Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Remove and install poles and equipment in advance of ddot road improvement project. Central pl north of capitol ave ne, as indicated on the attached prints. Wr#3422843 altemburger/robinson Date: February 3, 2015 Client: Pepco | Permit type: Over head work; pole | Permit id: Pa105560 | |||||
SCORE 89 Install (6) water service and sewer services at 1824-18 and 1831 -1833 central pl. Ne . Date: December 14, 2016 Contractor: Ace Utilities L.L.C Permit type: Excavation; sewer lateral connection to 4" (trench), excavation; water lateral connection to 2" (trench), excavation; clean out (sewer), excavation; water meter pit (to 2" pipe) | Permit status: Assigned | Expiration date: February 24, 2017 | |||||
SCORE 86 Funeral service Date: February 23, 2011 Permit status: Expired | Expiration date: February 26, 2011 | Permit id: Pa10021459 | |||||
SCORE 98 Funeral service Contractor: Ronald Taylor Permit status: Notpaid | Expiration date: February 21, 2013 | Permit id: 0 | |||||
SCORE 98 Funeral service Contractor: Ronald Taylor Permit status: Not paid | Expiration date: February 21, 2013 | Permit id: 0 | |||||
SCORE 95 Remove and install poles and equipment in advance of ddot road improvement project. Central pl north of capitol ave ne, as indicated on the attached prints. Wr#3422843 altemburger/robinson Date: February 3, 2015 Contractor: Pepco Permit type: Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one) | Permit status: Permit expired | Expiration date: September 4, 2015 | Permit id: Pa105560 | |||||
SCORE 98 Funeral service Contractor: Ronald Taylor Permit status: Notpaid | Expiration date: February 21, 2013 | Permit id: 0 | |||||
SCORE 95 Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one) Date: February 13, 2015 Contractor: Pepco Permit status: Permit expired | Expiration date: September 4, 2015 | Permit id: Pa105560 | |||||
SCORE 89 Excavation; sewer lateral connection to 4" (trench), excavation; water lateral connection to 2" (trench), excavation; clean out (sewer), excavation; water meter pit (to 2" pipe) Date: February 14, 2017 Contractor: Ace Utilities L.L.C Permit status: Permit expired | Expiration date: April 15, 2017 | Permit id: Pa188005 | |||||
SCORE 98 Funeral service Contractor: Ronald Taylor Permit status: Not paid | Expiration date: February 21, 2013 | Permit id: 0 | |||||
SCORE 89 Construction staging area Date: March 7, 2017 Contractor: Ace Utilities L.L.C Permit status: Permit expired | Expiration date: April 5, 2017 | Permit id: Pa10379640 | |||||
Dccr project proposes to perform a (mor-cpt 02) seismic cone penetrometer tests to determine the geotechnical engineering properties of soils and to delineate soil stratigraphy. Seismic cone penetrometer tests do not generate any investigation derived waste (i. E., drill cuttings, water, etc.) the boring will be feet deep. The work will occur in the intersection of mt olivet rd and west virginia ave ne. The work time to complete the test will be approximately 3 days and will be restricted to 7am to 5pm. The work zone will be removed at the end of each day Date: July 3, 2014 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: January 7, 2015 | |||||
SCORE 100 Dccr project proposes to perform a (mor-cpt 02) seismic cone penetrometer tests to determine the geotechnical engineering properties of soils and to delineate soil stratigraphy. Seismic cone penetrometer tests do not generate any investigation derived waste (i. E., drill cuttings, water, etc.) the boring will be feet deep. The work will occur in the intersection of mt olivet rd and west virginia ave ne. The work time to complete the test will be approximately 3 days and will be restricted to 7am to 5pm. The work zone will be removed at the end of each day Date: July 3, 2014 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: January 7, 2015 | |||||
SCORE 100 Excavation; boring test pit (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: January 7, 2015 | Permit id: 0 | |||||
SCORE 100 Dccr project proposes to perform a (mor-cpt 02) seismic cone penetrometer tests to determine the geotechnical engineering properties of soils and to delineate soil stratigraphy. Seismic cone penetrometer tests do not generate any investigation derived waste (i. E., drill cuttings, water, etc.) the boring will be feet deep. The work will occur in the intersection of mt olivet rd and west virginia ave ne. The work time to complete the test will be approximately 3 days and will be restricted to 7am to 5pm. The work zone will be removed at the end of each day Contractor: E2cr Inc Permit status: Cancel/withdrawn | Expiration date: January 7, 2015 | Permit id: 0 | |||||
SCORE 100 Excavation; boring test pit (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: January 7, 2015 | Permit id: 0 | |||||
SCORE 100 Dccr project proposes to perform a (mor-cpt 02) seismic cone penetrometer tests to determine the geotechnical engineering properties of soils and to delineate soil stratigraphy. Seismic cone penetrometer tests do not generate any investigation derived waste (i. E., drill cuttings, water, etc.) the boring will be feet deep. The work will occur in the intersection of mt olivet rd and west virginia ave ne. The work time to complete the test will be approximately 3 days and will be restricted to 7am to 5pm. The work zone will be removed at the end of each day Contractor: E2cr Inc Permit status: Cancel/withdrawn | Expiration date: January 7, 2015 | Permit id: 0 |