Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electrical vehicle charging station(s) for existing sfd Date: November 8, 2012 Contractor: Baker Electric Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 678-664-26-00 | |||||
SCORE 95 Master plan for map 152 (tm5229-3)- phase 3, 11 production units lots 887-892, 910-914 for pulte homes "the pines" green building model #3sp, lot #911 3262 sq ft 2 story sfd w ac, fs 7 sq ft attached fin fs garage porch 82 sq ft (sp) Permit type: Tract models or prod | Permit status: Completed | Permit id: Pds2011-1015-20 | Parcel: 678-664-26-00 | |||||
SCORE 96 Electrical vehicle charging station(s) for existing sfd Date: November 8, 2012 Contractor: Baker Electric, Inc Permit type: Electrical vehicle charging station(s) | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 6786642600 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 18, 2013 Contractor: N B Baker Electric Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2013-Resalt- | Parcel: 678-664-26-00 |