Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 73 Construct non structural interior alterations to the ground floor instrumentation labs g43 and g44, per floor plan subject to field inspection (stfi) Date: September 30, 2014 Value: $450,000 Applicant: Carraher, Rosemary | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6437636 | |||||
SCORE 61 Alterations to portion of level g lab and office areas including mechanical of molecular engineering building on campus of university of washington, per plan Date: January 4, 2012 Value: $200,000 Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6200354 | |||||
SCORE 95 Construct tenant improvements to level g and level 3 of the university of washington molecular engineering building per plan. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6280897 | |||||
Demolish johnson hall annex and cunningham hall for futureconstruction of molecular engineering bldg u of w per mup 3009781. Applicant: Ohare, Jodi | Permit type: Demolition | Permit status: Initial information colle | Current use: Institutional | Permit id: 6213263 | |||||
Construct non structural interior alterations to the ground floor instrumentation labs g43 and g44, per floor plan subject to field inspection (stfi) Date: September 30, 2014 Value: $450,000 Applicant: Carraher, Rosemary | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6437636 | |||||
Alterations to portion of level g lab and office areas including mechanical of molecular engineering building on campus of university of washington, per plan Date: January 4, 2012 Value: $200,000 Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6200354 | |||||
Lfd 5/29/2012 project cancelled per the 2006 sbc section 106. 6. 8 lfd ltr sent 4/19/2012 construct laboratory, support space, and classroom addition to existing uw molecular engineering building and occupy per plans. Date: October 28, 2010 Value: $11,901,123 Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Cancelled | Current use: Institutional | Permit id: 6255655 | |||||
Initial building of research space. Applicant: Belcher, Craig | Permit type: Construction | Current use: Institutional | Permit id: 6512511 | |||||
Demolish johnson hall annex and cunningham hall for futureconstruction of molecular engineering bldg u of w per mup 3009781. Applicant: Patterson-Ohare, Jodi | Permit type: Demolition | Permit status: Initial information colle | Current use: Institutional | Permit id: 6213263 | |||||
SCORE 95 Initial tenant improvements to north portion of molecular engineering building floors g, 3 and 4 including rooftop mechanical equipment at university of washington and occupy, per plan. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit issued | Expiration date: January 10, 2018 | Current use: Commercial | Permit id: 6512511 | |||||
SCORE 99 Lfd 5 29 2012 project cancelled per the 2006 sbc section 106. 6. 8 lfd ltr sent 4 19 2012 construct laboratory, support space, and classroom addition to existing uw molecular engineering building and occupy per plans. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Cancelled | Current use: Institutional | Permit id: 6255655 | |||||
Demolish johnson hall annex and cunningham hall for futureconstruction of molecular engineering bldg u of w per mup 3009781. Applicant: Patterson-Ohare, Jodi | Permit type: Demolition | Permit status: Initial information colle | Current use: Institutional | Permit id: 6213263 | |||||
SCORE 99 Phase ii of iii (foundation and structural for all floors). Construct a new lab building (molecular engineering building @ the university of washington) Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: April 21, 2011 | Expiration date: April 23, 2011 | Current use: Institutional | Permit id: 6226939 | |||||
SCORE 99 Phase i of ii (shoring & excavation) construct a new lab building (molecular engineering building @ the university of washington) per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: December 9, 2010 | Expiration date: March 2, 2011 | Current use: Institutional | Permit id: 6206325 | |||||
SCORE 98 Install cat 5e and cat 6a telecommunications cabling to 658 locations on the ground level and levels 1 through 4. Powercom job #450855. Date: July 6, 2016 Contractor: Powercom Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: July 6, 2017 | Current use: Commercial | Permit id: 6544425 | |||||
SCORE 95 Modify existing fire alarm system levels g, 3 & 4. Joint venture between simplexgrinnell & valley electric Date: July 22, 2016 Contractor: Valley Elec Co Of Mtvernon Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: July 22, 2017 | Current use: Commercial | Permit id: 6528908 | |||||
SCORE 95 Phase 2 - construction of new addition at university of washington nano engineering & sciences bldg. Previous permit approval for initial phase 1 work under permit # 6488107. Permit type: Electrical | Permit status: Permit issued | Expiration date: June 7, 2017 | Current use: Institutional | Permit id: 6521452 | |||||
SCORE 95 Closed - parent permit issued30-day get started for branch circuits only; plan review under 6463872. Date: March 13, 2015 Contractor: Valley Elec Co Of Mtvernon Inc Permit type: Electrical | Permit status: Permit closed | Expiration date: April 13, 2015 | Current use: Institutional | Permit id: 6463872 | |||||
SCORE 95 Installing temporary power for hoffman trailers, tower crane, lighting, and job site power. Uw nano engineering and sciences bldg Permit type: Electrical | Permit status: Permit issued | Expiration date: March 25, 2016 | Current use: Institutional | Permit id: 6463723 | |||||
SCORE 100 Install low voltage (ddc) controls for (2) labs Date: December 16, 2014 Contractor: E C Company Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2016 | Expiration date: December 16, 2015 | Current use: Commercial | Permit id: 6451139 | |||||
SCORE 91 Electrical remodel Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2015 | Expiration date: November 24, 2015 | Current use: Institutional | Permit id: 6445056 | |||||
SCORE 98 Wiring for new molecular engineering bldg. Construction ap# 6200357. Permit type: Electrical | Permit status: Permit closed | Completion date: December 18, 2012 | Expiration date: February 16, 2013 | Current use: Commercial | Permit id: 6234903 | |||||
SCORE 98 8 amp temp power for construction of new bldg; bldg permit 6226939 (phase ii of iii) Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2011 | Expiration date: December 9, 2010 | Current use: Commercial | Permit id: 6234300 | |||||
SCORE 95 Land use application to allow a 4-story, 92,0 sq. Ft. Laboratory building with a future 5-story 80,0 sq. Ft. Addition within the university of washington a major institution. Project results in a net loss of five parking spaces. Project includes 33,5 cu. Yds. Of grading. Existing structures (cunningham hall) to be relocated and (johnson hall annex) to be demolished. Draft supplemental environmental impact statement dated march 2009 has been prepared by university of washington. Date: September 2, 2009 Contractor: U Of W Capitol Projects Applicant: Patterson-Ohare, Jodi | Permit type: Sepa threshold determination | Permit status: Permit closed | Current use: Commercial | Permit id: 3009781 | |||||
SCORE 95 Stand alone fire sprinkler provide sprinkler protection on levels b,g,1,2,3, 4, per plans Date: June 24, 2016 Contractor: Cosco Fire Protection Inc Applicant: Hogfoss, Dan | Permit type: Mechanical | Permit status: Permit issued | Expiration date: December 24, 2017 | Current use: Commercial | Permit id: 6510619 | |||||
6 side sewer installation. Assoc. Building permit #6423929. 4-22-15 ah. 6 side sewer installation and drainage alterations for future construction permit #6464587. Revise ss permit to new once bldg permit is approved. Date: March 18, 2015 Applicant: Sweeters, Mark | Permit type: Side sewer | Permit status: Permit issued | Expiration date: November 30, 2016 | Current use: Institutional | Permit id: 6464587 | |||||
SCORE 59 Build out of two tenant spaces in basement of existing building. Adding chilled beams and chilled water piping, heating piping, duct work extension & compressed air piping. Applicant: Beck, Daniel | Permit type: Mechanical | Permit status: Permit closed | Completion date: March 5, 2015 | Expiration date: July 31, 2016 | Current use: Commercial | Permit id: 6448886 | |||||
SCORE 100 Install refer piping to a unit Date: June 8, 2012 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Refrigeration | Permit status: Permit closed | Completion date: June 29, 2012 | Expiration date: December 8, 2013 | Current use: Commercial | Permit id: 6323420 | |||||
SCORE 100 Install piping for 2 units Date: March 15, 2012 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Refrigeration | Permit status: Permit closed | Completion date: April 4, 2012 | Expiration date: September 15, 2013 | Current use: Institutional | Permit id: 6314109 | |||||
SCORE 98 Install expansion tank, lab cold water. Date: March 8, 2012 Contractor: Holmberg Company Applicant: Holmberg Company | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313401 | |||||
SCORE 98 Install expansion tank, domestic cold water. Date: March 8, 2012 Contractor: Holmberg Company Applicant: Holmberg Company | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313400 | |||||
SCORE 98 Install expansion tank, lab hot water. Date: March 8, 2012 Contractor: Holmberg Company Applicant: Holmberg Company | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313330 | |||||
SCORE 98 Install compressed air tank Date: March 8, 2012 Contractor: Holmberg Company Applicant: Holmberg Company | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313329 | |||||
SCORE 98 Install expansion tank, domestic hot water. Date: March 8, 2012 Contractor: Holmberg Company Applicant: Holmberg Company | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313328 | |||||
SCORE 100 Installing air seperator Date: November 1, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: November 15, 2011 | Expiration date: May 1, 2013 | Current use: Institutional | Permit id: 6300707 | |||||
SCORE 100 Installing expansion tank Date: November 1, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: November 15, 2011 | Expiration date: May 1, 2013 | Current use: Institutional | Permit id: 6300709 | |||||
SCORE 100 Installing pressure vessel; hydronic heating heat exchanger, steam to hot water, unit hx-3 Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289250 | |||||
SCORE 100 Installing pressure vessel; hx-4. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: January 26, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289249 | |||||
SCORE 100 Installing pressure vessel; hx-6. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: January 26, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289248 | |||||
SCORE 100 Installing heat exchanger; evaporator vessel for york chiller unit. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 7, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289246 | |||||
SCORE 100 Installing pressure vessel; heat exchanger hx-1, hydronic heating, steam to hot water. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289247 | |||||
SCORE 100 Installing flash tank in chiller ch-1 cabinet. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 25, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289245 | |||||
SCORE 100 Installing heat exchanger; evaporator for york chiller. Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 7, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289243 | |||||
SCORE 100 Installing flash tank inside chiller ch-2 cabinet Date: July 15, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289242 | |||||
SCORE 100 Install new pressure vessel- heat exchanger for lab hot water, hx-5. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287916 | |||||
SCORE 100 Install new pressure vessel; hydronic heating steam to water heat exchanger, unit hx-2. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287915 | |||||
SCORE 100 Install new pressure vessel; expansion tank, unit et-5. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287914 | |||||
SCORE 100 Install new pressure vessel; unit et-1a (expansion tank, hydronic hot water heating system.) Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287913 | |||||
SCORE 100 Install new pressure vessel; expansion tank, unit et-4. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287912 | |||||
SCORE 100 Install new pressure vessel; expansion tank, process hot water system. Unit et-3. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287911 | |||||
SCORE 100 Install new pressure vessel. Expansion tank, process chill water system. Unit et-2. Date: June 30, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287910 | |||||
SCORE 100 Install pressure vessel for water heater; reco lab hot water steam-to-water heat exchanger. Date: June 23, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 23, 2012 | Current use: Institutional | Permit id: 6287207 | |||||
SCORE 100 Install pressure vessel for water heater; lab hot water steam-to-hot water heat exchanger. Date: June 23, 2011 Contractor: Connie Hardin Applicant: Connie Hardin | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 23, 2012 | Current use: Institutional | Permit id: 6287208 | |||||
SCORE 91 3 9 2015 - cancelled customer log #15-418 adding 3 fire alarm devices to an existing system. Date: March 9, 2015 Contractor: System Solutions Of Wa Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: March 8, 2016 | Current use: Commercial | Permit id: 6462985 | |||||
SCORE 95 Install new f a system for uw molecular engineering bldg; this is a joint venture w simplexgrinnell & bergelectric corp. 10 4 jcb; revisions submitted per fire dept correction letter, add (10) f a devices. Date: December 3, 2010 Contractor: Simplexgrinnell Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 1, 2011 | Expiration date: December 3, 2011 | Current use: Commercial | Permit id: 6251979 | |||||
SCORE 95 Construction of new addition at university of washington nano engineering & sciences bldg. 12 6 16wr extended to 11 30 17. Permit type: Electrical | Permit status: Permit issued | Expiration date: November 30, 2016 | Current use: Institutional | Permit id: 6488107 | |||||
SCORE 99 Phase ii of iii (foundation and structural for all floors). Construct a new lab building (molecular engineering building @ the university of washington) Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: April 21, 2011 | Expiration date: April 23, 2011 | Current use: Institutional | Permit id: 6226939 | |||||
SCORE 61 Alterations to portion of level g lab and office areas including mechanical of molecular engineering building on campus of university of washington, per plan Date: March 27, 2012 Value: $200,000 Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Completion date: July 12, 2012 | Expiration date: September 27, 2013 | Current use: Institutional | Permit id: 6200354 | |||||
SCORE 99 Phase i of ii (shoring & excavation) construct a new lab building (molecular engineering building @ the university of washington) per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: December 9, 2010 | Expiration date: March 2, 2011 | Current use: Institutional | Permit id: 6206325 | |||||
Demolish johnson hall annex and cunningham hall for futureconstruction of molecular engineering bldg u of w per mup 3009781. Applicant: Patterson-Ohare, Jodi | Permit type: Demolition | Permit status: Initial information colle | Current use: Institutional | Permit id: 6213263 | |||||
SCORE 99 Lfd 5 29 2012 project cancelled per the 2006 sbc section 106. 6. 8 lfd ltr sent 4 19 2012 construct laboratory, support space, and classroom addition to existing uw molecular engineering building and occupy per plans. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Cancelled | Current use: Institutional | Permit id: 6255655 | |||||
SCORE 73 Construct non structural interior alterations to the ground floor instrumentation labs g43 and g44, per floor plan subject to field inspection (stfi) Date: September 30, 2014 Value: $450,000 Applicant: Carraher, Rosemary | Permit type: Construction | Permit status: Permit closed | Completion date: March 20, 2015 | Expiration date: March 30, 2016 | Current use: Institutional | Permit id: 6437636 | |||||
SCORE 100 New sanitary to private sewer main and new drainage to private storm main for bldg permit 6472619. Note: some inspections were already completed under ss permit 6464587. Mdc submitted w 6464587. Date: December 20, 2016 Contractor: Midmountain Contractors Inc Applicant: Mid-Mountain Contractors Inc | Permit type: Side sewer | Permit status: Permit issued | Expiration date: June 20, 2018 | Current use: Institutional | Permit id: 6572633 | |||||
SCORE 95 Closed as incomplete - expired permit. De watering permit, discharge to private storm main Date: April 17, 2015 Contractor: U Of W Building Permit Applicant: Belcher, Craig | Permit type: Side sewer | Permit status: Permit issued | Expiration date: October 17, 2016 | Current use: Institutional | Permit id: 6469578 | |||||
6" side sewer installation. Assoc. Building permit #6423929. 4-22-15 ah. 6" side sewer installation and drainage alterations for future construction permit #6464587. Revise ss permit to new once bldg permit is approved. (mcb 12 20 16: expired permit reopend and extended to 04 01 2017) Date: March 18, 2015 Applicant: Sweeters, Mark | Permit type: Side sewer | Permit status: Permit issued | Expiration date: April 1, 2017 | Current use: Institutional | Permit id: 6464587 | |||||
SCORE 95 Install refer piping to a unit Date: June 8, 2012 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Refrigeration | Permit status: Permit closed | Completion date: June 29, 2012 | Expiration date: December 8, 2013 | Current use: Commercial | Permit id: 6323420 | |||||
SCORE 95 Install piping for 2 units Date: March 15, 2012 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Refrigeration | Permit status: Permit closed | Completion date: April 4, 2012 | Expiration date: September 15, 2013 | Current use: Institutional | Permit id: 6314109 | |||||
SCORE 95 Installing air seperator Date: November 1, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: November 15, 2011 | Expiration date: May 1, 2013 | Current use: Institutional | Permit id: 6300707 | |||||
SCORE 95 Installing expansion tank Date: November 1, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: November 15, 2011 | Expiration date: May 1, 2013 | Current use: Institutional | Permit id: 6300709 | |||||
SCORE 95 Installing pressure vessel; hydronic heating heat exchanger, steam to hot water, unit hx-3 Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289250 | |||||
SCORE 95 Installing pressure vessel; hx-4. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: January 26, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289249 | |||||
SCORE 95 Installing pressure vessel; hx-6. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: January 26, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289248 | |||||
SCORE 95 Installing pressure vessel; heat exchanger hx-1, hydronic heating, steam to hot water. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289247 | |||||
SCORE 95 Installing heat exchanger; evaporator vessel for york chiller unit. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 7, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289246 | |||||
SCORE 95 Installing flash tank in chiller ch-1 cabinet. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 25, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289245 | |||||
SCORE 95 Installing flash tank inside chiller ch-2 cabinet Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289242 | |||||
SCORE 95 Installing heat exchanger; evaporator for york chiller. Date: July 15, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 7, 2012 | Expiration date: January 15, 2013 | Current use: Institutional | Permit id: 6289243 | |||||
SCORE 95 Install new pressure vessel- heat exchanger for lab hot water, hx-5. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287916 | |||||
SCORE 95 Install new pressure vessel; hydronic heating steam to water heat exchanger, unit hx-2. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287915 | |||||
SCORE 95 Install new pressure vessel; expansion tank, unit et-5. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287914 | |||||
SCORE 95 Install new pressure vessel; unit et-1a (expansion tank, hydronic hot water heating system.) Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 21, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287913 | |||||
SCORE 95 Install new pressure vessel; expansion tank, process hot water system. Unit et-3. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287911 | |||||
SCORE 95 Install new pressure vessel; expansion tank, unit et-4. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287912 | |||||
SCORE 95 Install new pressure vessel. Expansion tank, process chill water system. Unit et-2. Date: June 30, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 30, 2012 | Current use: Institutional | Permit id: 6287910 | |||||
SCORE 95 Install pressure vessel for water heater; reco lab hot water steam-to-water heat exchanger. Date: June 23, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 23, 2012 | Current use: Institutional | Permit id: 6287207 | |||||
SCORE 95 Install pressure vessel for water heater; lab hot water steam-to-hot water heat exchanger. Date: June 23, 2011 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: October 20, 2011 | Expiration date: December 23, 2012 | Current use: Institutional | Permit id: 6287208 | |||||
SCORE 99 Install compressed air tank Date: March 8, 2012 Contractor: Greg Fox Applicant: Greg Fox | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313329 | |||||
SCORE 99 Install expansion tank, lab cold water. Date: March 8, 2012 Contractor: Greg Fox Applicant: Greg Fox | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313401 | |||||
SCORE 99 Install expansion tank, domestic cold water. Date: March 8, 2012 Contractor: Greg Fox Applicant: Greg Fox | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313400 | |||||
SCORE 99 Install expansion tank, lab hot water. Date: March 8, 2012 Contractor: Greg Fox Applicant: Greg Fox | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313330 | |||||
SCORE 99 Install expansion tank, domestic hot water. Date: March 8, 2012 Contractor: Greg Fox Applicant: Greg Fox | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: March 23, 2012 | Expiration date: September 8, 2013 | Current use: Commercial | Permit id: 6313328 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-707installing (1) heating water - heat exchanger hx-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572932 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-716installing (1) lab hot water expansion tank Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572941 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-718install (1) air receiver Date: March 9, 2017 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: September 9, 2018 | Current use: Commercial | Permit id: 6585411 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-702installing (1) chiller - 1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572925 | |||||
SCORE 95 5 31 2017- cancelled customer log #17-706installing (1) clean steam generator csg-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572931 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-705installing (1) heat recovery expansion tank hr. Et-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572930 | |||||
SCORE 95 5 31 2017- cancelled customer log #17-715installing (1) lab hot water lwh-2 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572940 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-712installing (1) chilled water air seperator as-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572937 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-711installing (1) process hot water expansion tank phw-et-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572936 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-709installing (1) glycol heating water ghs-et-2 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572934 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-703installing (1) chiller - 2 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572928 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-717installing (1) lab hot water storage tank st-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572942 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-714installing (1) lab hot water lwh-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572939 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-713installing (1) chilled water et-chw-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572938 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-710installing (1) glycol heating water expansion tank ghs-et-1 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572935 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-708installing (1) heating water - heat exchanger hx-2 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572933 | |||||
SCORE 95 5 31 2017 - cancelled customer log #17-704installing (1) chiller - 3 Date: December 22, 2016 Contractor: Holadayparks, Inc Applicant: Holaday-Parks, Inc. | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 22, 2018 | Current use: Commercial | Permit id: 6572929 | |||||
Closed as incomplete - expired permit. 6" side sewer installation. Assoc. Building permit #6423929. 4-22-15 ah. 6" side sewer installation and drainage alterations for future construction permit #6464587. Revise ss permit to new once bldg permit is approved. (mcb 12 20 16: expired permit reopend and extended to 04 01 2017) Date: March 18, 2015 Applicant: Sweeters, Mark | Permit type: Side sewer | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: April 1, 2017 | Current use: Institutional | Permit id: 6464587 | |||||
SCORE 95 Initial ti of entire 4th floor, mechanical included, of molecular engineering bldg. Currently under construction, per plans. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: May 17, 2012 | Current use: Commercial | Permit id: 6250716 | |||||
SCORE 100 Low voltage hvac energy management controls (shell & core)/base project - uw nano building) Date: August 10, 2016 Contractor: Epic Electric Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: August 10, 2017 | Current use: Commercial | Permit id: 6550806 | |||||
SCORE 95 Day get started for branch circuits only; plan review under 6488107. [nano engineering & sciences bldg.] extended to 11/21/15 rrj Date: September 11, 2015 Contractor: Valley Elec Co Of Mtvernon Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 30, 2015 | Expiration date: November 21, 2015 | Current use: Institutional | Permit id: 6494288 | |||||
SCORE 95 Add convenience power receptacles to support new owner equipment and break room remodeling. Date: June 19, 2017 Contractor: Valley Elec Co Of Mtvernon Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2017 | Expiration date: June 19, 2018 | Current use: Institutional | Permit id: 6603395 | |||||
SCORE 95 Alterations to existing molecular engineering classroom building, construct 6-level addition and occupy, per plans. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Application accepted | Current use: Institutional | Permit id: 6423929 | |||||
SCORE 98 Install cat 5d cables into new furniture on the 4th floor. Cables originally installed & inspected on permit #6544425. Powercom job #450855. Date: July 10, 2017 Contractor: Powercom Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2017 | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6607006 | |||||
SCORE 95 Sepa - shell and core building addition (69,4 square feet) to existing uw molecular engineering building. Contractor: U Of W Building Permit Applicant: Belcher, Craig | Permit type: Sepa threshold determination | Current use: Institutional | Permit id: 3017632 | |||||
SCORE 98 Install previously installed (on permit #6544425) cat 5e cables into new furniture on the 2nd floor. Powercom job #450855. Date: July 10, 2017 Contractor: Powercom Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 21, 2017 | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606927 | |||||
SCORE 100 8 amp temp power for construction of new bldg; bldg permit 6226939 (phase ii of iii) Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2011 | Expiration date: December 9, 2010 | Current use: Commercial | Permit id: 6234300 | |||||
SCORE 95 Construct a new lab building (molecular engineering building @ univeristy of washington (phase iii of iii architectural completion) and occupy per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: May 17, 2012 | Current use: Institutional | Permit id: 6200357 | |||||
SCORE 95 Shoring & excavation per plans. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Application accepted | Current use: Institutional | Permit id: 6446578 | |||||
Demolish johnson hall annex and cunningham hall for futureconstruction of molecular engineering bldg u of w per mup 3009781. Applicant: Patterson-Ohare, Jodi | Permit type: Demolition | Permit status: Initial information colle | Current use: Institutional | Permit id: 6213263 | |||||
SCORE 95 Add to existing fire alarm system. Joint venture between simplexgrinnell and valley electric. [uw molecular engineering-nano addition] wgr: permit extended days. Date: February 10, 2016 Contractor: Valley Elec Co Of Mtvernon Inc Permit type: Electrical | Permit status: Permit issued | Completion date: April 14, 2017 | Expiration date: February 10, 2017 | Current use: Commercial | Permit id: 6509248 | |||||
SCORE 95 Install modular furniture (power wiring by others) Date: July 7, 2017 Contractor: S E S Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: October 9, 2017 | Expiration date: July 7, 2018 | Current use: Commercial | Permit id: 6606645 | |||||
SCORE 98 Install cat 5e cables into new furniture on the 3rd floor. Cables originally installed & inspected on permit #6544425. Powercom job #450855. Date: July 10, 2017 Contractor: Powercom Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2017 | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606999 | |||||
SCORE 95 Site work including grading, tenant improvements, and installation of new mechanical equipment on roof top of molecular engineering building at university of washington and occupy per plan. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit issued | Expiration date: June 29, 2017 | Current use: Institutional | Permit id: 6472619 | |||||
SCORE 95 Construct platform and alterations in an existing elevator hoist way in uw mol engr building, per plans. Applicant: Frederick, Richard | Permit type: Construction | Permit status: Permit issued | Expiration date: December 6, 2018 | Current use: Commercial | Permit id: 6580081 | |||||
SCORE 95 Acces control meb bldg job #32-09-091574 3 12 mvc: renew. Date: March 24, 2011 Contractor: R F I Comm And Security Systems Permit type: Electrical | Permit status: Permit closed | Completion date: October 25, 2012 | Expiration date: March 23, 2013 | Current use: Commercial | Permit id: 6278145 | |||||
SCORE 95 Install data cabling. 5 3 12 jcb; renew. Date: March 1, 2011 Contractor: Teknon Corporation Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2012 | Expiration date: March 1, 2013 | Current use: Institutional | Permit id: 6275856 | |||||
SCORE 100 Provide 1 2" flexible coduit whips from 25 dry contacts to existing electrician provided junction box. Provide 2 #16 tffn conductors from 25 dry contacts. No terminations to be performed. Date: February 24, 2011 Contractor: Smith Fire Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2011 | Expiration date: February 24, 2012 | Current use: Commercial | Permit id: 6275462 | |||||
SCORE 100 We will be installing two small audio video systems in j156 & j275. Date: February 15, 2011 Contractor: Commercial Sound And Comm Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2011 | Expiration date: February 15, 2012 | Current use: Commercial | Permit id: 6274613 | |||||
SCORE 100 Wiring for new molecular engineering bldg. Construction ap# 6200357. Permit type: Electrical | Permit status: Permit closed | Completion date: December 18, 2012 | Expiration date: February 16, 2013 | Current use: Commercial | Permit id: 6234903 | |||||
SCORE 100 Adding (10) devices to tenat improvement - joint venture between berg electric corp & simplexgrinnell Date: June 22, 2011 Contractor: Bergelectric Corp Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2012 | Expiration date: June 22, 2012 | Current use: Commercial | Permit id: 6284198 | |||||
SCORE 95 Relocate (3) 100a 208v sub feeders (mx89099). 11/5/09 jcb; add 1/2 hour inspn fee. Date: August 25, 2009 Contractor: Veca Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 7, 2011 | Expiration date: August 25, 2010 | Current use: Commercial | Permit id: 6225231 |