Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Addition permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 45995 | |||||
Alteration permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 364878 | |||||
Alteration permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 127007 | |||||
Mechanical permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 205539 | |||||
Electrical permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 146761 | |||||
Plumbing permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 146345 | |||||
Alteration permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 364878 | |||||
Mechanical permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 205539 | |||||
Alteration permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 127007 | |||||
Plumbing permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 146345 | |||||
Addition permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 45995 | |||||
Electrical permit Client: Ostroff Loren G Ostroff Jordana A | Permit status: Completed | Permit id: 146761 | |||||
SCORE 96 Reface brick front on existing foundation Client: Stroff Loren G Ostroff Jordana A | Permit type: Alteration permit | Permit status: Completed | Completion date: December 11, 2012 | Permit id: 428203 | |||||
To erect a 3 story addition and a 3rd floor addition as per attached plans as part of a single family dwelling Client: Stroff Loren G Ostroff Jordana A | Permit type: Addition permit | Permit status: Completed | Completion date: April 6, 2009 | Permit id: 45995 | |||||
Amend existing building permit # 45995 as per attached plans Client: Stroff Loren G Ostroff Jordana A | Permit type: Alteration permit | Permit status: Completed | Completion date: April 29, 2008 | Permit id: 127007 | |||||
SCORE 99 Rough in water supply line through out building to all fixtures (in pex), rough in soil and waste piping to all fixtures, through out inside of building, rough would include 3 lavy, 3 water closets, 1 tub, 1 shower and 1 kitchen sink Client: Stroff Loren G Ostroff Jordana A | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 27, 2009 | Permit id: 146345 | |||||
SCORE 100 2 amp service, circuit panel. Rewire house in accordance with 2005 nec Client: Stroff Loren G Ostroff Jordana A | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 146761 | |||||
SCORE 100 Replace 3 4 water distribution Client: Stroff Loren G Ostroff Jordana A | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 15, 2008 | Permit id: 157009 | |||||
SCORE 100 Install 2 hvac units (sfd) Client: Stroff Loren G Ostroff Jordana A | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 6, 2009 | Permit id: 205539 | |||||
SCORE 96 Stucco__exterior plaster. Installation of these materials shall be in compliance withastmc926 andastmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 11 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Client: Stroff Loren G Ostroff Jordana A | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2012 | Permit id: 364878 |