Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior, non-structural demolition of a townhouse. For structural investigation after fire. Date: August 30, 2016 Client: Pine | Permit type: Demolition | Permit status: Iss | Current use: Townhomes, existing | Permit id: Pmt2016-04072 | |||||
SCORE 99 Place dumpster or dump trailer equipment on street at random intervals, associated with case pmt2016-04072 Date: September 1, 2016 Contractor: Jim Black Construction, Inc Client: Pine | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-04108 | |||||
SCORE 95 Reconstruction of a total-loss fire damaged, 3-story + basement, 1834 sq. Ft., townhome unit on the existing foundation. No increase to square footage or bedroom count. Reconfiguration of floor level to eliminate split-level design. Scope includes the reconstruction of a 42 sq. Ft. Deck on level 3 and a 16 sq. Ft. Front porch on level 1. Associated mepfoots covedred within the scope of this permit. Reference pmt2016-04072 - demo of a total-loss fire damaged townhome unit. Reference lur2017-00005, inchholdinch status, no proposed increase in floor area. Client: Pine | Permit type: Building, electrical, mechanical, plumbing | Permit status: Act | Current use: Townhomes, repair, deck, repair | Permit id: Pmt2017-02058 | |||||
SCORE 95 Place dumpster in street Date: June 14, 2017 Contractor: Bioterra Constructors Inc Client: Pine | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-02540 |