Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 87 Replace in kind: 1) badly heaved slab sections of existing concrete sidewalk and 2) deteriorated concrete leadwalk w/steps per ddot sesign standard. Grind old tree stump cause of heaving and repair soil. Block range on 19 block of belmont road nw, from 19th street to 1908 belmont. Client: Kathryn Kross | Permit type: Paving; leadwalk w/steps, paving; sidewalk(s) | Permit status: Permit expired | Expiration date: June 14, 2012 | Permit id: Pa70053 | |||||
SCORE 87 Replace in kind: 1) badly heaved slab sections of existing concrete sidewalk and 2) deteriorated concrete leadwalk w/steps per ddot sesign standard. Grind old tree stump cause of heaving and repair soil. Block range on 19 block of belmont road nw, from 19th street to 1908 belmont. Client: Kathryn Kross | Permit type: Paving; leadwalk w/steps, paving; sidewalk(s) | Permit status: Permit expired | Expiration date: August 31, 2012 | Permit id: Pa70053-R1 | |||||
SCORE 96 Manhole access 11 days Permit status: Notpaid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 93 Enp for ddot contractors Permit status: Expired | Expiration date: June 12, 2015 | Permit id: Pa10193170 | |||||
SCORE 89 Enp for ddot contractors Permit status: Expired | Expiration date: June 12, 2015 | Permit id: Pa10193168 | |||||
SCORE 96 Manhole access 11 days Permit status: Not paid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 87 Replace in kind: 1) badly heaved slab sections of existing concrete sidewalk and 2) deteriorated concrete leadwalk w/steps per ddot sesign standard. Grind old tree stump cause of heaving and repair soil. Block range on 19 block of belmont road nw, from 19th street to 1908 belmont. Client: Kathryn Kross | Permit type: Paving; leadwalk w/steps, paving; sidewalk(s) | Permit status: Permit expired | Expiration date: June 14, 2012 | Permit id: Pa70053 | |||||
SCORE 96 Manhole access 11 days Permit status: Notpaid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 87 Replace in kind: 1) badly heaved slab sections of existing concrete sidewalk and 2) deteriorated concrete leadwalk w/steps per ddot sesign standard. Grind old tree stump cause of heaving and repair soil. Block range on 19 block of belmont road nw, from 19th street to 1908 belmont. Client: Kathryn Kross | Permit type: Paving; leadwalk w/steps, paving; sidewalk(s) | Permit status: Permit expired | Expiration date: August 31, 2012 | Permit id: Pa70053-R1 | |||||
SCORE 95 Construction staging area Permit status: Permit expired | Expiration date: November 19, 2013 | Permit id: Pa10117047 | |||||
SCORE 96 Manhole access 11 days Permit status: Not paid | Expiration date: March 26, 2015 | Permit id: 0 | |||||
SCORE 63 Moving truck Permit status: Permit expired | Expiration date: August 2, 2015 | Permit id: Pa10201167 |