Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: August 8, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 481526 | |||||
Zoning/use permit Date: May 6, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 466384 | |||||
Electrical permit Date: August 15, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Expired | Permit id: 487787 | |||||
Alteration permit Date: May 6, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Expired | Permit id: 446634 | |||||
Operations permit Date: June 24, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 22417 | |||||
Zoning use permit Date: May 6, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 466384 | |||||
Alteration permit Date: August 7, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 481521 | |||||
Operations permit Date: June 24, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 22417 | |||||
Electrical permit Date: May 17, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Expired | Permit id: 433351 | |||||
Plumbing permit Date: August 8, 2013 Client: Murray Joe Tr Lee Robert Tr Etal | Permit status: Completed | Permit id: 481526 | |||||
SCORE 99 For the demolition of existing porch and the construction of new framed entrance way addition on an existing one (1) story structure with new foundation and porch. Iebc 2009, compliance method--addition. Separate electrical permit to be required. Date: May 6, 2013 Contractor: Tylers Custom Building Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Alteration permit | Permit status: Expired | Completion date: September 8, 2014 | Permit id: 446634 | |||||
SCORE 100 09 14 2013 erect assembly tent(30x45) jehovahs witness center Date: June 24, 2013 Contractor: Knight Enterprises Inc Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Operations permit | Permit status: Completed | Permit id: 22417 | |||||
SCORE 99 Replace and or install approx 45 interior light fixtures replace and or install approx 16 exterior light fixtures replace 15 receptacles and 6 switches, install 1 4800w heater as per 2008 nec. Date: May 17, 2013 Contractor: Charles Jones Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Electrical permit | Permit status: Expired | Completion date: May 17, 2013 | Permit id: 433351 | |||||
SCORE 99 Level i minor alterations to remove and replace molded wood studs (non load bearing) in existing auditorium. No modifications to existing area (3 sq ft) replace with metal studs and sheet rock Date: July 22, 2013 Contractor: Tylers Custom Building Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Alteration permit | Permit status: Expired | Completion date: September 8, 2014 | Permit id: 484475 | |||||
SCORE 99 Provide and install cctc system,parking lot pole light and landscape lighting and fire alarm per 2008 nec & nfpa 72 (house of worship) Date: August 15, 2013 Contractor: Charles Jones Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Electrical permit | Permit status: Expired | Completion date: August 15, 2013 | Permit id: 487787 | |||||
SCORE 99 Demo and remodel existing bathrooms,upgrade to accessible bathrooms. Pre code use and occupancy. Co attached as a matter of record only for certifying. Additional permits req: electrical, plumbing. Date: August 7, 2013 Contractor: Tylers Custom Building Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Alteration permit | Permit status: Completed | Completion date: July 15, 2015 | Permit id: 481521 | |||||
SCORE 100 Install water lines and drains for 2 bathrooms including 3 toilets,2 lavs,and 1 water cooler+ 1 urinal(religious assembly) Date: August 8, 2013 Contractor: Wayne Williams Jr Client: Murray Joe Tr Lee Robert Tr Etal | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 24, 2015 | Permit id: 481526 |