Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installing 13x33 tent structure on rooftop patio outside skybar. Temporary structure from may 31st to octuber 31st. Shall be white. Date: May 24, 2012 Client: Lipnick | Applicant: Lipnick; Boursiquot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200134 | |||||
Install new h v a c units in one hundred and thirty rooms of existing hotel interior work only as per plans Date: June 4, 2013 Applicant: James Shelton | Permit type: Addition alteration | Permit status: Permit issued | Permit id: B1305958 | |||||
Boiler Date: July 12, 2013 Applicant: George R Dunn | Permit status: Permit issued | Permit id: Up1300082 | |||||
Placing inner duct between existing verizon manholes. July 11, 2014 û august 11, 2014, 7pm û 2am. Evenings ? Weekends Date: July 15, 2014 Client: Comcast Cable | Applicant: Michael Sonesen | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400579 | |||||
Install 13 x 33 temporary awning on rooftop patio outside skybar. Temporary tent/awning from april 15, 2014 to october 15, 2014. Tent/awning shall be white. Date: February 7, 2014 Applicant: James Shelton | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300265 | |||||
Two (2) cabs-new cambridge mesh wall panels with j-binders. New st/st rose front & rear walls cad w #4 st 5 st 1 est. Cost of work 47,900. 00 Date: September 24, 2014 Applicant: Elevator Modernization Co Inc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403128 | |||||
SCORE 92 Boiler Date: July 12, 2013 Contractor: George R Dunn Permit status: Permit issued | Permit id: Up1300082 | |||||
SCORE 92 Boiler Date: July 12, 2013 Contractor: George R Dunn Permit status: Permit issued | Permit id: Up1300082 | |||||
SCORE 56 Installing 13x33 tent structure on rooftop patio outside skybar. Temporary structure from may 31st to octuber 31st. Shall be white. Date: May 24, 2012 Contractor: Lipnick Boursiquot Client: Lipnick | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200134 | |||||
SCORE 97 Install new h v a c units in one hundred and thirty rooms of existing hotel interior work only as per plans Date: June 4, 2013 Contractor: James Shelton Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1305958 | |||||
SCORE 89 Placing inner duct between existing verizon manholes. July 11, 2014 august 11, 2014, 7pm 2am. Evenings ? Weekends Date: July 15, 2014 Contractor: Michael Sonesen Client: Comcast Cable | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400579 | |||||
SCORE 56 Installing 13x33 tent structure on rooftop patio outside skybar. Temporary structure from may 31st to octuber 31st. Shall be white. Date: May 24, 2012 Contractor: Lipnick; Boursiquot Client: Lipnick | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200134 | |||||
SCORE 92 Boiler Date: July 12, 2013 Contractor: George R Dunn Permit status: Permit issued | Permit id: Up1300082 | |||||
SCORE 62 Setup a 14x34 frame tent on the rooftop patio of the beacon hotel for special events from april 28 thru october 31,2015 times and dates vary. Date: May 6, 2015 Contractor: Beacon Hotel; Rick Seymour Event Site Services Client: Beacon Hotel | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1500107 | |||||
SCORE 62 Erect a 14x34 frame tent on the rooftop for special events. From 4-1-2016 to 9-31-2016. Date: April 5, 2016 Contractor: Beacon Hotel; Rick Seymour Event Site Services Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600097 | |||||
SCORE 56 Erect a 14x34 tent on the rooftop terrace for special events. Roof top occupant load approved for people maximum seating only or 49 people maximum standing. Date: April 18, 2017 Client: Beacon Beacon Hotel | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1700088 | |||||
SCORE 97 Install 13 x 33 temporary awning on rooftop patio outside skybar. Temporary tent/awning from april 15, 2014 to october 15, 2014. Tent/awning shall be white. Date: February 7, 2014 Contractor: James Shelton Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300265 | |||||
SCORE 89 Two (2) cabs-new cambridge mesh wall panels with j-binders. New st/st rose front & rear walls cad w #4 st 5 st 1 est. Cost of work 47,900. 00 Date: September 24, 2014 Contractor: Elevator Modernization Co Inc Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403128 |