Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Ez permit standard alterations. For alterations to an existing one family dwelling as per theattached standard. Deviations from the standard will result in permit revocation. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to starting work. Date: March 15, 2017 Contractor: Sab Construction And Management Client: Philadelphia Lotus Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 766605 | |||||
SCORE 82 100amp service complete with panle, meter and grounding, rewire switches, recepts, lights, smokes co detectors as per 2008 nec (north district) Date: April 6, 2017 Contractor: Terox Electric And Construction Client: Philadelphia Lotus Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 773170 | |||||
SCORE 100 Water and drains for 2 wc,2 lavs,1 tub,1 kitchen sink and 1 washer (sfd)the installation shall comply with the philadelphia plumbing code, 2004 Date: April 7, 2017 Contractor: Shegda Construction Corp Client: Philadelphia Lotus Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 773587 | |||||
SCORE 100 Install (1) gas furnace with ductwork. (sfd) Date: April 27, 2017 Contractor: Above And Below Heating And Air Client: Philadelphia Lotus Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 778739 |