Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Apt(1) skylight p/h replace with new the missing wire mash glass at the skylight to roof in the p/h . Disclaimer remove all work related debris. Date: November 10, 2011 Permit type: Gc | Permit id: Ec11806 | |||||
SCORE 100 Equipment work Date: August 6, 2015 Contractor: Mega Fire Protection Inc Permit status: Permit issued | Permit id: 42083277201 | |||||
SCORE 100 Equipment work Date: August 6, 2015 Contractor: Mega Fire Protection Inc Permit status: Permit issued | Permit id: 42083277201 | |||||
Apt(1) skylight p h replace with new the missing wire mash glass at the skylight to roof in the p h . Disclaimer remove all work related debris. Date: November 10, 2011 Permit type: Gc | Permit id: Ec11806 | |||||
At 172-04 linden blvd contact - (646)-530-5522 at 2nd floor at apt 2r replace repair damaged lock and assembly at the entrance door, return loc Date: April 19, 2017 Value: $339 Permit type: Gc | Permit id: Eh15786 | |||||
At 172-04 linden blvd contact - (646)-530-5522 at 2nd floor at apt 2r bathroom and public hallway trace and repair all concealed leak(s): trace, Date: April 21, 2017 Permit type: Gc | Permit id: Eh15542 |