Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 11, 2014 Contractor: Daniel Sullivan Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: December 15, 2014 | Permit id: Pds2014-Resalt- | |||||
Existing residential main electrical service upgrade - 2 amps - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: December 11, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 15, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 3, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 15, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 11, 2014 Contractor: Sullivan Solar Power Of California Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 15, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd and new 150a electrial panel upgrade. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 03-28-2017 scope change to match the plans and include misc. Elec. Maz Date: January 27, 2017 Contractor: Sullivan Solar Power Of California Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 3, 2017 | Permit id: Pds2017-Resalt- | |||||
Rough electric Date: March 28, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: December 11, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |