Building Permits at 18 Alpine Av Boulder CO


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 18 Alpine Av Boulder CO over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
72
Partial tear-off & overlay, 22 squares flat roof w mil epdm.
Date:  July 26, 2006

Client: A Schultz,Gerhard W | Applicant: Aaa Roofing Co., Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: December 28, 2006 | Current use: Multifamily dwe
2006/07/2607218 Alpine Av Boulder CoAaa Roofing Co. Inc
SCORE
88
Tap water main at three locations for 2" firelines. (1860, 1840, 18 alpine st)
Date:  April 29, 2005

Client: Health Mental | Applicant: Thompson Valley Excavation | Permit type: Right-of-way, flood | Permit status: Iss
2005/04/2908818 Alpine Av Boulder CoThompson Valley Excavation
SCORE
100
Fire sprinkler system
Date:  April 14, 2005
Contractor: Fire Defense Inc

Client: Health Mental | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Multifamily dwe
2005/04/14010018 Alpine Av Boulder CoFire Defense Inc
SCORE
95
Fire alarm system
Date:  March 31, 2005
Contractor: Surelock Plus Llc

Client: Health Mental | Applicant: Surelock Plus, Llc | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/instit
2005/03/3109518 Alpine Av Boulder CoSurelock Plus Llc
SCORE
95
Fire sprinkle system
Date:  March 31, 2005
Contractor: Surelock Plus Llc

Client: Health Mental | Applicant: Surelock Plus, Llc | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/instit
2005/03/3109518 Alpine Av Boulder CoSurelock Plus Llc
SCORE
95
Fire alarm system
Date:  March 31, 2005
Contractor: Surelock Plus Llc

Client: Health Mental | Applicant: Surelock Plus, Llc | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/instit
2005/03/3109518 Alpine Av Boulder CoSurelock Plus Llc
SCORE
100
Replacement forced air furnace
Date:  October 9, 2003

Client: Health Mental | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe
2003/10/09010018 Alpine Av Boulder CoSave Home Heat Co. Inc
SCORE
100
Replacement of 3 forced air furnace units
Date:  October 9, 2003

Client: Health Mental | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe
2003/10/09010018 Alpine Av Boulder CoSave Home Heat Co. Inc
SCORE
67
Fire damage repair in entry and unit #1, repair replacement includes insulation, drywall, door slabs, floor covering, glass
Date:  February 5, 2003
Value:   $12,732

Client: Health Mental | Applicant: Paul Davis Restor/front Range | Permit type: Building | Permit status: Cmp | Completion date: March 11, 2003 | Current use: Single family a
2003/02/05127326718 Alpine Av Boulder CoPaul Davis Restor Front Range
SCORE
100
Enlargement of an existing basement window opening (header will not be affected) to accommodate a new egress window in unit #1.
Date:  July 24, 2002
Value:   $1,000

Client: Itallie Van,Kristin Solomon | Applicant: Ellis Construction Company | Permit type: Building | Permit status: Cmp | Current use: Multifamily dwe
2002/07/24100010018 Alpine Av Boulder CoEllis Construction Company
SCORE
96
Replace water heater in a single family deached residence.
Date:  June 12, 2001

Client: Alpine 1800.0 | Applicant: Bernies Plumbing And Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: June 15, 2001 | Current use: Single family d
2001/06/1209618 Alpine Av Boulder CoBernies Plumbing And Heating
SCORE
100
Re-roof
Date:  May 1, 2000

Client: Itallie Van | Applicant: A A A Roofing & Insulation | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwe
2000/05/01010018 Alpine Av Boulder CoA A A Roofing And Insulation
SCORE
64
Forced air furnance.
Date:  January 11, 2000
Contractor: Health Mental

Client: Health Mental,Kathryn Pinson | Applicant: Health Mental | Permit type: Mechanical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Medical and den
2000/01/1106418 Alpine Av Boulder CoHealth Mental
SCORE
95
Tear-off & reroof of multifamily apartment building -- epdm over densedeck or equivalent, installation of taperfoam insulation. 16 squares. Flat roof pre-inspection required, mid-roof inspection required.
Date:  November 13, 2009
Contractor: Grabau Roofing Inc

Client: Health Mental | Applicant: Grabau Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Multifamily dwe
2009/11/1309518 Alpine Av Boulder CoGrabau Roofing Inc
SCORE
100
Bore 100foot along alpine to place cable
Date:  August 4, 2010
Contractor: Comcast

Client: Deane Johnson | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss
2010/08/04010018 Alpine Av Boulder CoComcast
SCORE
100
Total tear off and reroof of existing structure. Epdm over dens deck, 16 square, flat roof.
Date:  August 13, 2010

Client: Health Mental | Applicant: Boulder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Existing
2010/08/13010018 Alpine Av Boulder CoBoulder Roofing Inc
SCORE
100
Tear-off & reroof of a multifamily building -- 18 squares epdm over densedeck. Positive drainage required. Mid-roof inspection required.
Date:  March 21, 2011

Client: Health Mental | Applicant: Boulder Roofing, Inc | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe
2011/03/21010018 Alpine Av Boulder CoBoulder Roofing Inc
SCORE
56
Repairs to an existing interlocking block wall in the rear yard. See engineerfoots letter and cpl2011-01617 for additional details.
Date:  November 4, 2011
Contractor: Alpine 1810.0

Client: Alpine 1810.0 | Applicant: Alpine 1810.0 | Permit type: Flood fence flood pe | Permit status: Cmp | Completion date: August 16, 2012 | Current use: Single family d
2011/11/0405618 Alpine Av Boulder CoAlpine 1810.0
SCORE
56
After-the-fact permit for a retaining wall in rear yard next to a 4-plex structure.
Date:  November 8, 2011
Contractor: Alpine 1800.0

Client: Alpine 1800.0 | Applicant: Alpine 1800.0 | Permit type: Fence | Permit status: Cmp | Completion date: November 14, 2011 | Current use: Multifamily dwe
2011/11/0805618 Alpine Av Boulder CoAlpine 1800.0
SCORE
95
Tennant finish fire alarm changing unit from regular notification to ada notification
Date:  February 27, 2012
Contractor: Surelock Plus Llc

Client: Health Mental | Applicant: Surelock Plus, Llc | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe
2012/02/2709518 Alpine Av Boulder CoSurelock Plus Llc
SCORE
96
Remove existing shingles on detached garage and re-roof with dimensional shingles. 11 squares, roof pitch represented by contractor to be 4:12.
Date:  October 28, 2013
Contractor: J M Jacobs Inc

Client: Deane Johnson | Applicant: J M Jacobs Inc | Permit type: Roofing | Permit status: Cmp | Completion date: November 12, 2013 | Current use: Single family d
2013/10/2809618 Alpine Av Boulder CoJ M Jacobs Inc
SCORE
64
Permit for slope stabilization and erosion control with trench drains and armormax anchor reinforced vegetation system on slope of rear yards on properties between alpine ave. And sunset blvd.
Date:  June 10, 2015
Contractor: Health Mental

Client: Health Mental | Applicant: Health Mental | Permit type: Sitework | Permit status: Iss | Current use: Multifamily dwe
2015/06/1006418 Alpine Av Boulder CoHealth Mental
SCORE
95
Tear-off & reroof of multifamily apartment building -- epdm over densedeck or equivalent, installation of taperfoam insulation. 16 squares. Flat roof pre-inspection required, mid-roof inspection required.
Date:  November 16, 2009
Value:   $13,000
Contractor: Grabau Roofing Inc

Client: Health Mental | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-04669
2009/11/16130009518 Alpine Av Boulder CoGrabau Roofing Inc
SCORE
96
Remove existing shingles on detached garage and re-roof with dimensional shingles. 11 squares, roof pitch represented by contractor to be 4:12.
Date:  October 28, 2013
Value:   $2,875
Contractor: J M Jacobs Inc

Client: Deane Johnson | Permit type: Roofing | Permit status: Cmp | Completion date: November 12, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05961
2013/10/2828759618 Alpine Av Boulder CoJ M Jacobs Inc
SCORE
96
Replace water heater in a single family deached residence.
Date:  June 13, 2001
Value:   $458

Client: Alpine | Permit type: Mechanical | Permit status: Cmp | Completion date: June 15, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02462
2001/06/134589618 Alpine Av Boulder CoBernies Plumbing And Heating
SCORE
95
Tennant finish fire alarm changing unit from regular notification to ada notification
Date:  February 28, 2012
Value:   $1,096
Contractor: Surelock Plus, Llc

Client: Health Mental | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00717
2012/02/2810969518 Alpine Av Boulder CoSurelock Plus, Llc
SCORE
95
Fire sprinkle system
Date:  April 1, 2005
Value:   $964
Contractor: Surelock Plus, Llc

Client: Health Mental | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01108
2005/04/019649518 Alpine Av Boulder CoSurelock Plus, Llc
SCORE
95
Fire alarm system
Date:  April 1, 2005
Value:   $964
Contractor: Surelock Plus, Llc

Client: Health Mental | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01110
2005/04/019649518 Alpine Av Boulder CoSurelock Plus, Llc
Bore 100foot along alpine to place cable
Date:  August 4, 2010

Client: Deane Johnson | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-03135
2010/08/0409518 Alpine Av Boulder Co
SCORE
95
Total tear off and reroof of existing structure. Epdm over dens deck, 16 square, flat roof.
Date:  August 16, 2010
Value:   $4,435

Client: Health Mental | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Existing | Permit id: Pmt2010-03423
2010/08/1644359518 Alpine Av Boulder CoBoulder Roofing, Inc
SCORE
67
Fire damage repair in entry and unit #1, repair replacement includes insulation, drywall, door slabs, floor covering, glass
Date:  February 5, 2003
Value:   $12

Client: Health Mental | Permit type: Building | Permit status: Cmp | Completion date: March 11, 2003 | Current use: Single family attached dwelling, repair | Permit id: Pmt2003-00438
2003/02/05126718 Alpine Av Boulder CoPaul Davis Restor Front Range
SCORE
100
Enlargement of an existing basement window opening (header will not be affected) to accommodate a new egress window in unit #1.
Date:  July 24, 2002
Value:   $1

Client: Itallie Van | Permit type: Building | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2002-03173
2002/07/24110018 Alpine Av Boulder CoEllis Construction Company
SCORE
95
Tear-off & reroof of a multifamily building -- 18 squares epdm over densedeck. Positive drainage required. Mid-roof inspection required.
Date:  March 21, 2011
Value:   $5,980

Client: Health Mental | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-01091
2011/03/2159809518 Alpine Av Boulder CoBoulder Roofing, Inc
Repairs to an existing interlocking block wall in the rear yard. See engineerfoots letter and cpl2011-01617 for additional details.
Date:  August 14, 2012
Value:   $875

Client: Alpine | Permit type: Flood fence flood permit, fence | Permit status: Cmp | Completion date: August 16, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04643
2012/08/148759518 Alpine Av Boulder Co
After-the-fact permit for a retaining wall in rear yard next to a 4-plex structure.
Date:  November 9, 2011
Value:   $3,000

Client: Alpine | Permit type: Fence | Permit status: Cmp | Completion date: November 14, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04826
2011/11/0930009518 Alpine Av Boulder Co
SCORE
56
Permit for slope stabilization and erosion control with trench drains and armormax anchor reinforced vegetation system on slope of rear yards on properties between alpine ave. And sunset blvd.
Date:  July 1, 2015
Value:   $368,837
Contractor: Rathman

Client: Health Mental | Permit type: Sitework | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01384
2015/07/013688375618 Alpine Av Boulder CoRathman
SCORE
99
Forced air furnance.
Date:  January 11, 2000
Value:   $1,400

Client: Health Mental | Permit type: Mechanical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Medical and dental clinics, existing | Permit id: Pmt2000-00257
2000/01/1114009918 Alpine Av Boulder CoAtek Heating And Air Cond Inc
SCORE
100
Re-roof
Date:  May 1, 2000
Value:   $3,000

Client: Itallie Van | Permit type: Roofing | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-01750
2000/05/01300010018 Alpine Av Boulder CoA A A Roofing And Insulation
SCORE
100
Replacement of 3 forced air furnace units
Date:  October 9, 2003
Value:   $4,300

Client: Health Mental | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-20094
2003/10/09430010018 Alpine Av Boulder CoSave Home Heat Co., Inc
SCORE
100
Replacement forced air furnace
Date:  October 9, 2003
Value:   $4,300

Client: Health Mental | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-20095
2003/10/09430010018 Alpine Av Boulder CoSave Home Heat Co., Inc
SCORE
95
Fire alarm system
Date:  April 1, 2005
Value:   $1,085
Contractor: Surelock Plus, Llc

Client: Health Mental | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01109
2005/04/0110859518 Alpine Av Boulder CoSurelock Plus, Llc
SCORE
95
Fire sprinkler system
Date:  April 18, 2005
Value:   $4,133
Contractor: Fire Defense, Inc

Client: Health Mental | Permit type: Fire | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2005-01323
2005/04/1841339518 Alpine Av Boulder CoFire Defense, Inc
SCORE
88
Tap water main at three locations for 2inch firelines. (1860, 1840, 18 alpine st)
Date:  April 29, 2005

Client: Health Mental | Permit type: Right-of-way, flood fence flood permit | Permit status: Iss | Permit id: Pmt2005-01486
2005/04/2908818 Alpine Av Boulder CoThompson Valley Excavation
SCORE
72
Partial tear-off & overlay, 22 squares flat roof w mil epdm.
Date:  July 28, 2006
Value:   $7,000

Client: A Schultz | Permit type: Roofing | Permit status: Cmp | Completion date: December 28, 2006 | Current use: Multifamily dwellings, existing | Permit id: Pmt2006-03005
2006/07/2870007218 Alpine Av Boulder CoAaa Roofing Co., Inc
SCORE
95
Sewer service repair house to tap in street, applicant advised: this street is a newer overlay and special asphalt restoration requirements will apply
Date:  November 1, 2017

Client: Health Mental | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2017-04783
2017/11/0109518 Alpine Av Boulder CoPlumbline Services, Inc
SCORE
95
Roofing permit for overlay only (condos at 18 alpine, units 1-4), gaf, 19 squares, flat roof . 25 per ft.
Date:  July 20, 2005

Client: Hospital Community | Applicant: C J Roofing Company | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Multifamily dwe
2005/07/2009518 Alpine Boulder CoC J Roofing Company
SCORE
95
Roofing permit for overlay only (condos at 18 alpine, units 1-4), gaf, 19 squares, flat roof . 25 per ft.
Date:  July 20, 2005
Value:   $7,250

Client: Hospital Community | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2005-02836
2005/07/2072509518 Alpine Boulder CoC J Roofing Company
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos