Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
1 furnace, 1 ductwork, 1 gas line Date: November 2, 2015 Permit type: Mechanical | Permit status: Pass | Completion date: December 4, 2015 | Current use: Commercial | Permit id: Bld2015-09391 | |||||
SCORE 61 Store front sign Date: October 29, 2015 Contractor: Service Guys Llc The17 W Sequoia Vista Cir Permit type: Sign | Permit status: Accepted - standard | Completion date: October 29, 2015 | Permit id: Bld2015-09276 | |||||
Power to panel permit, 1 meter for both 1785 & 17 sequoia vista. Date: October 2, 2015 Permit type: Electrical | Permit status: Pass | Completion date: October 8, 2015 | Current use: Commercial | Permit id: Bld2015-08107 | |||||
Electrical for new commercial build power to panel and temp power authorized by separate permits Date: June 17, 2015 Permit type: Electrical | Permit status: Completed | Completion date: June 17, 2015 | Current use: Commercial | Permit id: Bld2015-04384 | |||||
Storage unit facility. See bld2014-094 . Mop service, sink, wash basin, water closet. Date: May 11, 2015 Permit type: Plumbing | Permit status: Reviews not require | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03312 | |||||
Storage unit facility. See bld2014-094 plumbing permit 2 x tubs, clothes washer, sink, dishwasher, laundry tub, shower, 2 floor drains, floor sink, kitchen sink, 4 wash basin, 2 water closets. Date: May 11, 2015 Permit type: Plumbing | Permit status: On-line ready | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03311 | |||||
Storage unit facility. See bld2014-094 for permit fees, permit issued for inspection purposes. Includes a caretaker single family dwelling on lot. Date: March 16, 2015 Permit type: Permit | Permit status: Pass | Completion date: March 16, 2015 | Current use: Commercial | Permit id: Bld2015-01664 | |||||
(1) flat storefront sign, (1) pole sign a. M. Date: August 7, 2014 Permit type: Sign | Permit status: Pass | Completion date: September 2, 2014 | Permit id: Bld2014-05688 | |||||
SCORE 64 Install 1-furnace/split & duct work Date: July 31, 2014 Contractor: Advanced Comfort Solutionsoreilly Permit type: Mechanical | Permit status: No certificate req | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-05473 | |||||
Power to panel Date: July 18, 2014 Permit type: Electrical | Permit status: No certificate req | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-05115 | |||||
Permit for installation of shelving Date: June 25, 2014 Permit type: Permit | Permit status: Pass | Completion date: August 22, 2014 | Current use: Commercial | Permit id: Bld2014-04443 | |||||
SCORE 64 New building Date: May 21, 2014 Contractor: S And B Plumbing Incoreilly Auto Parts Permit type: Plumbing | Permit status: Completed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-03478 | |||||
Electrical permit Date: April 24, 2014 Permit type: Electrical | Permit status: No certificate req | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-02711 | |||||
SCORE 98 Electrical permit, job bid 8000. Date: September 24, 2013 Contractor: Cook Electric Inc Permit type: Electrical | Permit status: Closed | Completion date: November 5, 2013 | Current use: Commercial | Permit id: Bld2013-06953 | |||||
SCORE 64 Installing 1 split furnace/air conditioner and redoing existing duct work Date: September 24, 2013 Contractor: Gunthers Comfort Airarena Communications Permit type: Mechanical | Permit status: Closed | Completion date: November 7, 2013 | Current use: Commercial | Permit id: Bld2013-06949 | |||||
Fire sprinklers Date: September 24, 2013 Permit type: Fire | Permit status: Pass | Completion date: November 8, 2013 | Current use: Commercial | Permit id: Bld2013-06952 | |||||
Add 9 sq ft office space mezzanine level inside an existing office/warehouse space, mech/elec permits reqd t. B. Cc zone addition of mezzanine for office use 9 sq ft, see parking calcs & notes at zoning stamp a. S. Date: July 8, 2013 Permit type: Permit | Permit status: Pass | Completion date: November 7, 2013 | Current use: Commercial | Permit id: Bld2013-04669 | |||||
Construction of a new building for the purpose of the retail sale of auto parts. Date: August 9, 2012 Permit type: Permit | Permit status: Cert occ no warranty | Completion date: September 10, 2014 | Current use: Commercial | Permit id: Bld2012-05857 | |||||
SCORE 61 Arena communications would like to add some extra second floor space to their existing building. Date: October 20, 2015 Contractor: Arena Communications Additionbrandon Lundeen Permit status: Closed | Current use: Commercial | Permit id: Bld2015-06396 | |||||
Storage unit facility. See bld2014-094 for permit fees, permit issued for inspection purposes. Includes a caretaker single family dwelling on lot. Date: January 20, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2015-01664 | |||||
SCORE 61 Construct (9) single use restrooms, e & p permits reqd Date: September 28, 2015 Contractor: Office Spacebrandon Lunden Permit status: Closed | Current use: Commercial | Permit id: Bld2015-03741 | |||||
SCORE 61 Permit for installation of shelving Date: August 22, 2014 Contractor: Oreilly Auto Partstodd Davis Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04443 | |||||
Log in for new office wearhouse, shell only Date: December 8, 2008 Permit status: Closed | Completion date: January 30, 2009 | Current use: Commercial | Permit id: Bld2008-04208 | |||||
Construction of a new building for the purpose of the retail sale of auto parts. Date: September 10, 2014 Permit status: Closed | Current use: Commercial | Permit id: Bld2012-05857 | |||||
SCORE 56 Construction of a new building for the purpose of the retail sale of auto parts. Date: August 9, 2012 Permit status: Closed | Completion date: September 10, 2014 | Current use: Commercial | Permit id: Bld2012-05857 | |||||
Add 9 sq ft office space mezzanine level inside an existing office/warehouse space, mech/elec permits reqd t. B. Cc zone addition of mezzanine for office use 9 sq ft, see parking calcs & notes at zoning stamp a. S. Date: July 8, 2013 Permit status: Closed | Completion date: November 7, 2013 | Current use: Commercial | Permit id: Bld2013-04669 | |||||
SCORE 56 Fire sprinklers Date: September 24, 2013 Permit type: Fire | Permit status: Closed | Completion date: November 8, 2013 | Current use: Commercial | Permit id: Bld2013-06952 | |||||
Electrical permit Date: April 24, 2014 Permit type: Electrical | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-02711 | |||||
SCORE 67 Permit for installation of shelving Date: June 25, 2014 Contractor: Stout Building Contractors Llcoreilly Auto Parts Permit status: Closed | Completion date: August 22, 2014 | Current use: Commercial | Permit id: Bld2014-04443 | |||||
Power to panel Date: July 18, 2014 Permit type: Electrical | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-05115 | |||||
SCORE 56 (1) flat storefront sign, (1) pole sign a. M. Date: August 7, 2014 Permit type: Sign | Permit status: Closed | Completion date: September 2, 2014 | Permit id: Bld2014-05688 | |||||
Storage unit facility. See bld2014-094 plumbing permit 2 x tubs, clothes washer, sink, dishwasher, laundry tub, shower, 2 floor drains, floor sink, kitchen sink, 4 wash basin, 2 water closets. Date: May 11, 2015 Permit type: Plumbing | Permit status: Inspections | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03311 | |||||
Storage unit facility. See bld2014-094 . Mop service, sink, wash basin, water closet. Date: May 11, 2015 Permit type: Plumbing | Permit status: Inspections | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03312 | |||||
Construct (9) single use restrooms, e & p permits reqd Date: May 28, 2015 Permit status: Closed | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-03741 | |||||
Electrical for new commercial build power to panel and temp power authorized by separate permits Date: June 17, 2015 Permit type: Electrical | Permit status: Inspections | Completion date: June 17, 2015 | Current use: Commercial | Permit id: Bld2015-04384 | |||||
SCORE 64 1 toilet, 1 lav & 1 floor drain only. Add toilet and lav and floor drain Date: August 7, 2015 Contractor: Triton Plumbing Llcarena Permit type: Plumbing | Permit status: Closed | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-06272 | |||||
SCORE 66 Arena communications would like to add some extra second floor space to their existing building. Date: August 12, 2015 Contractor: Arena Communications Addition Permit status: Inspections | Completion date: October 20, 2015 | Current use: Commercial | Permit id: Bld2015-06396 | |||||
Power to panel permit, 1 meter for both 1785 & 17 sequoia vista. Date: October 2, 2015 Permit type: Electrical | Permit status: Closed | Completion date: October 8, 2015 | Current use: Commercial | Permit id: Bld2015-08107 | |||||
1 furnace, 1 ductwork, 1 gas line Date: November 2, 2015 Permit type: Mechanical | Permit status: Closed | Completion date: December 4, 2015 | Current use: Commercial | Permit id: Bld2015-09391 | |||||
SCORE 66 Please upload plans to pdox for review and pay the plan check fee arena communications would like to add some extra second floor space to their existing building. Date: August 12, 2015 Contractor: Arena Communications Addition Permit type: Permit | Permit status: Corrections required | Completion date: August 24, 2015 | Current use: Commercial | Permit id: Bld2015-06396 | |||||
SCORE 100 1 toilet, 1 lav & 1 floor drain only. Add toilet and lav and floor drain Date: August 7, 2015 Contractor: Triton Plumbing Llc Permit type: Plumbing | Permit status: Applicant info required | Completion date: August 7, 2015 | Current use: Commercial | Permit id: Bld2015-06272 | |||||
SCORE 100 Electrical for new commercial build power to panel and temp power authorized by separate permits Date: June 17, 2015 Contractor: Highmark Electric Llc Permit type: Electrical | Permit status: In progress | Completion date: June 17, 2015 | Current use: Commercial | Permit id: Bld2015-04384 | |||||
SCORE 99 Construct (9) single use restrooms, e & p permits reqd Date: May 28, 2015 Contractor: Trico Realty And Investment Co Permit type: Permit | Permit status: Pass | Completion date: May 28, 2015 | Current use: Commercial | Permit id: Bld2015-03741 | |||||
SCORE 95 Storage unit facility. See bld2014-094 . Mop service, sink, wash basin, water closet. Date: May 11, 2015 Contractor: Big Johns Plumbing Inc Permit type: Plumbing | Permit status: On-line ready | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03312 | |||||
SCORE 95 Storage unit facility. See bld2014-094 plumbing permit 2 x tubs, clothes washer, sink, dishwasher, laundry tub, shower, 2 floor drains, floor sink, kitchen sink, 4 wash basin, 2 water closets. Date: May 11, 2015 Contractor: Big Johns Plumbing Inc Permit type: Plumbing | Permit status: On-line ready | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03311 | |||||
SCORE 99 Storage unit facility. See bld2014-094 for permit fees, permit issued for inspection purposes. Includes a caretaker single family dwelling on lot. Date: March 16, 2015 Contractor: Trico Realty And Investment Co Permit type: Permit | Permit status: Pass | Completion date: March 16, 2015 | Current use: Commercial | Permit id: Bld2015-01664 | |||||
SCORE 61 Permit for shelving (building permit for construction of building itself approved under bld2012-05857) Date: August 22, 2014 Contractor: Oreilly Auto Partstodd Davis Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04443 | |||||
SCORE 61 Addition to the existing second floor area. Date: October 20, 2015 Contractor: Arena Communications Additionbrandon Lundeen Permit status: Closed | Current use: Commercial | Permit id: Bld2015-06396 | |||||
SCORE 59 Commercial building permit, retail auto parts sales Date: September 10, 2014 Contractor: Oreilly Auto Parts, Salt Lake City #6todd Permit status: Closed | Current use: Commercial | Permit id: Bld2012-05857 | |||||
SCORE 59 Bld2015-06396 Date: December 8, 2015 Permit status: Void | Current use: Commercial | Permit id: Bld2015-10459 | |||||
SCORE 64 Date: January 20, 2016 Contractor: Boxnlock Storagebrandon Lundeen Permit status: Closed | Current use: Commercial | Permit id: Bld2015-01664 | |||||
SCORE 61 Date: September 28, 2015 Contractor: Office Spacebrandon Lunden Permit status: Closed | Current use: Commercial | Permit id: Bld2015-03741 | |||||
SCORE 66 Arena communications would like to add some extra second floor space to their existing building. Date: August 12, 2015 Contractor: Arena Communications Addition Permit type: Permit | Permit status: In progress | Completion date: October 20, 2015 | Current use: Commercial | Permit id: Bld2015-06396 | |||||
Construct (9) single use restrooms, e & p permits reqd Date: May 28, 2015 Permit type: Permit | Permit status: Pass | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-03741 | |||||
SCORE 64 1 toilet, 1 lav & 1 floor drain only. Add toilet and lav and floor drain Date: August 7, 2015 Contractor: Triton Plumbing Llcarena Permit type: Plumbing | Permit status: Pass | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-06272 | |||||
Log in for new office wearhouse, shell only Date: December 8, 2008 Permit type: Permit | Permit status: Corrections required | Completion date: January 30, 2009 | Current use: Commercial | Permit id: Bld2008-04208 | |||||
SCORE 99 Plumbing Date: March 12, 2007 Contractor: Building Permit status: Completed | Completion date: June 4, 2010 | Current use: Commercial | Permit id: Bld2007-223665 | |||||
SCORE 99 Plumbing Date: March 12, 2007 Contractor: Building Permit status: Closed | Completion date: June 4, 2010 | Current use: Commercial | Permit id: Bld2007-223665 | |||||
SCORE 99 Plumbing Date: March 12, 2007 Contractor: Building Permit status: Closed | Completion date: June 4, 2010 | Current use: Commercial | Permit id: Bld2007-223665 | |||||
SCORE 59 Log in for new office wearhouse, shell only Date: December 8, 2008 Permit status: Closed | Completion date: January 30, 2009 | Current use: Commercial | Permit id: Bld2008-04208 | |||||
SCORE 59 Construction of a new building for the purpose of the retail sale of auto parts. Date: August 9, 2012 Permit status: Closed | Completion date: September 10, 2014 | Current use: Commercial | Permit id: Bld2012-05857 | |||||
SCORE 59 Add 9 sq ft office space mezzanine level inside an existing office warehouse space, mech elec permits reqd t. B. Cc zone addition of mezzanine for office use 9 sq ft, see parking calcs & notes at zoning stamp a. S. Date: July 8, 2013 Permit status: Closed | Completion date: November 7, 2013 | Current use: Commercial | Permit id: Bld2013-04669 | |||||
SCORE 64 Installing 1 split furnace air conditioner and redoing existing duct work Date: September 24, 2013 Contractor: Gunthers Comfort Airarena Communications Permit type: Mechanical | Permit status: Closed | Completion date: November 7, 2013 | Current use: Commercial | Permit id: Bld2013-06949 | |||||
SCORE 59 Fire sprinklers Date: September 24, 2013 Permit type: Fire | Permit status: Closed | Completion date: November 8, 2013 | Current use: Commercial | Permit id: Bld2013-06952 | |||||
SCORE 98 Electrical permit, job bid 8000. Date: September 24, 2013 Contractor: Cook Electric Inc Permit type: Electrical | Permit status: Closed | Completion date: November 5, 2013 | Current use: Commercial | Permit id: Bld2013-06953 | |||||
SCORE 64 Electrical permit Date: April 24, 2014 Permit type: Electrical | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-02711 | |||||
SCORE 64 New building Date: May 21, 2014 Contractor: S And B Plumbing Incoreilly Auto Parts Permit type: Plumbing | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-03478 | |||||
SCORE 74 Permit for installation of shelving Date: June 25, 2014 Permit status: Closed | Completion date: August 22, 2014 | Current use: Commercial | Permit id: Bld2014-04443 | |||||
SCORE 64 Power to panel Date: July 18, 2014 Permit type: Electrical | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-05115 | |||||
SCORE 64 Install 1-furnace split & duct work Date: July 31, 2014 Contractor: Advanced Comfort Solutionsoreilly Permit type: Mechanical | Permit status: Closed | Completion date: September 4, 2014 | Current use: Commercial | Permit id: Bld2014-05473 | |||||
SCORE 59 (1) flat storefront sign, (1) pole sign a. M. Date: August 7, 2014 Permit type: Sign | Permit status: Closed | Completion date: September 2, 2014 | Permit id: Bld2014-05688 | |||||
SCORE 67 Storage unit facility. See bld2014-094 for permit fees, permit issued for inspection purposes. Includes a caretaker single family dwelling on lot. Date: March 16, 2015 Contractor: Trico Realty And Investment Coboxnlock Storage Permit status: Inspections | Completion date: March 16, 2015 | Current use: Commercial | Permit id: Bld2015-01664 | |||||
SCORE 64 Storage unit facility. See bld2014-094 plumbing permit 2 x tubs, clothes washer, sink, dishwasher, laundry tub, shower, 2 floor drains, floor sink, kitchen sink, 4 wash basin, 2 water closets. Date: May 11, 2015 Contractor: Big Johns Plumbing Incboxnlock Storage Permit type: Plumbing | Permit status: Inspections | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03311 | |||||
SCORE 64 Storage unit facility. See bld2014-094 . Mop service, sink, wash basin, water closet. Date: May 11, 2015 Contractor: Big Johns Plumbing Incboxnlock Storage Permit type: Plumbing | Permit status: Inspections | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03312 | |||||
SCORE 59 Construct (9) single use restrooms, e & p permits reqd Date: May 28, 2015 Contractor: Trico Realty And Investment Cooffice Space Permit status: Closed | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-03741 | |||||
SCORE 69 Electrical for new commercial build power to panel and temp power authorized by separate permits Date: June 17, 2015 Contractor: Highmark Electric, Llcboxnlock Storage Permit type: Electrical | Permit status: Inspections | Completion date: June 17, 2015 | Current use: Commercial | Permit id: Bld2015-04384 | |||||
SCORE 64 1 toilet, 1 lav & 1 floor drain only. Add toilet and lav and floor drain Date: August 7, 2015 Contractor: Triton Plumbing Llcarena Permit type: Plumbing | Permit status: Closed | Completion date: September 28, 2015 | Current use: Commercial | Permit id: Bld2015-06272 | |||||
SCORE 66 Arena communications would like to add some extra second floor space to their existing building. Date: August 12, 2015 Contractor: Arena Communications Addition Permit status: Inspections | Completion date: October 20, 2015 | Current use: Commercial | Permit id: Bld2015-06396 | |||||
SCORE 69 Power to panel permit, 1 meter for both 1785 & 17 sequoia vista. Date: October 2, 2015 Contractor: Highmark Electric, Llcboxnlock Storage Permit type: Electrical | Permit status: Closed | Completion date: October 8, 2015 | Current use: Commercial | Permit id: Bld2015-08107 | |||||
SCORE 61 Store front sign Date: October 29, 2015 Contractor: Service Guys Llc The17 W Sequoia Vista Cir Permit type: Sign | Permit status: Inspections | Completion date: October 29, 2015 | Permit id: Bld2015-09276 | |||||
SCORE 59 1 furnace, 1 ductwork, 1 gas line Date: November 2, 2015 Contractor: Larkin Hvac Of Utah Inclocknbox Permit type: Mechanical | Permit status: Closed | Completion date: December 4, 2015 | Current use: Commercial | Permit id: Bld2015-09391 |