Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 81 Alteration Date: July 23, 2014 Contractor: Pace Tech Construction In Permit status: Permit issued | Permit id: 44014800101 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: March 7, 2003 Permit type: Gc | Permit id: E317443 | |||||
Repair leaks in basement. At the time of this invitation to bid, it is not anticipated that this work will disturb more than 2 sq feet of painted su Date: February 14, 2011 Value: $692 Permit type: Plumb | Permit id: Eb22751 | |||||
Remove all obstruction from water closet at wastline in the bathroom. Provide and install new ballcock with float assembly. Properly adjust. Date: December 11, 2010 Value: $170 Permit type: Plumb | Permit id: Eb17208 | |||||
Provide and install a total of 5 1 8 angle air valve through out apt , and bleed radiators thru- out. Restore heat to entire 3rd floor apt. Date: January 27, 2011 Permit type: Heat | Permit id: Eb21045 | |||||
Remove all garbage approximately 1 cubic yard in court yard. Sanitize floor of court yard. Note:contractor must contact h. P. D. @ 718 254-8907 wi Date: July 2, 2002 Permit type: Gc | Permit id: E222997 | |||||
Con ed provide electric to building public areas and heating plant hot water heater. Date: October 20, 2014 Permit type: Util | Permit id: Ef08841 | |||||
At bldg public hall: perform direct replacement of defective lighting fixtures with new fluorescent type total of ( 3 ) (1) on each floor and perform Date: December 30, 2010 Permit type: Elec | Permit id: Eb17952 | |||||
Apt#1: @ (basement) accumulation of raw sewage in the basement: pump out all water and sewage from basement. Vacuum dry and sanitize throughout the ba Date: October 9, 2012 Permit type: Stopag | Permit id: Ed07812 | |||||
P a.: clear all stoppage in rear court yard. Clear out sewer line trap to street. Contractor is to contact lydia santos @ (718) 254-89 or cor Date: July 1, 2002 Permit type: Stopag | Permit id: E222475 | |||||
Bldg @ (cellar basement): replace broken defective stairs. Replace with new metal stairs or similar material. From lobby entrace to cellar (bas Date: May 20, 2014 Permit type: Gc | Permit id: Ee23008 | |||||
Cellar >>>>>> replace with new the broken or defective wooden staircase at cellar. Remove all work related debris. Note: contractor must Date: April 18, 2014 Permit type: Gc | Permit id: Ee21405 | |||||
<<< public hall >>> # 1 <<< bulkhead >>> trace and repair the water leak over ceiling at bulkhead. Including cut out all air pockets and provide Date: October 15, 2014 Permit type: Gc | Permit id: Ef08076 | |||||
Clear stoppage and pump out all sewage and stagnant water in basement; vacuum dry, broom sweep and sanitize accordingly. Provide and install new sub Date: May 20, 2011 Permit type: Plumb | Permit id: Eb31346 | |||||
Snake out sewer line from house trap to street and back to clear all stoppage and sanitize with lime. Note: contractor must contact hpd at 718 636- Date: February 2, 2003 Permit type: Stopag | Permit id: E314723 | |||||
<<< public hall >>> do all necessary to properly repair and abate unsafe electrical wiring condition. Upon completion remove the extension cords t Date: October 15, 2014 Permit type: Elec | Permit id: Ef08075 | |||||
Replace defective no hub coupling on soil stack line in basement also install 2 no hub cap on existing stack not being used. Note: contractor mus Date: May 21, 2001 Permit type: Plumb | Permit id: E122178 | |||||
At cellar : replace with new defective gallon - gas fired water heater complete with breeching restore hot water to entire building. Remove al Date: November 18, 2014 Permit type: Heat | Permit id: Ef09932 | |||||
Locate and repair leak. Frame out ceiling. Sheet rock, tape and compound ceiling complete. Remove l bend from walls. Remove and install new light Date: July 9, 2001 Permit type: Gc | Permit id: E125653 | |||||
At cellar : trace and repair the water leak(s) at the ceiling in the cellar. Clear stoppage: clear the main sewer house trap from trap to street and Date: November 18, 2014 Permit type: Stopag | Permit id: Ef09926 | |||||
<<< apt # 2 >>>> trace and repair leaks from above. #1 <<<< 2nd room from north >>> replace the broken section of ceiling with s r. Approx 16 Date: December 4, 2014 Permit type: Gc | Permit id: Ef10345 | |||||
Keyspan provide gas to boiler hot water heater Date: May 4, 2001 Permit type: Util | Permit id: E121977 | |||||
At cellar : pump out stagnant water and sewage from basement: clear main sewer house trap from trap to street and from house trap into building. Pump Date: February 24, 2014 Permit type: Stopag | Permit id: Ee17870 | |||||
Apt#1: @ (basement) accumulation of raw sewage in the basement: pump out all water and sewage from basement. Vacuum dry and sanitize throughout the ba Date: April 4, 2014 Permit type: Stopag | Permit id: Ee20725 | |||||
Apt#: 2 . Make all necessary repairs to stop all leak(s)to the frozen water lines throughout basement and apartments. Cap off lines at vacant apartmen Date: March 26, 2014 Permit type: Plumb | Permit id: Ee20196 | |||||
Supply and install new 75 gallon gas hot water heater. Restore hot water to p. W. O. Obtain all necessary permits. Note: contractor must cont Permit type: Heat | Permit id: Eb22451 | |||||
At cellar: repair gas fired boiler, repair replace necessary parts to restore system to proper working conditions, restore adequate heat supply to Date: February 16, 2011 Permit type: Heat | Permit id: Eb22132 | |||||
At bldg rear facade: rake and point all brick masonary joints approx. 5 sqft. Make necessary repairs to stop water from penetrating into bldg, inc Date: June 10, 2011 Permit type: Gc | Permit id: Eb32907 | |||||
Supply and install new 75 gallon gas hot water heater. Restore hot water to p. W. O. Obtain all necessary permits. Note: contractor must cont Permit type: Heat | Permit id: Eb22451 | |||||
Nationalgrid provide gas to boiler hot water heater Date: October 18, 2011 Permit type: Util | Permit id: Ec10382 | |||||
At building: supply and install a new gallons a. O. Smith gas fired hot water heater complete including flue piping. Remove work related debris. Wo Date: May 24, 2011 Permit type: Heat | Permit id: Eb32213 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2012 Permit type: Util | Permit id: Ed00230 | |||||
Provide single fuel drop to the above address with prime and start. #2 fuel- fill 275 gl tank, please report problems immediately to the esb fuel unit Date: January 10, 2012 Permit type: Util | Permit id: Ec17515 | |||||
At 1st floor apt bedroom# es1: demo loose and water damaged plaster at ceiling & walls near window area approx. 1 sqft. Trace and repair sources Date: October 6, 2011 Permit type: Gc | Permit id: Ec08372 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee01921 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2014 Permit type: Util | Permit id: Ef03060 | |||||
Basement: make all necessary repairs to gas fired boiler. Restore to proper working condition. Restore heat to entire building. Remove all work rela Permit type: Heat | Permit id: Eb22177 | |||||
Basement: make all necessary repairs to gas hot water heater. Restore to proper working condition. Restore hot water to the entire building. Remove Date: January 28, 2011 Permit type: Plumb | Permit id: Eb20877 | |||||
Cellar bsmnt heat related work pump out all standing accumilated water sanitized and leave bsmnt floor clean and accessible. Trace and repair Date: February 3, 2011 Permit type: Stopag | Permit id: Eb21780 | |||||
Basement: make all necessary repairs to gas fired boiler. Restore to proper working condition. Restore heat to entire building. Remove all work rela Permit type: Heat | Permit id: Eb22177 | |||||
At bldg rear: re-caulk around all window openings approx ( 9) windows, also replace defective 6 gutter & 4 leader pipe approx. Lft total, ma Date: May 20, 2011 Permit type: Gc | Permit id: Eb31508 | |||||
At building: at first floor apt repair all leaks in the bathroom ceiling coming from above possible from the roof repair if necessary with similar ma Date: April 18, 2011 Permit type: Gc | Permit id: Eb27973 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat to building. Note: contractor must contact hpd at Date: February 6, 2003 Permit type: Heat | Permit id: E314717 |