in hallways from 2nd thru 21st floor of an existing building. All work to be done per approved plans. Fire supression system in accordance with nfpa 13. Date: May 17, 2013 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: January 2, 2014 | Permit id: 440562 | |||||
SCORE 100 New recpts & lighting in 1st floor & corridors new 225 amp 120 208 volt panel on 1st floor as per nec 2008 (c0mm) Date: January 31, 2013 Contractor: Charles H Macdonald Electric I Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 8, 2013 | Permit id: 444569 | |||||
SCORE 61 For demolition of exist. Hvac ductwork & associated equipment & for the installation of two (2) air conditioning (ac) units, two (2) ext. Condensing units (cus), (15) terminal grilles registers diffusors (grds), & all associate suppy, exhaut, & return ductwork within an exist. High-rise residential building. Date: May 15, 2013 Contractor: Hays Sheet Metal Inc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 31, 2014 | Permit id: 459722 | |||||
SCORE 100 5-floor sinks, 2-hand sinks, 1-3 comp sink, indirect waste piping and water supply piping (mixed use) - note: all water supplied equipment will be protected against backflow - work will comply with the approved plans and the philadelphia plumbing code 2004 Date: September 17, 2014 Contractor: Joseph Rosati Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 29, 2014 | Permit id: 556311 | |||||
SCORE 96 Replace kitchen circuits run new circuits for kitchen appliances lights and gfci replace old 60amp circuit panel with new reconnect existing circuits 13 lights 3 gfci receptalces receptacles 4 switches Date: October 31, 2017 Contractor: Pittaoulis Electric Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Active | Completion date: October 31, 2017 | Permit id: 817605 | |||||
SCORE 100 Replace water drain lines too 11 fixtures(1 washer,5 lavs,4 toilets,1 tub)multi family the installation will comply with the philadelphia plumbing code 2004 Date: November 20, 2017 Contractor: Best Choice Plumbing Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Active | Completion date: November 20, 2017 | Permit id: 833191 | |||||
Hvac steam coil in unit 12f Date: June 21, 2007 Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 29, 2009 | Permit id: 84720 | |||||
SCORE 98 Remove old galvanized drain lines for tubs and sinks (4). Supply and install piping 1 1 2" (dwv) for (2) stall showers with cast iron strainers with pans. Install piping for (4) sinks (dwv) 1 1 2". Install 1 2" (l) copper for fxts. Set fxts (3) wc. (2 1 2 baths: 3 wc, 3 lavs, 2 sh) 1 ks, Date: June 22, 2007 Contractor: William Davis Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 18, 2007 | Permit id: 84982 | |||||
SCORE 100 Rewire kitchen 4-120volt circuts & 8 recpetalces all gfci replace 15 recessed light cans w smaller cans. Bedroom 6 recessed lights & 5 new 1 volt receptacles. Rewire bathroom new 1 volt dedicated gfci receptacles,2 sws & 2 lights per 2008 nec (apt bldg) Date: May 30, 2014 Contractor: Greg Terinoni Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: May 30, 2014 | Permit id: 539897 | |||||
SCORE 100 Redo kitchen area 1-kitchen sink (multi units) Date: April 25, 2014 Contractor: Shegda Construction Corp Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 23, 2014 | Permit id: 532665 | |||||
SCORE 100 Level 1 alteration: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose. Demo non bearing walls, install new closet, remodel kitchen Date: May 2, 2014 Contractor: Masa Construction Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 20, 2015 | Permit id: 533847 | |||||
SCORE 100 Replace drain and supply lines for 3 piece bathroom w c,lav,shower,kitchen sink,wm and 4 piece bathroom w c 2 lavs and shower (condo unit) Date: May 8, 2014 Contractor: William Gruber Jr Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2014 | Permit id: 535415 | |||||
SCORE 100 Add sounder base programming to existing fire alarm system. Date: June 19, 2014 Contractor: Charles H Macdonald Electric I Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 9, 2016 | Permit id: 537550 | |||||
SCORE 100 Renovation of kitchen and replace old light fixtures as per 2008 nec Date: January 24, 2011 Contractor: Santo Mitchel Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: January 24, 2011 | Permit id: 322097 | |||||
SCORE 62 Remodel existing kitchen within condo unit #6a. Date: October 21, 2009 Contractor: Fedor Fabrication Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 6, 2010 | Permit id: 243691 | |||||
SCORE 59 Interior demo of non load bearing walls, removal of kitchen and remove bathroom Date: November 10, 2009 Contractor: B And D Const Univ Paint Paper Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: November 10, 2009 | Permit id: 232338 | |||||
SCORE 99 Remove through the wall air conditioning unit. New store to repalce damaged or missing stone, new face brick to replace damaged or missing facbrick, new brick to replace missing back-up brick and clay tile Date: September 3, 2009 Contractor: Knapp Masonry Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 10, 2009 | Permit id: 235380 | |||||
SCORE 59 Demo kitchen and baths to rebuild as per drawings. Date: November 12, 2009 Contractor: B And D Const Univ Paint Paper Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 6, 2010 | Permit id: 242925 | |||||
SCORE 89 Rehabing the bathroom, install plumbing fixtures with limited piping Date: May 14, 2009 Contractor: Ra Lavin Plumbing And Heating Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 28, 2011 | Permit id: 215728 | |||||
SCORE 100 Replace all receptacles,switches and lights fixtures with no change in load as per 2008 nec Date: October 29, 2010 Contractor: Fred Dinardo Jr Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2011 | Permit id: 309040 | |||||
SCORE 89 Install ten fixtures Date: October 28, 2010 Contractor: Ra Lavin Plumbing And Heating Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 12, 2010 | Permit id: 308782 | |||||
SCORE 100 Install new (2) high velocity a c systems with all flex and supplies. Split system to be located on roof for condo unit per plan. Date: January 11, 2011 Contractor: Daniel Mellon Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 311960 | |||||
SCORE 82 For the relocation of steam condensate, the installation of ac for elevator machine rooms, exhaust ducts for generator room and for the installation of mechanical equipment as per plans. Date: January 28, 2011 Contractor: Thomas Babcock Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 8, 2011 | Permit id: 314478 | |||||
SCORE 100 Demo of sub basement wall to allow access for installation of equip. Rebuild of wall after equip is installed. Drywall enclosure of new generator in sub basement per plan. Date: December 16, 2010 Contractor: Intech Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 8, 2011 | Permit id: 310014 | |||||
SCORE 100 Condos-removing tub & installing a stall shower and relocating a vanity Date: November 1, 2011 Contractor: Thomas Quagliarello Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 28, 2015 | Permit id: 371635 | |||||
SCORE 100 Install 15 hi hat fixtures, wall outlets,replace 100amp panel and breakers and 4 gfci outlets (apt unit)cc district Date: November 5, 2015 Contractor: Christopher Richard Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 1, 2016 | Permit id: 650289 | |||||
SCORE 91 For int. Demolition & prescriptive alterations at exist. One (1) story coffee shop tenant space within a high-rise mixed-use multi-family building to include creation of ext. Doorway, accessibility upgrades, & installation of new finishes throughout the space; work area is fully sprinklered. Separate permit required for electrical & plumbing work. Date: August 13, 2014 Contractor: Commercial Construction Mgt Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 554053 | |||||
SCORE 86 Fixture replacement in 4. 5 bathrooms(apt bldg)the installation will comply with the philadelphia plumbing code 2004 Date: November 23, 2016 Contractor: Arthur Abraham Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 738930 | |||||
Exploratory demolition of dismantling ezxisting stone archway & assess the condition of stone & steel as per plans Date: October 10, 2007 Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 29, 2009 | Permit id: 95215 | |||||
SCORE 82 Cabling for 8 new phones, cabling for new speakers, cabling for 2 televisions. No electrical work. Total lengh (cc dist) Date: August 1, 2007 Contractor: Robert Kelleher Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 28, 2008 | Permit id: 93356 | |||||
SCORE 89 Ez permit ductwork & warm-air appliances (roof top unit with like in kind on exiting curb)- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Not visable from the public right away as per historic approval. Date: March 20, 2017 Contractor: Mcorp Llc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 28, 2017 | Permit id: 767753 | |||||
SCORE 68 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: March 27, 2017 Contractor: Tadeusz Samelko Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 769839 | |||||
SCORE 89 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 21, 2017 Contractor: R J Deluca And Son Llc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 777076 | |||||
SCORE 68 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 12, 2017 Contractor: Tadeusz Samelko Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 783465 | |||||
SCORE 100 Replace liner for shower strainer, replace toilet, replace pedestal sink Date: May 22, 2017 Contractor: Robert Metzger Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Active | Completion date: June 13, 2017 | Permit id: 785408 | |||||
SCORE 93 Plumbing alterations throughout an existing single family dwelling. Shower vanity sinks and toilets installation of washer box for laundry room Date: January 13, 2017 Contractor: Rj Zuko Plumbing Llc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 749941 | |||||
SCORE 86 Installation of two 3pc bathroom groups and a washing machine. Date: January 18, 2017 Contractor: Arthur Abraham Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 752629 | |||||
SCORE 96 Rewire existing bathroom & utility closet,change fixtures using existing circuits and branch off with some new mc wiring to new devices. Move and rewire chandelier in hallway. Replace devices with new,remove some fixtures and outlets in ceiling and install new recessed lights in office and bathroom (multi family) Date: February 10, 2017 Contractor: Pittaoulis Electric Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: July 12, 2017 | Permit id: 758258 | |||||
SCORE 96 Rewire apartment 16a & 17a (same unit) excluding kitchen - switches, recepts, lights, hvac units, condensors, installing new 125 and 1 amp main circuit breaker panels as per 2008 nec (cc district) Date: January 20, 2017 Contractor: Pittaoulis Electric Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Abandoned | Completion date: September 19, 2017 | Permit id: 739969 | |||||
SCORE 99 Renovate master bedroom and bathroom. Upgrade power and lighting using existing service equipment and branch circuits (multi family) Date: January 11, 2017 Contractor: James Campbell Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: January 11, 2017 | Permit id: 749224 | |||||
SCORE 100 To legalize four (4) awning signs and replacement of five (5) flatwall signs, as per approved plans. Date: September 30, 2016 Contractor: Forman Signs Company Inc Client: Rittenhouse Plaza Inc | Permit type: Sign permit | Permit status: Completed | Completion date: April 24, 2017 | Permit id: 686179 | |||||
SCORE 59 No change in use and occupancy classification. Interior alterations (prescriptive method) as per approved plans. Separate permit required for any mep work. All work shall be in accordance with historical commission approval Date: August 23, 2017 Contractor: Masterpiece Contractors Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 29, 2017 | Permit id: 807036 | |||||
Interior renovations Date: January 23, 2008 Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 24, 2009 | Permit id: 126622 | |||||
SCORE 96 Replace & relocate existing 200a panel. Date: January 28, 2008 Contractor: James Carrigan Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: January 28, 2008 | Permit id: 128808 | |||||
SCORE 99 Fast form building permit Date: February 20, 2008 Contractor: Hamada Inc Client: Rittenhouse Plaza Inc | Permit status: Active | Completion date: February 20, 2008 | Permit id: 130762 | |||||
SCORE 56 Interior demolition of one non-bearing closet wall to enlarge and existing bathroom Date: February 6, 2008 Contractor: J W Home Improvements Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: December 4, 2008 | Permit id: 130984 | |||||
SCORE 86 Condo - install 2 a c units w ductwork in apt.; bryant 1,2 cfm air handlers; install to condensing units on balcony; 2-1,0 cfm air handlers bryant; 2-30,0 condensing units bryant. Date: April 1, 2008 Contractor: Keith Herman Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 24, 2009 | Permit id: 142381 | |||||
SCORE 89 Rehabilitaion of unit instal.. Soil and waste line, along with water supply to fixtures, 3 water closets, 3 lavys, 2 showers, 1 laundry 1 kitchen sink, 1 tub Date: April 2, 2008 Contractor: Ra Lavin Plumbing And Heating Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 15, 2008 | Permit id: 142604 | |||||
SCORE 100 Rewire dwelling unit in mod as per plans. Date: August 22, 2008 Contractor: Costa Electric Llc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: August 22, 2008 | Permit id: 158087 | |||||
SCORE 62 New air cond crt, 8 recepts, 4 sws, 8 lts. New 1 amp svs panel. (cc dist) Date: September 5, 2008 Contractor: Day Brothers Electric Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 1, 2009 | Permit id: 175257 | |||||
SCORE 98 Interior alteration, no structural work only. No change the total unit number. Date: December 11, 2008 Contractor: Patriot Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 22, 2009 | Permit id: 188481 | |||||
Historical commission registered property. Remove existing roofing at vestibule. Provide new cold applied membrane roof as per approved historical commission plans. Date: December 29, 2008 Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 25, 2009 | Permit id: 194207 | |||||
SCORE 100 Replace 1 wc,1 lav,1 shower,1 kithcen and 1 laundry (apt bldg)the installation will comply with the philadelphia plumbing code 2004 Date: November 6, 2015 Contractor: Atis Plumbing And Hvac Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 650538 | |||||
SCORE 62 Level i minor interior renovations to existing unit. No structural alterations. Create walk in closet in master bedroom. Create closet in 2nd bedroom. Create closet in 2nd bedroom. Create office space. Bathroom and kitchen renovation. New cabinetry and appliances in kitchen. New tile and plumbing fixtures in bathroom.(separate permits required for mech., elec., plumbing) Date: December 2, 2015 Contractor: Thomas Rodgers Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 23, 2017 | Permit id: 655410 | |||||
SCORE 98 New master bathroom,toilet,sink and shower,hall bathroom-toilet,sink & tub,laundry-new stand pipe for washer,kitchen- sink,disposal & washer(drains & water lines). The installation will comply with the philadephia plubming code 2004 Date: January 20, 2016 Contractor: John Devine Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 24, 2017 | Permit id: 664644 | |||||
SCORE 100 Re-cover four existing non-illum awnings (sizes as per plans), each awning will receive one set 11"x76. 92" copy on front (5. 88sqft each set of copy). Replace faces on four 25"x 25" single-face non-illum wall plaques (4. 34 sqft each) Date: July 25, 2016 Contractor: Forman Signs Company Inc Client: Rittenhouse Plaza Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 25, 2016 | Permit id: 672989 | |||||
SCORE 100 Extend existing electrical service to new 200amp panel wire refrigerator,oven range hood,dishwasher,disposal,washer and dryer replace existing devices per 2008 nec (condo) Date: December 17, 2013 Contractor: Integrations Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 22, 2014 | Permit id: 511589 | |||||
SCORE 96 Rewire kitchen, install 3 recessed lights, 1 chandellier, 2 wall sconces in dining room, laundry room, 1 gfci, 1 dryer recept and 2 lights as per 2008 nec (cc district) Date: January 31, 2014 Contractor: Mario Electrical Contractor Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: January 31, 2014 | Permit id: 517978 | |||||
SCORE 100 Remove & cap existing drain and water line for the kitchen sink, install water line for the new location kitchen and reuse existing drain, cap drains and water line for the water closet, relocate drain and water line for the washer cap 3 4" gas line Date: February 7, 2014 Contractor: Mmb Contractors Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 518760 | |||||
SCORE 100 No change in use and occupancy classification. Interior alterations to the kitchen and bathroom as per approved plans. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. No changes work to exterior or windows and doors per philadelphia historical commission. Date: May 22, 2014 Contractor: Horstmann Lynch Cons Svcs Llc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 4, 2014 | Permit id: 525774 | |||||
SCORE 100 Installing 2 vanitys, 2 toilets, 1 kitchen sink, 1 garbage disposal, 1 dishwasher Date: October 29, 2009 Contractor: Digravio Plumbing And Heating Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 6, 2010 | Permit id: 245278 | |||||
SCORE 100 Disconnect dishwasher, garbage disposal and oven and reconnect new. Install (3) new undercabinet lighting fixtures. Replace ceiling lighting with (8)recessed lights. Replace kitchen counter receptacles with (3)gfi protected plug strips. (2)new pendant fixture and (3)new switch locations... In accordance with 2005 nec Date: November 23, 2009 Contractor: Electrical Wizardry Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: November 23, 2009 | Permit id: 249324 | |||||
SCORE 100 Install new lennox 4 ton a c unit on deck and blower coil to be place in hall closet and with related duct work Date: May 21, 2012 Contractor: Rocky Condino Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 23, 2013 | Permit id: 405963 | |||||
SCORE 100 Add to existing sanitary and water lines, 2 wc, 2 lavs, 2 sinks, and 1 mop recept(rittenhouse plaza) Date: July 3, 2012 Contractor: Bbj Mechanical Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 5, 2012 | Permit id: 414444 | |||||
SCORE 100 Relocate (36) sprinkler heads in basement. -apartments Date: July 5, 2012 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: October 5, 2012 | Permit id: 414768 | |||||
SCORE 100 Installation of sprinklers in hallway. This permit covers the installation only. Final approval must be granted through a separate permit. Existing sprinkler system must remain operational. Date: August 17, 2012 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: January 24, 2013 | Permit id: 415740 | |||||
SCORE 82 Reconfigure ductwork and chilled water piping. Install 1 fancoil, 1 electric duct heater, 1 louver, 4 exhausts and 7 grds-apt Date: August 22, 2012 Contractor: Thomas Babcock Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2012 | Permit id: 418352 | |||||
SCORE 100 New lighting and power in basement, new fire alarm system as per nfpa & 2008 nec (condos) Date: September 11, 2012 Contractor: Charles H Macdonald Electric I Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 18, 2013 | Permit id: 418797 | |||||
SCORE 99 Replacing master lav & dishwasher & sink in the kitchen only, replacing all one for one (apts) Date: August 23, 2012 Contractor: Fosh Plumbing And Heating Inc Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 26, 2012 | Permit id: 423833 | |||||
SCORE 100 Renovation to areas at first floor level, and renovation of residential corridors. Date: October 3, 2012 Contractor: Intech Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 17, 2013 | Permit id: 423995 | |||||
SCORE 98 Level 2 alterations: interior renovations as per plan Date: September 25, 2013 Contractor: Kane Builders Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 31, 2014 | Permit id: 494558 | |||||
SCORE 99 Interior only : kitchen remodel: remove existing appliances, cabinets, countertops and flooring remove non bearing wall between din rm and kitchen all new appliances cabinets, counters, flooring sink and range are flip flopped, re locate washer and dryer into utility closet, patch and paint new office room, remove cabinetry in exposed hidden window, patch and paint walls and ceiling Date: December 23, 2013 Contractor: David Biche Custom Construct Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 496887 | |||||
SCORE 100 Demolition of non load bearing kitchen and 2 existing bathrooms walls, other work allowed on this permit. No exterior work allowed on this permit, per historic commission. Date: October 2, 2013 Contractor: Walnut Tree Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: February 27, 2014 | Permit id: 498163 | |||||
SCORE 100 Remodel existing unit with new kitchen, 2 bathrooms and powder room - additional permits electrical and plumbing Date: October 17, 2013 Contractor: Walnut Tree Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 498164 | |||||
SCORE 99 Interior demolition non-load bearing walls of condominium unit 17-d. Date: January 25, 2011 Contractor: Patterson And Perkiss Inc Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: March 23, 2011 | Permit id: 322173 | |||||
SCORE 100 Relocation of 5 sprinkler heads in basement Date: January 10, 2011 Contractor: Majek Fire Protection, Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 8, 2011 | Permit id: 320073 | |||||
SCORE 99 Interior renovations to dwelling unit Date: February 22, 2011 Contractor: Patterson And Perkiss Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2011 | Permit id: 322175 | |||||
SCORE 93 Selective demolition and clean out of non-load bearing components and trash removal. Date: February 23, 2011 Contractor: Delaware Valley Remediation Ll Client: Rittenhouse Plaza Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 7, 2014 | Permit id: 325307 | |||||
SCORE 56 Remodel 2 bathrooms and ceramic tile in kitchen of condo Date: April 1, 2011 Contractor: Alex Harel Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 3, 2011 | Permit id: 326539 | |||||
SCORE 100 Master bathroom: water closet, (2)lavatories, shower, bathtub and washing machine box. Kitchen sink. Date: March 3, 2011 Contractor: William Gruber Jr Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 22, 2013 | Permit id: 327556 | |||||
SCORE 100 Unit 18-a - rittenhouse plaza - replace two water closets, two lavatories, one bathtub, one shower, one kitchen sink, one dishwasher, one laundry tub, one washing machine standpipe and one bar sink Date: March 7, 2011 Contractor: Adelphia Plumbing And Htng Corp Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 12, 2011 | Permit id: 328194 | |||||
SCORE 100 To install two new wet stanpipes and convert two existing dry standpipes to wet standpipes. Also to install four (4) 3" drain rises. Plus installation of a new diesel fire pump and 8" back flow preventor assembly Date: January 16, 2007 Contractor: Fire Protection Industries Inc Client: Rittenhouse Plaza Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: December 22, 2011 | Permit id: 32992 | |||||
SCORE 100 Installation of two carrier model#s 538 b & r heat pump systems including ductwork registers & line sets. Also two outdoor unico heat pumps. All penetrations through fire rated assemblies are to be fire stopped in accordance with code requirements. Penetrations are not permitted through exit stairs or elevator enclosures. Date: March 17, 2011 Contractor: Finn Hvac Inc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 330329 | |||||
SCORE 100 Rewire existing unit,including receptacles,switches,lighting,2 hvac systems,replacing existing circuit breaker panel,phone,data,cables jacks as per 2008 nec. Date: June 14, 2011 Contractor: A T B Electric Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: September 29, 2011 | Permit id: 333268 | |||||
SCORE 98 Interior alterations to private residence bathroom Date: November 1, 2011 Contractor: Patriot Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 6, 2011 | Permit id: 368169 | |||||
SCORE 100 Install 1 light - 1 gfi outlet only as per 2008 nec (cc district) residential high rise Date: October 28, 2011 Contractor: Mcgoldrick Electric Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 371079 | |||||
SCORE 97 Replacement of small drains & new fixtures bathrooms & kitchen (multi unit apts) Date: October 10, 2013 Contractor: Patrick Wilson Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 31, 2014 | Permit id: 499845 | |||||
SCORE 67 Renovate lighting receptacles,heating and a c,cable and telephone wires per 2008 nec (condo unit) Date: October 15, 2013 Contractor: G Hummel Elect Contractors Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: October 15, 2013 | Permit id: 500518 | |||||
SCORE 100 Interior demolition of existing finishes and non structural partitions as per attached plans. Date: November 21, 2013 Contractor: Shay Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 11, 2014 | Permit id: 502028 | |||||
SCORE 100 Interior renovations including kitchen and appliances, updated bathrooms fixtures, floor insulation and finishing, update electrical and new finished throughout as per the attached drawings. Additional permit required. Date: November 21, 2013 Contractor: Shay Construction Inc Client: Rittenhouse Plaza Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 505739 | |||||
SCORE 100 Install 69- light fixtures, 25- switches, 26- receptacles, 3-catv, 3- phone and 3- data jacks, 3- 120v smoke detectors, 11-gfcis, laundry circuit and 6- kitchen appliance lines... In accordance with 2008 nec (condo) Date: November 26, 2013 Contractor: A T B Electric Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 22, 2014 | Permit id: 505839 | |||||
SCORE 81 Unit 7d - interior alterations (plumbing) - sanitary drainage, waste,vent and water supply piping for alteration work to (3)water closets, (3)lavatories, (1)washing machine and (1)kitchen sink Date: December 19, 2013 Contractor: Michael Gruber Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 18, 2014 | Permit id: 509509 | |||||
SCORE 100 Unit 10-b (plumbing alterations) - kitchen sink, dishwasher, washing machine standpipe - (guest bath) change lavatory, water closet and add a new shower pan - (master bath) change lavatory and water closet Date: December 13, 2013 Contractor: Adelphia Plumbing And Htng Corp Client: Rittenhouse Plaza Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 511067 | |||||
SCORE 91 Replacing 2. 5 ton central air conditioner and air handler. All equipment and must be contained with in unit served Date: December 17, 2013 Contractor: Ugi Hvac Enterprises Inc Client: Rittenhouse Plaza Inc | Permit type: Mechanical permit | Permit status: Expired | Completion date: April 22, 2014 | Permit id: 511145 | |||||
SCORE 100 Rewire apartment 16a & 17a (same unit) to include 218-light fixtures,101-switches,83-recepts,8-gfci recepts,3-hvac line and disconnect,4-120v smokes,2-120v smoke co detector,200amp meter,100amp panel,125amp panel and 150amp panel with existing service as per 2008 nec (cc district) Date: December 13, 2017 Contractor: A T B Electric Inc Client: Rittenhouse Plaza Inc | Permit type: Electrical permit | Permit status: Active | Completion date: December 13, 2017 | Permit id: 828655 |