Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Expansion of the clean room at varian medical. Replace and or add additional fire alarm equipment consisting of four (4) duct smoke detectors and 16 a v devices. All wiring to be class a. Date: August 20, 2015 Contractor: Simplexgrinnell Permit type: Low voltage | Permit status: Completed | Completion date: August 24, 2015 | Current use: Commercial | Permit id: Bld2015-06655 | |||||
SCORE 100 Please upload plans to pdox for review this is an addition to an existing system. We will be adding 2 manual pull stations, 2 duct smoke detectors and 23 multi-candela horn-strobes. Drawings will include new voltage drops, battery calculations, wiring and device placement. Date: August 17, 2015 Contractor: Simplexgrinnell Permit type: Low voltage | Permit status: Accepted - login review | Completion date: August 17, 2015 | Current use: Commercial | Permit id: Bld2015-06546 | |||||
SCORE 95 Sprinklers Date: July 27, 2015 Contractor: Firetrol Protection Systems Permit type: Fire | Permit status: Corrections required | Completion date: August 21, 2015 | Current use: Commercial | Permit id: Bld2015-05768 | |||||
SCORE 67 Remodel of the existing kitchen & servery. Removal of existing kitchen & server equipment, demolition of existing interior walls, construction of new walls and finishes and installation of new kitchen & servery equipment. Also includes upgrade of the mechanical system. Date: May 15, 2015 Contractor: Mhtn Architects Inc Permit type: Permit | Permit status: Corrections required | Completion date: August 7, 2015 | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 56 Varian customer owned electrical substation Date: April 14, 2015 Contractor: Varian Medical Systems Inc Permit type: Permit | Permit status: Completed | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-02462 | |||||
SCORE 100 Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design build sub-contractor. Date: March 26, 2015 Contractor: Jacobsen Construction Company Inc Permit type: Permit | Permit status: Completed | Completion date: August 11, 2015 | Current use: Commercial | Permit id: Bld2015-01996 | |||||
SCORE 100 3 fire lines and 3 fire hydrants Date: February 13, 2015 Contractor: Jones Excavating Company Inc Permit type: Fire | Permit status: In progress | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2015-01008 | |||||
SCORE 100 Install 3 boilers Date: February 10, 2015 Contractor: Alternative Mechanical Contractors Inc Permit type: Mechanical | Permit status: Accepted | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2015-00923 | |||||
SCORE 95 Sprinkler system Date: January 6, 2015 Contractor: Firetrol Protection Systems Permit type: Fire | Permit status: Pass | Completion date: April 10, 2015 | Current use: Commercial | Permit id: Bld2015-00086 | |||||
SCORE 95 Install new facp and transponder with new devices in the new expansion of the existing building. Network facp and transponder to existing building fire alarm system. Date: December 17, 2014 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Pass | Completion date: February 4, 2015 | Current use: Commercial | Permit id: Bld2014-09244 | |||||
SCORE 100 Commercial electrical permit. Date: November 19, 2014 Contractor: Cache Valley Electric Co Permit type: Electrical | Permit status: Completed | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08549 | |||||
SCORE 82 Install 3 boilers, 2 cooling towers, 5 air handlers, 2 chillers, and 18 pumps. Date: November 19, 2014 Contractor: Khi Mechanical Permit type: Mechanical | Permit status: Completed | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08552 | |||||
SCORE 99 Install waste, vent, water, gas piping, 1 water heater, and plumbing fixtures. Date: November 19, 2014 Contractor: Kemp And Hilton Inc Permit type: Plumbing | Permit status: Accepted | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08554 | |||||
SCORE 100 Permit to remove excess mound dirt as per approved plan only. Date: September 5, 2014 Contractor: Jacobsen Construction Company Inc Permit type: Site development | Permit status: Pass with conditions | Completion date: September 5, 2014 | Current use: Na | Permit id: Bld2014-06442 | |||||
SCORE 100 10-fixtures. Work cannot begin until bldg. Permit is issued. Date: June 25, 2014 Contractor: Alternative Mechanical Contractors Inc Permit type: Plumbing | Permit status: On-line ready | Completion date: June 25, 2014 | Current use: Commercial | Permit id: Bld2014-04479 | |||||
SCORE 73 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: June 19, 2014 Contractor: Daw Technologies Llc Permit type: Permit | Permit status: Accepted - standard | Completion date: June 19, 2014 | Current use: Commercial | Permit id: Bld2014-04296 | |||||
SCORE 100 This project is strictly a site utilities & rough grading project. It is related to the clean room project ( bld2014-03063 ) that is currently being reviewed for permit in that it gets gas and sewer lines to that portion of the site to support it and finishes the fire line loop. It is also to bring a new fiber optic line to the site and move some existing utilities out of the way of a near future addition to the building. Date: May 22, 2014 Contractor: Jacobsen Construction Company Inc Permit type: Site development | Permit status: Completed | Completion date: September 18, 2014 | Current use: Na | Permit id: Bld2014-03540 | |||||
SCORE 73 Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: May 6, 2014 Contractor: Daw Technologies Llc Permit type: Permit | Permit status: Completed | Completion date: June 30, 2014 | Current use: Commercial | Permit id: Bld2014-03063 | |||||
SCORE 64 Install new facp and connect to existing network of fire alarm panels. Add devices as shown on drawings for the core and shell of the cafeteria. Provide outputs to the bas system, coordinate signals needed with bas contractor. Date: November 19, 2015 Contractor: Simplexgrinnellvarian Medical Cafeteria Phase 1 Permit type: Low voltage | Permit status: Accepted - login review | Completion date: November 23, 2015 | Current use: Commercial | Permit id: Bld2015-10059 | |||||
SCORE 59 Elect. 429,990. 67 Date: September 29, 2015 Contractor: Cache Valley Electric Covarian Med Permit type: Electrical | Permit status: In progress | Completion date: September 29, 2015 | Current use: Commercial | Permit id: Bld2015-07933 | |||||
SCORE 69 4 air handler over 100 cfm Date: September 29, 2015 Contractor: Alternative Mechanical Contractors Inc.Varian Permit type: Mechanical | Permit status: On-line ready | Completion date: September 29, 2015 | Current use: Commercial | Permit id: Bld2015-07920 | |||||
SCORE 64 Expansion of the clean room at varian medical. Replace and/or add additional fire alarm equipment consisting of four (4) duct smoke detectors and 16 a/v devices. All wiring to be class a. Date: August 20, 2015 Contractor: Simplexgrinnellvarian Medical Clean Room Permit type: Low voltage | Permit status: Inspections | Completion date: August 24, 2015 | Current use: Commercial | Permit id: Bld2015-06655 | |||||
SCORE 64 This is an addition to an existing system. We will be adding 2 manual pull stations, 2 duct smoke detectors and 23 multi-candela horn-strobes. Drawings will include new voltage drops, battery calculations, wiring and device placement. Date: August 17, 2015 Contractor: Simplexgrinnellvarian Expansion Ti Permit type: Low voltage | Permit status: Inspections | Completion date: September 10, 2015 | Current use: Commercial | Permit id: Bld2015-06546 | |||||
SCORE 64 Sprinklers Date: July 27, 2015 Contractor: Firetrol Protection Systemsclean Room Permit type: Fire | Permit status: Inspections | Completion date: September 11, 2015 | Current use: Commercial | Permit id: Bld2015-05768 | |||||
SCORE 64 Sprinklers Date: July 27, 2015 Permit type: Fire | Permit status: Corrections required | Completion date: August 21, 2015 | Current use: Commercial | Permit id: Bld2015-05761 | |||||
Remodel of the existing kitchen & servery. Removal of existing kitchen & server equipment, demolition of existing interior walls, construction of new walls and finishes and installation of new kitchen & servery equipment. Also includes upgrade of the mechanical system. Date: May 15, 2015 Permit type: Permit | Permit status: Corrections required | Completion date: August 7, 2015 | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 64 Varian customer owned electrical substation Date: April 14, 2015 Permit type: Permit | Permit status: Inspections | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-02462 | |||||
Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design / build sub-contractor. Date: March 26, 2015 Permit type: Permit | Permit status: Completed | Completion date: August 11, 2015 | Current use: Commercial | Permit id: Bld2015-01996 | |||||
SCORE 64 3 fire lines and 3 fire hydrants Date: February 13, 2015 Permit type: Fire | Permit status: In progress | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2015-01008 | |||||
SCORE 69 Install 3 boilers Date: February 10, 2015 Contractor: Alternative Mechanical Contractors Inc.Varian Permit type: Mechanical | Permit status: On-line ready | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2015-00923 | |||||
Sprinkler system Date: January 6, 2015 Permit type: Fire | Permit status: Completed | Completion date: April 10, 2015 | Current use: Commercial | Permit id: Bld2015-00086 | |||||
Install new facp and transponder with new devices in the new expansion of the existing building. Network facp and transponder to existing building fire alarm system. Date: December 17, 2014 Permit type: Low voltage | Permit status: Pass | Completion date: February 4, 2015 | Current use: Commercial | Permit id: Bld2014-09244 | |||||
Commercial electrical permit. Date: November 19, 2014 Permit type: Electrical | Permit status: In progress | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08549 | |||||
SCORE 64 Install waste, vent, water, gas piping, 1 water heater, and plumbing fixtures. Date: November 19, 2014 Permit type: Plumbing | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08554 | |||||
SCORE 64 Install 3 boilers, 2 cooling towers, 5 air handlers, 2 chillers, and 18 pumps. Date: November 19, 2014 Permit type: Mechanical | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08552 | |||||
Permit to remove excess mound dirt as per approved plan only. Date: September 5, 2014 Permit type: Site development | Permit status: In progress | Completion date: September 5, 2014 | Permit id: Bld2014-06442 | |||||
Fire alarm Date: July 29, 2014 Permit type: Low voltage | Permit status: Pass | Completion date: December 4, 2014 | Current use: Commercial | Permit id: Bld2014-05392 | |||||
Fire sprinklers d. W. Date: July 1, 2014 Permit type: Fire | Permit status: Pass | Completion date: October 6, 2014 | Current use: Commercial | Permit id: Bld2014-04618 | |||||
10-fixtures. Work cannot begin until bldg. Permit is issued. Date: June 25, 2014 Permit type: Plumbing | Permit status: Reviews not require | Completion date: June 25, 2014 | Current use: Commercial | Permit id: Bld2014-04479 | |||||
Work cannot begin until bldg permit is issued. Cleanroom wiring with associated distribution and equipment Date: June 25, 2014 Permit type: Electrical | Permit status: Pass | Completion date: October 16, 2014 | Current use: Commercial | Permit id: Bld2014-04462 | |||||
Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: June 19, 2014 Permit type: Permit | Permit status: Accepted - standard | Completion date: June 19, 2014 | Current use: Commercial | Permit id: Bld2014-04296 | |||||
This project is strictly a site utilities & rough grading project. It is related to the clean room project ( bld2014-03063 ) that is currently being reviewed for permit in that it gets gas and sewer lines to that portion of the site to support it and finishes the fire line loop. It is also to bring a new fiber optic line to the site and move some existing utilities out of the way of a near future addition to the building. Date: May 22, 2014 Permit type: Site development | Permit status: Completed | Completion date: September 18, 2014 | Permit id: Bld2014-03540 | |||||
Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: May 6, 2014 Permit type: Permit | Permit status: Completed | Completion date: June 30, 2014 | Current use: Commercial | Permit id: Bld2014-03063 | |||||
SCORE 64 Electrical for parking lot lighting. Date: June 24, 2011 Contractor: Dynalectric Companyvarian Medical Permit type: Electrical | Permit status: Closed | Completion date: July 11, 2011 | Current use: Commercial | Permit id: Bld2011-03867 | |||||
This project is a core & shell addition to the south end of the existing building. This addition utilizes steel framed structure with load bearing cmu walls. It consists of approximately 90,0 square feet for future manufacturing space (f-2) and 55,0 square feet for future (2) story office space (b). It is type iii-b construction; non-separated use to match the existing building. The parking is being expanded to provide approximately 2 addition parking spaces and some rework of the existing parking area near the east side of the existing building at the south end. A site utilities and rough grading permit (bld2014-03540) is currently in process in preparation for this new core & shell addition. Date: February 18, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04310 | |||||
No progress has been made on this application in over 1 days, application terminated for inaction. Remodel of the existing kitchen & servery. Removal of existing kitchen & server equipment, demolition of existing interior walls, construction of new walls and finishes and installation of new kitchen & servery equipment. Also includes upgrade of the mechanical system. Date: April 6, 2016 Permit status: Void | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 61 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: February 23, 2016 Contractor: Varian Clean Roomkraig Tolley Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04296 | |||||
SCORE 61 Varian customer owned electrical substation Date: June 2, 2015 Contractor: Varian Medical Substationdustin White Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-02462 | |||||
Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design / build sub-contractor. Date: January 25, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2015-01996 | |||||
Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: February 23, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03063 | |||||
Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: May 6, 2014 Permit status: Inspections | Completion date: June 30, 2014 | Current use: Commercial | Permit id: Bld2014-03063 | |||||
This project is strictly a site utilities & rough grading project. It is related to the clean room project ( bld2014-03063 ) that is currently being reviewed for permit in that it gets gas and sewer lines to that portion of the site to support it and finishes the fire line loop. It is also to bring a new fiber optic line to the site and move some existing utilities out of the way of a near future addition to the building. Date: May 22, 2014 Permit type: Site development | Permit status: Inspections | Completion date: September 18, 2014 | Permit id: Bld2014-03540 | |||||
SCORE 59 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: June 19, 2014 Contractor: Daw Technologies Llcvarian Clean Room Permit status: Inspections | Completion date: June 19, 2014 | Current use: Commercial | Permit id: Bld2014-04296 | |||||
SCORE 59 Work cannot begin until bldg permit is issued. Cleanroom wiring with associated distribution and equipment Date: June 25, 2014 Permit type: Electrical | Permit status: Closed | Completion date: October 16, 2014 | Current use: Commercial | Permit id: Bld2014-04462 | |||||
10-fixtures. Work cannot begin until bldg. Permit is issued. Date: June 25, 2014 Permit type: Plumbing | Permit status: Inspections | Completion date: June 25, 2014 | Current use: Commercial | Permit id: Bld2014-04479 | |||||
Fire sprinklers d. W. Date: July 1, 2014 Permit type: Fire | Permit status: Closed | Completion date: October 6, 2014 | Current use: Commercial | Permit id: Bld2014-04618 | |||||
Fire alarm Date: July 29, 2014 Permit type: Low voltage | Permit status: Closed | Completion date: December 4, 2014 | Current use: Commercial | Permit id: Bld2014-05392 | |||||
Permit to remove excess mound dirt as per approved plan only. Date: September 5, 2014 Permit type: Site development | Permit status: Inspections | Completion date: September 5, 2014 | Permit id: Bld2014-06442 | |||||
Commercial electrical permit. Date: November 19, 2014 Permit type: Electrical | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08549 | |||||
Install new facp and transponder with new devices in the new expansion of the existing building. Network facp and transponder to existing building fire alarm system. Date: December 17, 2014 Permit type: Low voltage | Permit status: Inspections | Completion date: February 4, 2015 | Current use: Commercial | Permit id: Bld2014-09244 | |||||
Sprinkler system Date: January 6, 2015 Permit type: Fire | Permit status: Inspections | Completion date: April 10, 2015 | Current use: Commercial | Permit id: Bld2015-00086 | |||||
Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design / build sub-contractor. Date: March 26, 2015 Permit status: Inspections | Completion date: August 11, 2015 | Current use: Commercial | Permit id: Bld2015-01996 | |||||
Remodel of the existing kitchen & servery. Removal of existing kitchen & server equipment, demolition of existing interior walls, construction of new walls and finishes and installation of new kitchen & servery equipment. Also includes upgrade of the mechanical system. Date: May 15, 2015 Permit status: In for review | Completion date: August 7, 2015 | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 61 Date: June 2, 2015 Contractor: Varian Medical Substationdustin White Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-02462 | |||||
SCORE 59 Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room in a portion of the existing fabrication plant. Date: February 23, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03063 | |||||
SCORE 59 Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design build sub-contractor. Date: January 25, 2016 Contractor: Varian Medical Systems Tenant Improvements Permit status: Closed | Current use: Commercial | Permit id: Bld2015-01996 | |||||
SCORE 59 Remodel of existing kitchen & servery at varian medical systems. Date: April 6, 2016 Permit status: Void | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 59 This project is a core & shell addition to the south end of the existing building. Date: February 18, 2016 Contractor: Varian Medical Systems Site Expansion Project Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04310 | |||||
SCORE 61 Date: February 23, 2016 Contractor: Varian Clean Roomkraig Tolley Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04296 | |||||
SCORE 59 This project is a core & shell addition to the south end of the existing building. Date: February 18, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-04310 | |||||
SCORE 64 Electrical for parking lot lighting. Date: June 24, 2011 Contractor: Dynalectric Companyvarian Medical Permit type: Electrical | Permit status: Closed | Completion date: July 11, 2011 | Current use: Commercial | Permit id: Bld2011-03867 | |||||
SCORE 59 Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: May 6, 2014 Permit status: Inspections | Completion date: June 30, 2014 | Current use: Commercial | Permit id: Bld2014-03063 | |||||
SCORE 59 This project is strictly a site utilities & rough grading project. It is related to the clean room project ( bld2014-03063 ) that is currently being reviewed for permit in that it gets gas and sewer lines to that portion of the site to support it and finishes the fire line loop. It is also to bring a new fiber optic line to the site and move some existing utilities out of the way of a near future addition to the building. Date: May 22, 2014 Permit type: Site development | Permit status: Inspections | Completion date: September 18, 2014 | Permit id: Bld2014-03540 | |||||
SCORE 59 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: June 19, 2014 Contractor: Daw Technologies, Llcvarian Clean Room Permit status: Inspections | Completion date: June 19, 2014 | Current use: Commercial | Permit id: Bld2014-04296 | |||||
SCORE 59 Work cannot begin until bldg permit is issued. Cleanroom wiring with associated distribution and equipment Date: June 25, 2014 Permit type: Electrical | Permit status: Closed | Completion date: October 16, 2014 | Current use: Commercial | Permit id: Bld2014-04462 | |||||
SCORE 59 10-fixtures. Work cannot begin until bldg. Permit is issued. Date: June 25, 2014 Permit type: Plumbing | Permit status: Inspections | Completion date: June 25, 2014 | Current use: Commercial | Permit id: Bld2014-04479 | |||||
SCORE 59 Fire sprinklers d. W. Date: July 1, 2014 Permit type: Fire | Permit status: Closed | Completion date: October 6, 2014 | Current use: Commercial | Permit id: Bld2014-04618 | |||||
SCORE 59 Fire alarm Date: July 29, 2014 Permit type: Low voltage | Permit status: Closed | Completion date: December 4, 2014 | Current use: Commercial | Permit id: Bld2014-05392 | |||||
SCORE 59 Permit to remove excess mound dirt as per approved plan only. Date: September 5, 2014 Permit type: Site development | Permit status: Inspections | Completion date: September 5, 2014 | Permit id: Bld2014-06442 | |||||
SCORE 59 Commercial electrical permit. Date: November 19, 2014 Permit type: Electrical | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08549 | |||||
SCORE 64 Install 3 boilers, 2 cooling towers, 5 air handlers, 2 chillers, and 18 pumps. Date: November 19, 2014 Permit type: Mechanical | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08552 | |||||
SCORE 64 Install waste, vent, water, gas piping, 1 water heater, and plumbing fixtures. Date: November 19, 2014 Permit type: Plumbing | Permit status: Inspections | Completion date: November 19, 2014 | Current use: Commercial | Permit id: Bld2014-08554 | |||||
SCORE 59 Install new facp and transponder with new devices in the new expansion of the existing building. Network facp and transponder to existing building fire alarm system. Date: December 17, 2014 Contractor: Simplexgrinnell Lpvarian Expansioncore And Shell Permit type: Low voltage | Permit status: Inspections | Completion date: February 4, 2015 | Current use: Commercial | Permit id: Bld2014-09244 | |||||
SCORE 59 Sprinkler system Date: January 6, 2015 Contractor: Firetrol Protection Systemsvmsaddition Permit type: Fire | Permit status: Inspections | Completion date: April 10, 2015 | Current use: Commercial | Permit id: Bld2015-00086 | |||||
SCORE 69 Install 3 boilers Date: February 10, 2015 Contractor: Alternative Mechanical Contractors Inc.Varian Permit type: Mechanical | Permit status: Inspections | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2015-00923 | |||||
SCORE 64 3 fire lines and 3 fire hydrants Date: February 13, 2015 Permit type: Fire | Permit status: Inspections | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2015-01008 | |||||
SCORE 59 Tenant improvements in the previously permitted varian core & shell addition include: 28,943 square foot of first floor office tenant improvements, 20,0 square foot clean room improvements in the existing fabrication space & installing new carpet and shades in the cafeteria addition. The clean room design is a deferred submittal from a design build sub-contractor. Date: March 26, 2015 Permit status: Inspections | Completion date: August 11, 2015 | Current use: Commercial | Permit id: Bld2015-01996 | |||||
SCORE 64 Varian customer owned electrical substation Date: April 14, 2015 Permit status: Inspections | Completion date: June 2, 2015 | Current use: Commercial | Permit id: Bld2015-02462 | |||||
SCORE 59 Remodel of the existing kitchen & servery. Removal of existing kitchen & server equipment, demolition of existing interior walls, construction of new walls and finishes and installation of new kitchen & servery equipment. Also includes upgrade of the mechanical system. Date: May 15, 2015 Permit status: In for review | Completion date: August 7, 2015 | Current use: Commercial | Permit id: Bld2015-03411 | |||||
SCORE 64 Sprinklers Date: July 27, 2015 Permit type: Fire | Permit status: In for review | Completion date: August 21, 2015 | Current use: Commercial | Permit id: Bld2015-05761 | |||||
SCORE 64 Sprinklers Date: July 27, 2015 Contractor: Firetrol Protection Systemsclean Room Permit type: Fire | Permit status: Inspections | Completion date: September 11, 2015 | Current use: Commercial | Permit id: Bld2015-05768 | |||||
SCORE 64 This is an addition to an existing system. We will be adding 2 manual pull stations, 2 duct smoke detectors and 23 multi-candela horn-strobes. Drawings will include new voltage drops, battery calculations, wiring and device placement. Date: August 17, 2015 Contractor: Simplexgrinnellvarian Expansion Ti Permit type: Low voltage | Permit status: Inspections | Completion date: September 10, 2015 | Current use: Commercial | Permit id: Bld2015-06546 | |||||
SCORE 64 Expansion of the clean room at varian medical. Replace and or add additional fire alarm equipment consisting of four (4) duct smoke detectors and 16 a v devices. All wiring to be class a. Date: August 20, 2015 Contractor: Simplexgrinnellvarian Medical Clean Room Permit type: Low voltage | Permit status: Inspections | Completion date: August 24, 2015 | Current use: Commercial | Permit id: Bld2015-06655 | |||||
SCORE 69 4 air handler over 100 cfm Date: September 29, 2015 Contractor: Alternative Mechanical Contractors Inc.Varian Permit type: Mechanical | Permit status: Inspections | Completion date: September 29, 2015 | Current use: Commercial | Permit id: Bld2015-07920 | |||||
SCORE 59 Elect. 429,990. 67 Date: September 29, 2015 Contractor: Cache Valley Electric Covarian Med Permit type: Electrical | Permit status: Inspections | Completion date: September 29, 2015 | Current use: Commercial | Permit id: Bld2015-07933 | |||||
SCORE 64 Install new facp and connect to existing network of fire alarm panels. Add devices as shown on drawings for the core and shell of the cafeteria. Provide outputs to the bas system, coordinate signals needed with bas contractor. Date: November 19, 2015 Contractor: Simplexgrinnellvarian Medical Cafeteria Phase 1 Permit type: Low voltage | Permit status: In for review | Completion date: November 23, 2015 | Current use: Commercial | Permit id: Bld2015-10059 |