Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Remove and replace historic windows in front of the building. Remove and replace windows in the rear of the building. ![]() Client: Middle East Institute | Applicant: Melvin Crenshaw Landis Construction Corp. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1404583 | |||||
SCORE 80 Replace 3 exterior doors ![]() ![]() Client: Middle East Institute Middle East Institute | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511429 | |||||
SCORE 89 Remove and replace historic windows in front of the building. Remove and replace windows in the rear of the building. ![]() ![]() Client: Middle East Institute | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1404583 | |||||
SCORE 56 Reconfiguration of the entry level on 2nd floor of an existing small office building. Replacement of mechanical systems at 2nd floor 2nd floor work is alteration level 2 all other work is alteration level 1 or repair with the exception of mechanical work ![]() ![]() Client: Middle East Institute Middle East Institute | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1600502 | |||||
SCORE 56 Replace 3 exterior doors ![]() ![]() Client: Middle East Institute Middle East Institute | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511429 | |||||
SCORE 56 Demo & remove existing brick wall and footers. Install temporary chain link fence in same location. ![]() ![]() Client: Middle East Institute | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1613493 | |||||
SCORE 56 We will perform a total of 1 boring on the proposed site. The boring will be advanced to a depth of feet below the existing site grades. The boring will be located within the bounds of private property. The boring will be drilled utilizing 3. 25-inch hollow-stem, continuous flight augers. The boring will be performed utilizing a truck-mounted drill rig and will generate an approximate 6-inch annulus. After drilling is complete the boring will be backfilled in accordance with doee requirements with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. ![]() Client: Middle East Institute | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600364 |