Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: April 23, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 505813 | |||||
Mechanical permit Date: June 30, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 342161 | |||||
Suppression permit Date: February 9, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 583326 | |||||
Electrical permit Date: February 28, 2012 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 390432 | |||||
Electrical permit Date: October 7, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 293947 | |||||
Alteration permit Date: February 3, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 584104 | |||||
Use permit Date: July 9, 2012 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 388507 | |||||
Suppression permit Date: June 2, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 277480 | |||||
Zoning permit Date: January 15, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 233337 | |||||
Zoning/use permit Date: August 8, 2011 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 337086 | |||||
Sign permit Date: April 24, 2012 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 398613 | |||||
Electrical permit Date: January 31, 2008 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 122590 | |||||
Electrical permit Date: February 12, 2014 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 519586 | |||||
Demolition permit Date: September 14, 2016 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 721859 | |||||
Sign permit Date: August 22, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 548376 | |||||
Electrical permit Date: June 24, 2011 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 340881 | |||||
Electrical permit Date: August 25, 2015 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 634359 | |||||
Alteration permit Date: March 5, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 253019 | |||||
Alteration permit Date: April 14, 2016 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 679651 | |||||
Plumbing permit Date: July 14, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 537657 | |||||
Alteration permit Date: May 11, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 337747 | |||||
Zoning/use permit Date: November 14, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 431983 | |||||
Electrical permit Date: August 4, 2016 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 698048 | |||||
Plumbing permit Date: February 14, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 387903 | |||||
Sign permit Date: October 17, 2011 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 364980 | |||||
Use permit Date: November 5, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 572315 | |||||
Administrative permit Date: January 14, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 515238 | |||||
Plumbing permit Date: December 6, 2011 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 377388 | |||||
Administrative permit Date: October 26, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 300777 | |||||
Mechanical permit Date: August 5, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 626052 | |||||
Zoning/use permit Date: October 21, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 491370 | |||||
Electrical permit Date: March 4, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 456771 | |||||
Suppression permit Date: January 3, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 513986 | |||||
Zoning permit Date: September 16, 2009 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 207809 | |||||
Demolition permit Date: March 18, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 267680 | |||||
Plumbing permit Date: May 5, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 271097 | |||||
Alteration permit Date: November 25, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 505819 | |||||
Electrical permit Date: November 19, 2007 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 116160 | |||||
Mechanical permit Date: July 21, 2010 Client: St Agnes Mob Llc | Permit status: Expired | Permit id: 287384 | |||||
Administrative permit Date: January 9, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 441776 | |||||
Suppression permit Date: June 30, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 345433 | |||||
Alteration permit Date: February 1, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 384809 | |||||
Mechanical permit Date: March 9, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 392491 | |||||
Zoning/use permit Date: May 19, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 522099 | |||||
Use permit Date: September 16, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 639125 | |||||
Use permit Date: January 25, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 258476 | |||||
Plumbing permit Date: April 1, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 592989 | |||||
Mechanical permit Date: July 14, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 540136 | |||||
Fast form building permit Date: January 14, 2010 Client: Mifflin Medical Center Ll | Permit status: Active | Permit id: 257328 | |||||
Zoning/use permit Date: September 22, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 267896 | |||||
Electrical permit Date: October 22, 2009 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 244063 | |||||
Demolition permit Date: November 7, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 572808 | |||||
Permit for the erection of an 8 ft. High ornamental fence at the property corner along mifflin and 15th streets; dimensions as shown on plans. (74 ft. Including 4 ft. Gate along mifflin, 75 ft. Including ft. Gate along 15th) Date: November 5, 2009 Client: Mifflin Medical Center Ll | Applicant: Ronald J. Patterson, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: January 14, 2010 | Permit id: 10396 | |||||
Permit for for the removal of all existing signage & for the erection of one (1) statically illuminated directional wall sign "c1," two (2) statically illuminated accessory building identification wall signs "a1" & "b1," two (2) statically illuminated accessory commercial wall signs "a2" & "b2," & one (1) triplefaced accessory digital display free standing sign "d1;" size & location as shown in application. For use as a hospital w. Accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, & accessory private parking garage for (325) spaces as previously approved. Date: July 31, 2013 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: October 21, 2013 | Permit id: 21019 | |||||
Permit for use as medical offices ( no overnight stays) on the first floor, for seven(7) single family residential units for adults 55 years or older on the second floor, for previously approved hospital with accessory pharmacy on the third floor, for thirteen rooming units, with common kitchen, for rooming /educational dormitory with one study/conference room on the 4th floor, for seven single family residential units for adults for ages 55 and above on the 5th floor, all in an existing five story structure. Date: May 4, 2012 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: June 28, 2012 | Permit id: 17937 | |||||
Permit for the removal of an existing flatwall banner sign (no permit on file) and replace with an internally illuminated flatwall sign (73"x140") accessory to an existing hospital with uses and signs as previously approved. Date: June 14, 2011 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: August 2, 2011 | Permit id: 15390 | |||||
Permit for the application is for the removal of two (2) existing signs and the erection of one (1) internally illuminated flat wall sign 44"x177 (76 sf) accessory to an existing independent health facility/medical offices and accessory offices as previously approved, size & location as shown in the application. Date: October 15, 2012 Client: Mifflin Medical Center Ll | Applicant: Adam E. Laver, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 14, 2012 | Permit id: 19096 | |||||
Permit for the creation of an adult daycare to include physical therapy, group activities, preparing and serving of food, ft / ot gym, clinic space and accessory offices, within an existing hospital complex with other uses as previously approved, no signs on this application. Date: September 27, 2010 Client: St Agnes Mob Llc | Applicant: Klehr Harrison Harvey Branzburg | Permit type: Appeal | Permit status: Granted | Completion date: October 29, 2010 | Permit id: 13420 | |||||
Permit for the removal of one (1) existing flatwall sign (73"x14) and replace with a new flatwall sign (15x6) accessory to the existing hospital complex. Date: January 23, 2012 Client: St Agnes Mob Llc | Applicant: Forrest T. Passerin, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 27, 2012 | Permit id: 17048 | |||||
Permit for the removal of existing signs and for the erection of two(2) single faced flat wall sighs acc to an existing hospital complex, on the same lot with uses as previously approved. Date: June 16, 2010 Client: Mifflin Medical Center Ll | Applicant: Carrie B. Nase, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 31, 2010 | Permit id: 11953 | |||||
Permit for the relocation of lot lines to create two (2) lots from three (3) deeded lots (one zoning lot and two brt accounts, 19 s broad st. And 19 s broad st). 19 s. Broad street independent medical office. 19 s. Broad street, for the legalization of the erection of one (1) story trailer structure (28x10x10) for accessory storage of equipment for hospital and for the legalization of the erection of a canopy (10x6) and accessory daycare for hospital employees for children with accessory preparing and serving of food, a accessory chapel and accessory garage (with helicopter pad at the top of the hospital garage ) with a total of 325 parking spaces and accessory signage all as part of an existing hospital with all other uses as previously approved. Date: April 8, 2009 Client: Mifflin Medical Center Ll | Applicant: Ronald J. Patterson, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 8801 | |||||
Permit for the removal of previously approved freestanding sign (sign d1) (building permit not obtained). For the erection of one (1) three (3)-faced accessory free standing sign with digital display on two (2) faces (sign e). For use as a hospital with accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, and accessory private parking garage for (325) spaces as previously approved. Date: April 17, 2014 Client: St Agnes Mob Llc | Applicant: Brett Feldman, Esq. | Permit type: Appeal | Permit status: Granted | Permit id: 22605 | |||||
Electrical permit Date: February 4, 2014 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 513330 | |||||
Electrical permit Date: November 19, 2007 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 116160 | |||||
Alteration permit Date: April 23, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 505813 | |||||
Zoning use permit Date: January 25, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 258477 | |||||
Electrical permit Date: January 31, 2008 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 122590 | |||||
Sign permit Date: April 24, 2012 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 398613 | |||||
Use permit Date: November 5, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 572315 | |||||
Fast form building permit Date: January 14, 2010 Client: Mifflin Medical Center Ll | Permit status: Active | Permit id: 257328 | |||||
Plumbing permit Date: June 3, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 341684 | |||||
Alteration permit Date: February 7, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 319791 | |||||
Electrical permit Date: May 7, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 272297 | |||||
Sign permit Date: August 22, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 548376 | |||||
Electrical permit Date: January 23, 2012 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 379558 | |||||
Zoning permit Date: September 16, 2009 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 186537 | |||||
Suppression permit Date: June 30, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 613965 | |||||
Sign permit Date: October 17, 2011 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 364980 | |||||
Electrical permit Date: March 4, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 456771 | |||||
Mechanical permit Date: May 11, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 267450 | |||||
Use permit Date: October 25, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 300814 | |||||
Plumbing permit Date: May 10, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 277623 | |||||
Plumbing permit Date: July 21, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 614650 | |||||
Mechanical permit Date: January 17, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 514710 | |||||
Suppression permit Date: February 11, 2014 Client: St Agnes Mob Llc | Permit status: Expired | Permit id: 511960 | |||||
Administrative permit Date: July 25, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 551776 | |||||
Use permit Date: September 16, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 639125 | |||||
Demolition permit Date: March 18, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 267680 | |||||
Plumbing permit Date: January 3, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 508887 | |||||
Alteration permit Date: September 19, 2016 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 714667 | |||||
Electrical permit Date: December 20, 2011 Client: Mifflin Medical Center Ll | Permit status: Expired | Permit id: 360342 | |||||
Alteration permit Date: February 3, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 584104 | |||||
Electrical permit Date: October 22, 2009 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 244063 | |||||
Zoning use permit Date: June 10, 2011 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 339754 | |||||
Suppression permit Date: June 30, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 345433 | |||||
Alteration permit Date: March 19, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 265305 | |||||
Plumbing permit Date: November 4, 2016 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 700173 | |||||
Electrical permit Date: August 19, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 626208 | |||||
Alteration permit Date: January 3, 2017 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 736897 | |||||
Mechanical permit Date: March 9, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 392491 | |||||
Administrative permit Date: October 26, 2010 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 300777 | |||||
Mechanical permit Date: June 10, 2015 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 601303 | |||||
Administrative permit Date: January 9, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 441776 | |||||
Suppression permit Date: August 27, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 291418 | |||||
Use permit Date: January 3, 2017 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 741695 | |||||
Use permit Date: July 9, 2012 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 388507 | |||||
Mechanical permit Date: June 30, 2011 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 342161 | |||||
Zoning permit Date: January 15, 2010 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 233337 | |||||
Electrical permit Date: December 13, 2016 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 743098 | |||||
Alteration permit Date: November 25, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 505819 | |||||
Zoning use permit Date: April 10, 2012 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 381437 | |||||
Demolition permit Date: September 14, 2016 Client: St Agnes Mob Llc | Permit status: Active | Permit id: 721859 | |||||
Plumbing permit Date: February 14, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 387903 | |||||
Demolition permit Date: November 7, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 572808 | |||||
Zoning use permit Date: May 19, 2014 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 522099 | |||||
Alteration permit Date: February 1, 2012 Client: Mifflin Medical Center Ll | Permit status: Completed | Permit id: 384809 | |||||
Zoning use permit Date: October 21, 2013 Client: St Agnes Mob Llc | Permit status: Completed | Permit id: 491370 | |||||
Permit for use as medical offices ( no overnight stays) on the first floor, for seven(7) single family residential units for adults 55 years or older on the second floor, for previously approved hospital with accessory pharmacy on the third floor, for thirteen rooming units, with common kitchen, for rooming educational dormitory with one study conference room on the 4th floor, for seven single family residential units for adults for ages 55 and above on the 5th floor, all in an existing five story structure. Date: May 4, 2012 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: June 28, 2012 | Permit id: 17937 | |||||
Permit for for the removal of all existing signage & for the erection of one (1) statically illuminated directional wall sign "c1," two (2) statically illuminated accessory building identification wall signs "a1" & "b1," two (2) statically illuminated accessory commercial wall signs "a2" & "b2," & one (1) triplefaced accessory digital display free standing sign "d1;" size & location as shown in application. For use as a hospital w. Accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, & accessory private parking garage for (325) spaces as previously approved. Date: July 31, 2013 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: October 21, 2013 | Permit id: 21019 | |||||
Permit for the application is for the removal of two (2) existing signs and the erection of one (1) internally illuminated flat wall sign 44"x177 (76 sf) accessory to an existing independent health facility medical offices and accessory offices as previously approved, size & location as shown in the application. Date: October 15, 2012 Client: Mifflin Medical Center Ll | Applicant: Adam E. Laver, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 14, 2012 | Permit id: 19096 | |||||
Permit for the removal of an existing flatwall banner sign (no permit on file) and replace with an internally illuminated flatwall sign (73"x140") accessory to an existing hospital with uses and signs as previously approved. Date: June 14, 2011 Client: St Agnes Mob Llc | Applicant: Carl Primavera, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: August 2, 2011 | Permit id: 15390 | |||||
Permit for the erection of an 8 ft. High ornamental fence at the property corner along mifflin and 15th streets; dimensions as shown on plans. (74 ft. Including 4 ft. Gate along mifflin, 75 ft. Including ft. Gate along 15th) Date: November 5, 2009 Client: Mifflin Medical Center Ll | Applicant: Ronald J. Patterson, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: January 14, 2010 | Permit id: 10396 | |||||
Permit for the creation of an adult daycare to include physical therapy, group activities, preparing and serving of food, ft ot gym, clinic space and accessory offices, within an existing hospital complex with other uses as previously approved, no signs on this application. Date: September 27, 2010 Client: St Agnes Mob Llc | Applicant: Klehr Harrison Harvey Branzburg | Permit type: Appeal | Permit status: Granted | Completion date: October 29, 2010 | Permit id: 13420 | |||||
Permit for the removal of existing signs and for the erection of two(2) single faced flat wall sighs acc to an existing hospital complex, on the same lot with uses as previously approved. Date: June 16, 2010 Client: Mifflin Medical Center Ll | Applicant: Carrie B. Nase, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 31, 2010 | Permit id: 11953 | |||||
Permit for the removal of one (1) existing flatwall sign (73"x14) and replace with a new flatwall sign (15x6) accessory to the existing hospital complex. Date: January 23, 2012 Client: St Agnes Mob Llc | Applicant: Forrest T. Passerin, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 27, 2012 | Permit id: 17048 | |||||
Permit for the relocation of lot lines to create two (2) lots from three (3) deeded lots (one zoning lot and two brt accounts, 19 s broad st. And 19 s broad st). 19 s. Broad street independent medical office. 19 s. Broad street, for the legalization of the erection of one (1) story trailer structure (28x10x10) for accessory storage of equipment for hospital and for the legalization of the erection of a canopy (10x6) and accessory daycare for hospital employees for children with accessory preparing and serving of food, a accessory chapel and accessory garage (with helicopter pad at the top of the hospital garage ) with a total of 325 parking spaces and accessory signage all as part of an existing hospital with all other uses as previously approved. Date: April 8, 2009 Client: Mifflin Medical Center Ll | Applicant: Ronald J. Patterson, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 8801 | |||||
Permit for the removal of previously approved freestanding sign (sign d1) (building permit not obtained). For the erection of one (1) three (3)-faced accessory free standing sign with digital display on two (2) faces (sign e). For use as a hospital with accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, and accessory private parking garage for (325) spaces as previously approved. Date: April 17, 2014 Client: St Agnes Mob Llc | Applicant: Brett Feldman, Esq. | Permit type: Appeal | Permit status: Granted | Permit id: 22605 | |||||
For the removal of existing signs and the erection of two (2) single faced flat wall signs, size and location as shown in application. Signs accessory to an existing hospital complex with other uses as previously approved. Date: September 22, 2010 Client: Mifflin Medical Center Ll | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 19, 2013 | Permit id: 267896 | |||||
To amend permit # 300777 to include the lawful occupancy for a dining hall (1 people) accessory to an existing adult daycare center. Date: January 9, 2013 Client: St Agnes Mob Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: February 27, 2013 | Permit id: 441776 | |||||
SCORE 100 Remove existing flatwall sign and install the new flatwall sign. Call virginia berger at ( 856) 829-14 for exact location of sign Date: April 24, 2012 Contractor: Philadelphia Sign Company Client: St Agnes Mob Llc | Permit type: Sign permit | Permit status: Completed | Completion date: November 19, 2012 | Permit id: 398613 | |||||
SCORE 89 Install 4-phone data, 122 lights, 70-outlets, & 45-switches as per nec 2008 (mixed use) (south district) Date: July 14, 2014 Contractor: J And J Electrical Contractors Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: July 14, 2014 | Permit id: 535822 | |||||
SCORE 100 For the installation of a fire suppression system to include backflow prevention assembly, piping and sprinklers heads on the third floor as per plan. Date: June 30, 2011 Contractor: Independence Fire Sprinkler Co Client: Mifflin Medical Center Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 345433 | |||||
SCORE 100 Reduce meter to 5 8" Date: May 10, 2010 Contractor: Bartholomew Emanuel Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 1, 2011 | Permit id: 277623 | |||||
SCORE 100 Tenant fit out-medical office as per plan. Date: February 1, 2012 Contractor: Clemens Construction Co Inc Client: Mifflin Medical Center Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: May 17, 2012 | Permit id: 384809 | |||||
SCORE 100 Installation of pantry sink and ice maker Date: February 14, 2012 Contractor: Lees Plumbing Inc Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 9, 2012 | Permit id: 387903 | |||||
SCORE 99 Low voltage security wire and component provided by others, 7 card readers ,7 request to exit pirs, 4 glass break dectors, 6 ip cameras, 1 access panel as per 2008 nec (south district) office bldg Date: February 28, 2012 Contractor: Goldhorn Electrical Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: February 28, 2012 | Permit id: 390432 | |||||
SCORE 99 Furnish and install new diffusers and return grilles to existing ductwork for office space fitout. Date: March 9, 2012 Contractor: Hunter Mechanical Inc Client: Mifflin Medical Center Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 392491 | |||||
SCORE 100 Replace existing lighting with new fixtures 80, add receptacles to basting circuits and panels as per 2008 nec Date: July 14, 2010 Contractor: Michael Kowal Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: July 14, 2010 | Permit id: 285203 | |||||
SCORE 100 Interior demo only Date: June 30, 2010 Contractor: Frank Esposito Const Co Inc Client: Mifflin Medical Center Ll | Permit type: Demolition permit | Permit status: Completed | Completion date: October 17, 2011 | Permit id: 288488 | |||||
SCORE 100 Connect into existing 4" sprinkler supply new 2. 5" bulk main tothe work area. New wet sprinkler protection throughout the existing admin offices 61 new heads Date: August 27, 2010 Contractor: Independence Fire Sprinkler Co Client: Mifflin Medical Center Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 291418 | |||||
Bldg. Permit pertains to new lobby with elevator & supplemental stairs & new exterior canopy per plan. No interior alts. Included for suites a, b, c, & d. Special inspections required. Date: February 7, 2011 Client: Mifflin Medical Center Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: December 18, 2012 | Permit id: 319791 | |||||
SCORE 100 Interior renovations to existing 2nd and 3rd floor office suite as part of hospital per plan. Date: May 11, 2011 Contractor: Target Building Construction Client: Mifflin Medical Center Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: November 3, 2011 | Permit id: 337747 | |||||
SCORE 100 Compl ltg pkg,(1) 15kva tranf,(1)100a pnl,26 sws,138 recs, gfis,47 boxes sleeves for ph data,(1) db sys,new fa equip to connect to exist sys,pwr for auto door opener,(1) wtr htr,(1) pump,(1) dw 4 relocated radiant ceiling pnls Date: June 24, 2011 Contractor: Kevin Ford Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: June 24, 2011 | Permit id: 340881 | |||||
SCORE 100 Adding (1) sink on 3rd floor, (11) sinks, (1) lav sink and (1) toilet on 2nd floor Date: June 3, 2011 Contractor: Joseph Rosati Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 25, 2013 | Permit id: 341684 | |||||
SCORE 100 For the partial demolition of existing mechanical system and for the installation of new ducts, registers and diffusers as per plans. Date: June 30, 2011 Contractor: Pmc Mechanical Contractors Inc Client: Mifflin Medical Center Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 342161 | |||||
For the removal of two (2) existing signs and for the erection of one (1) internally illuminated flatwall sign. Size and location as shown in the application. Sign accessory to an existing health facility medical offices and accessory offices as previously approved. Date: November 14, 2012 Client: Mifflin Medical Center Ll | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 19, 2013 | Permit id: 431983 | |||||
SCORE 95 Reconfigure wiring to have at&t equipment on existing generator as per nec 2008 (medical center) Date: February 4, 2014 Contractor: Hatzel And Buehler Inc Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: August 18, 2016 | Permit id: 513330 | |||||
SCORE 99 Replace 30-existing mercury vapor lgt fix w new 4 2 tube t5 vapor proof flor lgt fix & conduit & wire where necessary in ground level parking garage (comm) - all work will comply with the 2008 nec Date: February 12, 2014 Contractor: A B M Electric Corporation Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: November 10, 2015 | Permit id: 519586 | |||||
SCORE 99 Replacing 100amp 4 volt-3 phase feeder for a c unit (health care)south district Date: August 25, 2015 Contractor: A B M Electric Corporation Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2016 | Permit id: 634359 | |||||
SCORE 100 For level ii interior alterations to create a new exercise area in an existing physical therapy facility. Work to include interior non-bearing partitions, millwork, and finishes. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. All asbestos to be treated and removed prior to commencement of work. Date: April 7, 2017 Contractor: Axis Construction Mngmnt Llc Client: Mifflin Medical Center Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: July 21, 2017 | Permit id: 764838 | |||||
SCORE 86 Alterations: interior plumbing;new exercise area; existing physical therapy facility -the installation will comply with the philadelphia plumbing code 2004 Date: May 16, 2017 Contractor: Rosati Mechanical Inc Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 780966 | |||||
SCORE 100 Amend alterations permit #764838 to include revisions to structural support of first floor as per approved plans. Date: May 16, 2017 Contractor: Dva Services Client: Mifflin Medical Center Ll | Permit type: Administrative permit | Permit status: Completed | Completion date: June 15, 2017 | Permit id: 781471 | |||||
SCORE 94 Installation of ductwork in the basement area to provide floor diffusers serving the gym area and overhead ductwork in the office exam staff waiting areas to include ceiling diffusers and exhaust fans at toilet rooms, gym, janitorial and soiled closets. Separate permits required for heat pumps, electrical and plumbing work. Date: June 7, 2017 Contractor: Epay Inc Client: Mifflin Medical Center Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 782242 | |||||
For the legalization of the erection of one(1) story trailer structure( 28x10x10), for the legalization of the erection of a canopy (10x6). Size and location as shown in the application. For an accessory storage of equipment, accessory day care for hospital employees only for children with accessory preparing and serving of food , accessory chapel and accessory garage ( with helicopter pad at the top of the hospital garage) with a total of 325 parking spaces and accessory signage all as part of an existing hospital with all other uses as previously approved. Date: January 25, 2010 Client: St Agnes Mob Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 258477 | |||||
SCORE 100 New sprinkler system throughout the renovated office area on the fourth floor only as per plans. Connect to existing standpipe riser in stairtower with existing pump and backflow. Date: March 17, 2010 Contractor: Independence Fire Sprinkler Co Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: January 11, 2011 | Permit id: 262502 | |||||
SCORE 99 Renovations on 4th floor to turn patient rooms into office spaces as per plans. Separate permits required for mechanical and electrical. Date: March 19, 2010 Contractor: John S Mcmanus Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 265305 | |||||
SCORE 99 Alterations to an existing medical facility. Date: April 29, 2010 Contractor: John S Mcmanus Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 265774 | |||||
SCORE 100 Hvac and ductwork as per plan. Date: May 11, 2010 Contractor: Herman Goldner Co Inc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 267450 | |||||
SCORE 99 Interior demo in an adult daycare office Date: March 18, 2010 Contractor: John S Mcmanus Inc Client: St Agnes Mob Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 267680 | |||||
SCORE 99 Supply and isntall four sub-panels, wiring for normal and emergency receptacles,lighting circuits and xray room with amp shunt trip breaker, as per plans no fire alarm on this permit Date: November 7, 2017 Contractor: A B M Electric Corporation Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 820629 | |||||
SCORE 100 Alterations: interior plumbing;hospital ground floor 15 fixtures; modify existing sanitary drain vent lines,including extending existing domestic water lines - the installation will comply with the philadephia plubming code 2004 Date: November 29, 2017 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 826296 | |||||
SCORE 89 Level ii interior alterations to include partial change of occupancy to create a group medical health practitioners office (dialysis center) in ground floor suite b (aka unit 7) in an existing multistory medical office building as per approved plans. Existing building fully sprinklered. Separate permits required for mep & fire suppression work Date: February 3, 2015 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 29, 2015 | Permit id: 584104 | |||||
SCORE 100 Tap into existing sani drains & modify plumbing to install 4-powder rooms & a number of sinks, roughin indirect waste & run domestic water & connect fixtures (health care) note: the installation will comply with the philadelphia plumbing code 2004 Date: April 1, 2015 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 592989 | |||||
SCORE 89 Intstallnormal & emergency power, feed panels and transformers, 1 light fixtures, switches and 1 outlets as per 2008 nec (south district) Date: June 2, 2015 Contractor: J And J Electrical Contractors Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: October 31, 2015 | Permit id: 594241 | |||||
SCORE 89 Asbestos remediation required prior to start of work for the demolition and erection of interior partitions, accessibility upgrades, and millwork. Space to be used as a day care facility. Two means of egress provided from each classroom, egress through adjoining spaces must be accessory to classroom and exit access shall not pass through a room that can be locked. Structure is fully sprinklered. Separate permits required for fire suppression, mechanical, electrical, and plumbing. Date: May 19, 2015 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 18, 2015 | Permit id: 600397 | |||||
SCORE 99 Interior alterations long term i. C. U. Per plans. Plan review to include exhaust system hvac ductwork modifications see mechanical permit ap # 253535 for approved hvac ductwork permit sheets a-5 for scanned plan Date: March 5, 2010 Contractor: John S Mcmanus Inc Client: Mifflin Medical Center Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: August 11, 2010 | Permit id: 253019 | |||||
SCORE 100 Installation of new wiring for 2 outlets, 89 phone data drops and 1 light fixtures and install panels from existing service. Installation comply with articles 240. 21(c)(transf sec conductor length) & 450. 3(b) (110a mcb in panels ima 1 & 2. Date: January 8, 2014 Contractor: Jurkofsky Joseph Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 17, 2014 | Permit id: 509353 | |||||
SCORE 99 Emergency generator & related work as per plans. Date: November 19, 2007 Contractor: A B M Electric Corporation Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 116160 | |||||
SCORE 71 Install (53) addressable intelligent smoke detectors, (28) smoke detector remote lights in corridor for patient rooms, (4) horn strobes and (4) strobes to be connected to existing system (south dist) Date: January 31, 2008 Contractor: Kanian, Charles M Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: January 31, 2008 | Permit id: 122590 | |||||
The relocation of lot lines to create two (2) lots from three (3) deeded lots ( one zoning lot and two brt accounts, 19 s broad street, and 19 s broad street). Size and location as shown in the application. Date: September 16, 2009 Client: Mifflin Medical Center Ll | Permit type: Zoning permit | Permit status: Completed | Completion date: July 19, 2013 | Permit id: 186537 | |||||
Relocation of lot lines to create two lots from three deeded lots (one zoning lot and two brt accounts),size & location as shown in the application Date: September 16, 2009 Client: Mifflin Medical Center Ll | Permit type: Zoning permit | Permit status: Completed | Completion date: March 9, 2010 | Permit id: 207809 | |||||
SCORE 99 Supply and install 5 - 20amp 120v duplex recepts and branch circuits in pharmacy, supply and install boxes and sleeves for 3 data and phone jacks as per 2005 nec (south district) Date: October 22, 2009 Contractor: A B M Electric Corporation Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: February 16, 2010 | Permit id: 244063 | |||||
SCORE 100 34 fixtures with piping as per plans Date: May 5, 2010 Contractor: Herman Goldner Co Inc Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 271097 | |||||
SCORE 100 Remove existing, install new devices with new panel tie into existing main panel as per 2008 nec (south district) Date: May 7, 2010 Contractor: Michael Kowal Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: September 15, 2010 | Permit id: 272297 | |||||
SCORE 99 Exhaust system hvac ductwork modifications. For approved scanned hvac ductwork plan refer to ap plan # 253019 sheets a-5 Date: March 5, 2010 Contractor: John S Mcmanus Inc Client: Mifflin Medical Center Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 11, 2010 | Permit id: 253535 | |||||
SCORE 100 Fast form building permit Date: January 14, 2010 Contractor: Independence Fire Sprinkler Co Client: Mifflin Medical Center Ll | Permit status: Active | Completion date: January 14, 2010 | Permit id: 257328 | |||||
For use as a medical offices and accessory offices in an existing structure. No sign on this application. Date: January 25, 2010 Client: Mifflin Medical Center Ll | Permit type: Use permit | Permit status: Completed | Completion date: July 19, 2013 | Permit id: 258476 | |||||
SCORE 100 Alterations: add switches, receptacles & lights per plans. Date: February 23, 2010 Contractor: Michael Kowal Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: February 23, 2010 | Permit id: 260216 | |||||
SCORE 100 New lights, switches,receptacles and panels as per 2008 nec, see notes sheet e0. 11. Date: April 7, 2010 Contractor: Michael Kowal Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: September 15, 2010 | Permit id: 266903 | |||||
SCORE 61 Level ii interior alterations with partial change of occupancy to create a group medical office in the ground floor of an existing building as per approved plans. Existing building fully sprinklered. Separate permits required for mep & fire suppression work Date: January 3, 2017 Contractor: Constitution Contractors Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 2, 2017 | Permit id: 736897 | |||||
SCORE 99 Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: December 23, 2016 Contractor: Jottan Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 742250 | |||||
SCORE 100 Furnish & install 25-cat5, plenum cables longest run 125 as per nec 2008 south district Date: December 13, 2016 Contractor: Gt Telecom Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: February 6, 2017 | Permit id: 743098 | |||||
SCORE 99 Install receptacles, switches, data & phone, x-ray rm, 480v panel, 30kva transformer & 208 1 volt panel as per nec 2008 south district Date: February 7, 2017 Contractor: A B M Electric Corporation Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 2, 2017 | Permit id: 748310 | |||||
SCORE 100 Alterations: interior plumbing; medical office in the ground floor - the installation will comply with the philadephia plubming code 2004 Date: February 27, 2017 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 2, 2017 | Permit id: 753275 | |||||
SCORE 61 For the demolition and erection of interior partitions, accessibility upgrades, and millwork. Structure for use as hospital (existing). Structure is fully sprinklered. Separate permits required for fire suppression, mechanical, electrical, and plumbing. See asbestos inspection report for notes regarding remediation Date: April 26, 2017 Contractor: Constitution Contractors Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: May 22, 2017 | Permit id: 771498 | |||||
SCORE 100 Connect to existing plumbing drainage to supply bathrooms for daycare connect to existing domestic water in ceiling (health care facility) Date: July 14, 2014 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 537657 | |||||
SCORE 100 Install four new vavs, new ductwork, reconfiguring of existing ductwork, grds Date: July 14, 2014 Contractor: Direct Air Llc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 540136 | |||||
SCORE 100 For the erection of five (5) wall signs w. Channel letters & logo panels w. Connection to exist. Ext. Wall & one (1) triple-faced free standing sign with tube steel framing & isolated concrete spread footing foundation. Separate permit required for electrical work. Date: August 22, 2014 Contractor: City Sign Service Inc Client: St Agnes Mob Llc | Permit type: Sign permit | Permit status: Completed | Completion date: September 18, 2015 | Permit id: 548376 | |||||
SCORE 80 Relocate existing sprinkler heads for new partitions. Mostly adjust head elevation for new ceiling. About heads. - daycare center Date: July 15, 2014 Contractor: Apex Plumbing And Heating Inc Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 18, 2014 | Permit id: 549190 | |||||
SCORE 89 Tco for permit 505813,2nd floor daycare Date: July 25, 2014 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 551776 | |||||
SCORE 89 Install 2-40-amp, 120v ckts for new pylon sign corner of broad & mckean & 120f gfci outlet in garden area sign as per nec 2008 (mixed use) Date: September 16, 2014 Contractor: J And J Electrical Contractors Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 29, 2015 | Permit id: 561943 | |||||
Use of a portion of ground floor level(unit 7) for group, medical and health practitioners as per submitted plans, no change to envelope of building or existing uses or signs Date: November 5, 2014 Client: St Agnes Mob Llc | Permit type: Use permit | Permit status: Completed | Completion date: November 5, 2014 | Permit id: 572315 | |||||
SCORE 89 35 square feet, interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Contact streets department for dumpster permit and footway closure permits. Date: November 7, 2014 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: September 18, 2015 | Permit id: 572808 | |||||
SCORE 89 Day tco for ap# 505819 Date: January 14, 2014 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: January 21, 2014 | Permit id: 515238 | |||||
For the removal of previously approved freestanding sign (sign d1) (building permit not obtained). For the erection of one (1) three (3)-faced accessory free standing sign with digital display on two (2) faces (sign e). Size and location as shown on application plans. For use as a hospital with accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, and accessory private parking garage for (325) spaces as previously approved. Date: May 19, 2014 Client: St Agnes Mob Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 19, 2014 | Permit id: 522099 | |||||
SCORE 80 Relocate existing sprinkler heads as required. Date: January 3, 2014 Contractor: Apex Plumbing And Heating Inc Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: April 2, 2014 | Permit id: 513986 | |||||
SCORE 100 Installation of hvac system to existing system, including vav boxes, reheat coils, ductwork, diffusers, accessory mechanicals for administrative offices renovations-floor layout. Date: January 17, 2014 Contractor: Direct Air Llc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 514710 | |||||
SCORE 100 Repairs to the exterior of an existing structure to include the following: clean and coat existing steel shelf angles, remove and reset displaced granite stone, limestone spall repair and stone repointing at select areas. No alterations to the interior of the structure. A covered walkway or sidewalk closure shall be required within 21 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. Date: June 27, 2017 Contractor: Palmer Waterproofing Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Active | Completion date: July 18, 2017 | Permit id: 771677 | |||||
SCORE 100 Modify existing drainage venting water lines to fit out new office space (health care facility) Date: January 3, 2014 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 9, 2014 | Permit id: 508887 | |||||
SCORE 89 Interior alterations to create adminstrative offices for a health care center on the ground floor of an existing building. Alterations include room configurations, employee & patient service areas, waiting rooms and offices. Separate permits required for electrical, plumbing, mechanical and fire suppression systems. All asbestos to be treated removed prior to commencement of work. Date: November 25, 2013 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 4, 2014 | Permit id: 505819 | |||||
SCORE 89 Interior alterations to include tenant fit out, new ada restrooms, upgrades to finishes, interior lighting work, and all other work as per approved plans. Separate permit required for mechanical, electrical, plumbing, and fire suppression system work. All asbestos to be treated removed prior to commencement of work. Date: April 23, 2014 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 21, 2014 | Permit id: 505813 | |||||
SCORE 99 Installing a new lte 4 post rack in existing equipment room installing 48 volts from exiting power plant to new lte rack per 2008 nec (cell site) Date: March 4, 2013 Contractor: Skinner And Cook Inc Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 1, 2013 | Permit id: 456771 | |||||
For the removal of all existing signage & for the erection of one (1) statically illuminated directional wall sign "c1," two (2) statically illuminated accessory building identification wall signs "a1" & "b1," two (2) statically illuminated accessory commercial wall signs "a2" & "b2," & one (1) triple-faced accessory digital display free standing sign "d1;" size & location as shown in application. For use as a hospital w. Accessory signage, day care center, equipment storage building, religious assembly, business & professional offices, group living personal care, & accessory private parking garage for (325) spaces as previously approved. Date: October 21, 2013 Client: St Agnes Mob Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 21, 2013 | Permit id: 491370 | |||||
SCORE 100 Replacement of fire suppression system in existing garage in accordance with nfpa 13 as per approved plans. Date: February 11, 2014 Contractor: B. M. Consulting Services Inc Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Expired | Completion date: October 13, 2015 | Permit id: 511960 | |||||
SCORE 99 Remove 6 existing wireless antennas, erect 3 new lte antennas,3 gsm antennas, 3 remote radio heads and distribution boxes as per plans. Date: July 25, 2011 Contractor: Telecommunications Contracting Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: May 1, 2013 | Permit id: 347598 | |||||
SCORE 100 Remove existing wall sign 10x26 and install new internally illuminated wall sign for hospital. Date: October 17, 2011 Contractor: Ez Signs Llc Client: St Agnes Mob Llc | Permit type: Sign permit | Permit status: Completed | Completion date: January 3, 2012 | Permit id: 364980 | |||||
For the removal of one (1) existing flatwall sign (73"x14) and replace with a new flatwall sign (15x6), size and location as shown in the application. Sign accessory to the existing hospital complex. Date: April 10, 2012 Client: St Agnes Mob Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 381437 | |||||
For use as medical offices ( no overnight stays) on the first floor, for seven(7) single family residential units for adults 55 years or older on the second floor, for previously approved hospital with accessory pharmacy on the third floor, for thirteen rooming units, with common kitchen, for rooming educational dormitory with one study confrence room on the 4th floor, for seven single family residential units for adults for ages 55 and above on the 5th floor, all in an existing five story structure Date: July 9, 2012 Client: St Agnes Mob Llc | Permit type: Use permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 388507 | |||||
SCORE 100 Supply and install new floor control assembly, add & relocate piping as required in areas designated Date: February 9, 2015 Contractor: B. M. Consulting Services Inc Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 583326 | |||||
SCORE 99 "modifications to finishes. Small changes in partitions. New ceilings" permit to include minor demolition and the installation of non combustible partitions and ceilings to reconfigure an existing office space on the first floor. Separate permits required for plumbing, electrical, mechanical, and fire suppression work. Date: June 14, 2010 Contractor: John S Mcmanus Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 8, 2010 | Permit id: 283087 | |||||
SCORE 100 Hvac, including ductwork Date: July 21, 2010 Contractor: Herman Goldner Co Inc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Expired | Completion date: May 1, 2013 | Permit id: 287384 | |||||
SCORE 100 Install new feeder for chiller as per 2008 nec (south dist) Date: October 7, 2010 Contractor: Shoreline Electric Inc Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 6, 2010 | Permit id: 293947 | |||||
SCORE 99 Certificate of occupancy for first floor adult daycare. Refer to plans and permit #265774 for alterations. Date: October 26, 2010 Contractor: John S Mcmanus Inc Client: St Agnes Mob Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: October 27, 2010 | Permit id: 300777 | |||||
For the creation of an adult daycare to include physical theropy, group activities, preparing and serving of food, clinic spaces and accessory offices, no signs on this application. Date: October 25, 2010 Client: St Agnes Mob Llc | Permit type: Use permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 300814 | |||||
SCORE 99 New conduit from vewrizon telco demarc to at & t wireless equipment as per 2008 nec (south dist) Date: October 27, 2010 Contractor: Skinner And Cook Inc Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: October 27, 2010 | Permit id: 306365 | |||||
SCORE 82 Installation of 12 2x2 lights, six 2x4 lights 29 downlights 6 exits, 42 receptacles 11 baseboard heaters, 2 condenser units and fire alarm per nec 2008 Date: May 23, 2017 Contractor: Mj Kelly Electric Inc Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: July 19, 2017 | Permit id: 783967 | |||||
SCORE 61 Install 3-cat6 cables from demark to new phone room,install 13-cat6 cables to work areas and install 2-cat6 cables to wireless access point locations,all cables are plenum rated and the longest run is 100ft. As per 2008 nec (south district) Date: June 5, 2017 Contractor: Union Electric Contr Co Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 789312 | |||||
SCORE 100 Installation of an automatic sprinkler sytem on 2nd floor. Includes connections to existing system. Date: September 1, 2011 Contractor: Independence Fire Sprinkler Co Client: Mifflin Medical Center Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 356268 | |||||
SCORE 100 Install 8 amp service - with 5 2 amp panels and grounding as per 2008 nec Date: December 20, 2011 Contractor: Jaime Zappas Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: December 20, 2011 | Permit id: 360342 | |||||
SCORE 100 Relocate (2)accessible toilet rooms on the 1st floor and (1)kitchen sink on the 2nd floor; supply and install a new 4" house drain, (1)4" soil stack; rough and finish plumbing for (2)toilet rooms and (1)kitchen - note: at least (1)kitchen sink is required to be accessible to comply with the international building code Date: December 6, 2011 Contractor: Mazzucca Michael Client: Mifflin Medical Center Ll | Permit type: Plumbing permit | Permit status: Expired | Completion date: May 7, 2013 | Permit id: 377388 | |||||
SCORE 100 Fire alarm system throughout as per nfpa 72, wire exit and emergency lighting, feed elevator, 3 heat pumps, 3 condensors, wire lighting in foyer, 2 handicap bathrooms as per 2008 nec(south dist) medical offices Date: January 23, 2012 Contractor: Jaime Zappas Client: Mifflin Medical Center Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: January 23, 2012 | Permit id: 379558 | |||||
SCORE 100 Installation of sprinkler protection, new heads, piping, retrofit on existing system, as per submitted plans. Date: June 2, 2010 Contractor: Independence Fire Sprinkler Co Client: Mifflin Medical Center Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 277480 | |||||
SCORE 100 For the removal of an existing flatwall banner sign and replace with an internally illuminated flatwall sign (73" x 140"), (size and location as shown in the application). Sign accessory to an existing hospital with uses and signs as previously approved. Date: August 8, 2011 Contractor: Ez Signs Llc Client: St Agnes Mob Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 18, 2013 | Permit id: 337086 | |||||
SCORE 100 Installation of vav terminal units with associated piping, ductwork, grilles, registers and diffusers per plans throughout dialysis center. Separate permits required for all electrical and plumbing work. Rooftop unit installation requires separate permit, rtu installation not authroized at this time Date: June 10, 2015 Contractor: Direct Air Llc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 29, 2015 | Permit id: 601303 | |||||
SCORE 100 Installation of new main and branch lines served by existing supply and fire pump, for day care space on first floor of an existing building per nfpa 13 and approved plans. No work to existing supply or fire pump. Date: June 30, 2015 Contractor: B. M. Consulting Services Inc Client: St Agnes Mob Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: September 18, 2015 | Permit id: 613965 | |||||
SCORE 100 Modify existing drains, dom water to install 4 new bathroom, 7 new sinks and provide nessasary venting Date: July 21, 2015 Contractor: Apex Plumbing And Heating Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2015 | Permit id: 614650 | |||||
SCORE 100 Installation of five vav boxes tap off exiting system; grds and ductwork Date: August 5, 2015 Contractor: Direct Air Llc Client: St Agnes Mob Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 18, 2015 | Permit id: 626052 | |||||
SCORE 89 Install 60-outlets, 88-lights, 37-switches, 32-emergency lights & 14-exit signs as per nec 2008 south district (daycare) Date: August 19, 2015 Contractor: J And J Electrical Contractors Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: September 7, 2016 | Permit id: 626208 | |||||
For a day care center on ground floor space # 8 in an existing structure with all other uses as previously approved. Date: September 16, 2015 Client: St Agnes Mob Llc | Permit type: Use permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 639125 | |||||
SCORE 89 Interior renovations per plans. Date: April 14, 2016 Contractor: Vencio Design And Build Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 10, 2016 | Permit id: 679651 | |||||
SCORE 89 Install 1 light fixtures, switches, 225 outlets, install one new panel and replace one existing with new onto an existing service greater than 400amp as per 2008 nec (south district) Date: August 4, 2016 Contractor: J And J Electrical Contractors Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: September 9, 2016 | Permit id: 698048 | |||||
SCORE 100 Alterations:interior plumbing; fourth floor[common kitchen, for rooming units educational dormitory & study confrence room]; multistory medical health office building - the installation will comply with the philadephia plubming code 2004 Date: November 4, 2016 Contractor: Joseph T Miller Co Inc Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 10, 2016 | Permit id: 700173 | |||||
SCORE 99 Supply and install four sub panels emon dmon metering wiring for normal and emergency receptacles, lighting circuits sleeves for nurse call phone and cctv as per 2008 nec (south district) Date: July 24, 2017 Contractor: A B M Electric Corporation Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Active | Completion date: July 24, 2017 | Permit id: 783989 | |||||
SCORE 100 Replace 5" curbtrap & fai pa20172151637 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 3, 2017 Contractor: Tommys Plumbing Client: St Agnes Mob Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2017 | Permit id: 805455 | |||||
SCORE 99 Supply and install emon demon metering for panel lp-4, cb-4 cb-5 lp-5 rp5-b, rp4-a and rp4-b. Supply and install a 1 amp 208 1 volt 304w mlo sub panel on panel cb-4 and cb5 per 2008 nec (health care) south district Date: November 8, 2016 Contractor: A B M Electric Corporation Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: September 19, 2017 | Permit id: 732986 | |||||
SCORE 100 Erection of a sidewalk shelter platform as per engineered plans. Streets department permit is required for sidewalk closure prior to the start work. Date: August 17, 2017 Contractor: Complete Scaffold Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Active | Completion date: September 7, 2017 | Permit id: 809103 | |||||
SCORE 61 For interior level 2 alteration to the ground floor of an existing hospital as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: September 7, 2017 Contractor: Constitution Contractors Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Active | Completion date: September 7, 2017 | Permit id: 810883 | |||||
SCORE 96 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Demo existing ceilings, partition walls and flooring. Existing hvac and lighting to remain Date: September 14, 2016 Contractor: Mcdonald Building Co Llc Client: St Agnes Mob Llc | Permit type: Demolition permit | Permit status: Expired | Completion date: April 24, 2017 | Permit id: 721859 | |||||
SCORE 100 For level ii alterations to an existing building to include the removal and rebuilding of existing parapet walls, select brick repointing and concrete spall repair on the exterior facade. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for pedestrain protection. Pedestrian protection to be in place prior to the start of any work. Separate permits required for all other work. Date: September 19, 2016 Contractor: Palmer Waterproofing Inc Client: St Agnes Mob Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: April 24, 2017 | Permit id: 714667 | |||||
SCORE 100 Furnish and install 84 new cat6a plenum data with longest run being 275ft terminate cables in existing data racks in new cat6a patch panels. Support all new cabling terminate,test and label all new cabling (health care) Date: December 7, 2017 Contractor: Bluestone Communications Inc Client: St Agnes Mob Llc | Permit type: Electrical permit | Permit status: Active | Completion date: December 7, 2017 | Permit id: 828613 |