Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Equipment work Date: December 15, 1993 Contractor: Columbia Utilities Heating Permit status: Permit issued | Permit id: 30031419401 | |||||
SCORE 98 Equipment work Date: April 4, 1996 Contractor: A And C Combustion Services Permit status: Permit issued | Permit id: 30050747701 | |||||
Public area: reinstall three (3) window guards all stories in public hall. Date: February 8, 2006 Value: $203 Permit type: Gc | Permit id: E624265 | |||||
Public hall. Install stops at 1 1/2 to 3 1/2 story public hall windows. Date: January 28, 2006 Value: $76 Permit type: Gc | Permit id: E622809 | |||||
Local law #1 violation : as per rc #. And attached scope of work thoroughly remove all lead violations as per new york city administrative code 2 Date: February 18, 2005 Permit type: Delead | Permit id: E522210 | |||||
Public hall. 1 1/2 fl, install (1) window guard and stops complete. 2 1/2 fl, install (1) window guard and stops complete. 3 1/2 fl, install (1) wi Date: January 30, 2005 Value: $41 Permit type: Gc | Permit id: E520027 | |||||
Public hall. 1 1 2 fl, install (1) window guard and stops complete. 2 1 2 fl, install (1) window guard and stops complete. 3 1 2 fl, install (1) wi Date: January 30, 2005 Value: $41 Permit type: Gc | Permit id: E520027 | |||||
Public hall. Install stops at 1 1 2 to 3 1 2 story public hall windows. Date: January 28, 2006 Value: $76 Permit type: Gc | Permit id: E622809 | |||||
Apartment #3b: abate leak at hallway ceiling and bedroom ceiling and repair ceilings (20sq. Ft.). Paint to cover s. W. P no children under 7 years old i Date: April 5, 2006 Permit type: Gc | Permit id: E629250 | |||||
At apt# d1: repair the broken / defective plastered ceiling at the private hall in the apt. Plaster patch aprox sqft. Of ceiling damaged as a resu Date: November 14, 2011 Permit type: Gc | Permit id: Ec12288 | |||||
At roof above apt# d1 entrance hallway near bulkhead and roof drain area install approx. 2 sqft of fully adhered / mil membrane roofing abo Date: September 29, 2009 Permit type: Gc | Permit id: Ea11054 | |||||
At roof above apt# d1 entrance hallway near bulkhead and roof drain area install approx. 2 sqft of fully adhered mil membrane roofing abo Date: September 29, 2009 Permit type: Gc | Permit id: Ea11054 | |||||
At apt# d1: repair the broken defective plastered ceiling at the private hall in the apt. Plaster patch aprox sqft. Of ceiling damaged as a resu Date: November 14, 2011 Permit type: Gc | Permit id: Ec12288 | |||||
R/c 20141419802 apt b4: as per the requirement contract with hpd, provide and install 3 window guards and repair 2 throughout apartment. Remove Date: September 27, 2016 Permit type: Gc | Permit id: Eh02265 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: September 6, 2016 Permit type: Delead | Permit id: Eh02945 | |||||
R c 20141419802 apt b4: as per the requirement contract with hpd, provide and install 3 window guards and repair 2 throughout apartment. Remove Date: September 27, 2016 Permit type: Gc | Permit id: Eh02265 |