Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Removal of all roofing and non-roofing materials from roof at 181 bowdoin st including debris old roofing materials. Roof shall be completely stripped down and replaced. Client: Community Development Corp Of Boston | Permit type: Roofing | Permit status: Expired | Current use: Comm | Permit id: Sf435253 | Parcel: 1500999000 | |||||
SCORE 93 Change;occupancy from manufacturing of signs garage and offices to beer production. The primary use will be to manufacture package and warehouse craft beer. The facility also intends to offer tours of the brewing facility to the general public tasting of the beers produced within the facility delivery of beer from the facility warehousing of beer within the facility and retail of various merchandise (hats t-shirts mugs). Beer will also be sold at retail from within the premises.;beer and food will also be sold for consumption on site.;management offices will be contained in the facility.;a publicly accessible roof-top deck will be added to the existing roof Date: June 9, 2015 Contractor: Kevin Deabler Permit type: Boa zoning | Permit status: Open | Current use: Comm | Permit id: Boa432662 | Parcel: 1500999000 | |||||
SCORE 96 Install replacement doors and windows in existing masonry openings remove two rollup doors install two new entry doors. Block up three rear windows. Repair existing internal stair railings as needed. Painting as needed. Client: Community Development Corp Of Boston | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Sf551753 | Parcel: 1500999000 |