Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: June 12, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 217198 | |||||
Electrical permit Date: April 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 274119 | |||||
Suppression permit Date: February 1, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 385928 | |||||
Alteration permit Date: September 17, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 101958 | |||||
Administrative permit Date: November 4, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 242355 | |||||
Alteration permit Date: December 12, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 506131 | |||||
Suppression permit Date: May 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 280699 | |||||
Electrical permit Date: April 12, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 335196 | |||||
Operations permit Date: June 25, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 9811 | |||||
Suppression permit Date: January 28, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 587050 | |||||
Electrical permit Date: January 16, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 193450 | |||||
Electrical permit Date: January 29, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 517242 | |||||
Fast form building permit Date: September 29, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 239903 | |||||
Zoning/use permit Date: September 11, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 483527 | |||||
Plumbing permit Date: December 19, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 511432 | |||||
Fast form building permit Date: June 26, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 85802 | |||||
Electrical permit Date: April 30, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 468196 | |||||
Mechanical permit Date: July 20, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 625857 | |||||
Electrical permit Date: May 2, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 149220 | |||||
Mechanical permit Date: February 19, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 514705 | |||||
Electrical permit Date: March 1, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 386596 | |||||
Mechanical permit Date: December 7, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 223645 | |||||
Mechanical permit Date: October 19, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 433647 | |||||
Plumbing permit Date: June 17, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 221253 | |||||
Electrical permit Date: August 21, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Expired | Permit id: 633570 | |||||
Alteration permit Date: November 23, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 312165 | |||||
Suppression permit Date: January 27, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 516730 | |||||
Alteration permit Date: December 4, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 652930 | |||||
Alteration permit Date: April 24, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 145173 | |||||
Electrical permit Date: January 27, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Expired | Permit id: 657256 | |||||
Alteration permit Date: December 12, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 375176 | |||||
Mechanical permit Date: December 21, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 379811 | |||||
Administrative permit Date: September 16, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 639175 | |||||
Suppression permit Date: December 30, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 513485 | |||||
Suppression permit Date: January 11, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 662803 | |||||
Mechanical permit Date: April 5, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 463352 | |||||
Suppression permit Date: December 22, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 380093 | |||||
Suppression permit Date: September 13, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 91396 | |||||
Fast form building permit Date: May 5, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150023 | |||||
Alteration permit Date: November 21, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 431848 | |||||
Alteration permit Date: January 14, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 512364 | |||||
Sign permit Date: January 8, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 512505 | |||||
Demolition permit Date: November 25, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 654528 | |||||
Plumbing permit Date: October 17, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 368923 | |||||
Mechanical permit Date: June 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 286590 | |||||
Alteration permit Date: April 7, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 678987 | |||||
Mechanical permit Date: May 7, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150684 | |||||
Plumbing permit Date: July 24, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 626705 | |||||
Electrical permit Date: October 5, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 107492 | |||||
Plumbing permit Date: May 7, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150701 | |||||
Plumbing permit Date: June 28, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 413838 | |||||
Electrical permit Date: October 27, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 244669 | |||||
Alteration permit Date: November 23, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 312165 | |||||
Electrical permit Date: August 10, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 339950 | |||||
Fast form building permit Date: June 26, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 85802 | |||||
Suppression permit Date: April 3, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 462744 | |||||
Suppression permit Date: May 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 280699 | |||||
Electrical permit Date: April 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 274119 | |||||
Fast form building permit Date: June 4, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 219346 | |||||
Mechanical permit Date: June 21, 2010 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 286590 | |||||
Electrical permit Date: October 18, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Expired | Permit id: 432687 | |||||
Electrical permit Date: January 27, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Expired | Permit id: 657256 | |||||
Mechanical permit Date: December 21, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 379811 | |||||
Plumbing permit Date: December 19, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 511409 | |||||
Mechanical permit Date: October 19, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 433647 | |||||
Plumbing permit Date: June 17, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 221253 | |||||
Electrical permit Date: February 27, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 593167 | |||||
Mechanical permit Date: September 18, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 237815 | |||||
Alteration permit Date: September 15, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 235436 | |||||
Suppression permit Date: February 1, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 385928 | |||||
Electrical permit Date: June 12, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 154604 | |||||
Electrical permit Date: December 31, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 513659 | |||||
Electrical permit Date: July 18, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 84420 | |||||
Mechanical permit Date: August 11, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 629000 | |||||
Fast form building permit Date: May 5, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150023 | |||||
Alteration permit Date: January 6, 2017 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 745644 | |||||
Mechanical permit Date: July 11, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 482465 | |||||
Demolition permit Date: December 6, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 741541 | |||||
Suppression permit Date: January 27, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 516730 | |||||
Mechanical permit Date: May 7, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150684 | |||||
Alteration permit Date: January 23, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 383569 | |||||
Alteration permit Date: November 19, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 497336 | |||||
Administrative permit Date: November 4, 2009 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 242355 | |||||
Electrical permit Date: January 17, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 515764 | |||||
Mechanical permit Date: February 19, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 514705 | |||||
Alteration permit Date: April 24, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 145173 | |||||
Zoning use permit Date: September 11, 2013 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 483527 | |||||
Suppression permit Date: June 26, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 620828 | |||||
Alteration permit Date: January 14, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 512364 | |||||
Operations permit Date: June 25, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 9811 | |||||
Plumbing permit Date: October 17, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 368923 | |||||
Plumbing permit Date: July 24, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 626705 | |||||
Alteration permit Date: August 11, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 623513 | |||||
Suppression permit Date: December 22, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 380093 | |||||
Suppression permit Date: January 11, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 662803 | |||||
Administrative permit Date: September 16, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 639175 | |||||
Demolition permit Date: November 25, 2015 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 654528 | |||||
Suppression permit Date: September 13, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 91396 | |||||
Sign permit Date: January 8, 2014 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 512505 | |||||
Alteration permit Date: September 17, 2007 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 101958 | |||||
Alteration permit Date: December 12, 2011 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 375176 | |||||
Alteration permit Date: April 7, 2016 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 678987 | |||||
Plumbing permit Date: May 7, 2008 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 150701 | |||||
Plumbing permit Date: June 28, 2012 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Completed | Permit id: 413838 | |||||
Suppression permit Date: January 24, 2017 Client: Four Penn Center Owner Ll | Client Company: Four Penn Ctr Owner Llc | Permit status: Active | Permit id: 754054 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 20, 2015 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 625857 | |||||
SCORE 95 Furnish and install 2 duplex recepts, 2 tlte data stubs, 5 fix, and 5 furniture feeds as per 2008 nec(commercial)(cc dist) Date: March 1, 2012 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 23, 2012 | Permit id: 386596 | |||||
SCORE 82 Fit out of commercial space and install cat 5 data lines as per 2008 nec Date: May 6, 2011 Contractor: Harry J Beck Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: May 6, 2011 | Permit id: 327647 | |||||
Furnish and install one duct system Date: June 21, 2010 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 286590 | |||||
SCORE 100 Remove 1 3 ton water cooled heat pumo. Install 1 new 3 ton water cooled heat pump in same location. All whitin existing tenant space. No penetration of fire rated assemblies Date: July 11, 2013 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 16, 2013 | Permit id: 482465 | |||||
SCORE 100 Relocate 6 sprinklers on the 11th floor (merrill lynch space) Date: April 3, 2013 Contractor: Oliver Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: November 1, 2013 | Permit id: 462744 | |||||
SCORE 100 Relocate 3 diffusers Date: April 5, 2013 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 24, 2013 | Permit id: 463352 | |||||
SCORE 100 Relocate 9-exist 2x4 tube deep cell t-8 cell fixtures, 1-exit lgts, 2-ceiling sensors, 5-new exit lights, 3-ceiling mount occup sensors & rel 2-f a devices no addl wire as per nec 2008&nfpa 72 (multi office bldg) Date: April 30, 2013 Contractor: Metro Electric Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 12, 2013 | Permit id: 468196 | |||||
SCORE 100 Fast form building permit Date: June 26, 2007 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit status: Completed | Completion date: August 17, 2007 | Permit id: 85802 | |||||
SCORE 65 Convert existing dry standpipes to wet per fire dept. S approval. Date: September 13, 2007 Contractor: Triad Fire Protection Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: May 7, 2008 | Permit id: 91396 | |||||
SCORE 100 Retail store-piping and installation 1 handsink & relocatea length of 10"2 water line Date: October 17, 2011 Contractor: Grand General Contractor Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 23, 2012 | Permit id: 368923 | |||||
SCORE 100 Interior alterations for office building as per plan. Date: December 12, 2011 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2012 | Permit id: 375176 | |||||
SCORE 100 Relocate (10) diffusers. Date: December 21, 2011 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 379811 | |||||
SCORE 100 Installation of 1-1 1 2 emt conduit from the panel to the bts cabinet w 3 #6 & 1-10#thwn grounding conductor. Installation of 1-2pole 50amp circuit breaker as per 2008 nec (commercial) Date: June 1, 2012 Contractor: Mjk Electrical Corporation Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 26, 2012 | Permit id: 403873 | |||||
SCORE 95 Office space-furnish and install 3 speaker strobes Date: March 2, 2012 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 31, 2012 | Permit id: 385506 | |||||
SCORE 95 Furnish and install all necessary power,lighting and voice data cabling as per 2008 nec (cc district) Date: February 27, 2015 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 587076 | |||||
SCORE 100 Installation of 2- pantry sinks and 2- floor drains, connect to existing sanitary, vent and domestic water Date: February 4, 2015 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 587103 | |||||
SCORE 95 Furnish and install new fa devices per 2008 & nfpa 72 (office space) Date: March 9, 2015 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 591883 | |||||
SCORE 100 Provide and install 2 cat6 plenum cables @ 1 average on the 16th and 17th floor. Provide and install 125 cat6 plenum cables @ 1 average on the 18th floor. All cabling to installed with j hooks per nec 2008. All penetration will be fire stopped per nec 2008 Date: September 5, 2017 Contractor: Lanconnect Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 777096 | |||||
SCORE 100 Renovation to existing space for new tenant. Relocate (12) light fixtures,install (8) light fixtures,(23) receptacles,(6) wall switches, (11) furniture feeds,reuse existing circuits from demolation,all as per 2005 nec (cc dist) Date: November 2, 2009 Contractor: New Light Electric Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 4, 2009 | Permit id: 239981 | |||||
SCORE 100 Amendment to permit# 238525 as per plans Date: November 4, 2009 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 1, 2009 | Permit id: 242355 | |||||
SCORE 89 Tenant fit out for professional office business space. Date: April 8, 2015 Contractor: Spirk Brothers Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 593096 | |||||
SCORE 95 F i 1 wall os, relocate 2 2x4 fixtures2 furniture feeds, 1 receptacles & 1 quad. Date: February 27, 2015 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 593167 | |||||
For interior alterations using the prescriptive compliance method on the 16th, 17th, and 18th floors of an existing high-rise structure for fit-out of new office tenants (no change in occupancy), as per plans; separate permits required for any and all mechanical, electrical, plumbing, and fire suppression work; building is fully sprinklered. Date: January 6, 2017 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 745644 | |||||
SCORE 100 Level ii alteration to include non-load bearing renovations and reflected ceiling as per plan. Date: April 7, 2016 Contractor: Mj Settelen Construction Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 2, 2016 | Permit id: 678987 | |||||
SCORE 95 Power to 3 furniture stations,4 receptacles,1 new exit sign,6 remove and relocate 2x4s,power to conference room per 2008 nec (office space)cc district Date: November 14, 2016 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 736368 | |||||
Use as a proposed dunkin donuts.. Take out restaurant store with seating on 1st flr, space 1 within an existing vacant tenant space. Removal of an existing flat wall sign and replace. Date: September 11, 2013 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 11, 2013 | Permit id: 483527 | |||||
SCORE 95 Furnish & install & power, receptacles, fixtures & switches in existing as per nec 2008 cc district Date: September 1, 2017 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 806928 | |||||
SCORE 100 For the installation of registers, diffusers and appliances with associated ductwork on the 11th floor of an exisitng high rise. Appliances to be installed in accordance with manufacturers specifications. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: August 24, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: September 11, 2017 | Permit id: 809805 | |||||
SCORE 100 Tenant is updatin existing fixtures & finishes variou rooms, replace 6-fixtures, relocate 2-recpt, install 2-data pull strings & remove & replace in same location 1-existing speaker strobe as per nec 2008 & nfpa 72 (high rise office bldg) Date: December 21, 2012 Contractor: Cobra Electric Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2013 | Permit id: 444967 | |||||
SCORE 100 Fast form building permit Date: May 5, 2008 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit status: Completed | Completion date: October 28, 2008 | Permit id: 150023 | |||||
SCORE 89 Install 7-light fixtures, 2-single pole switches, relocate 4 switches, 12-receptacles, 1-dishwasher, 2-furniture systems, 1-exhaust fan. All in accordance with 2005 nec. No voice data or fire alarm on theis permit. Date: May 2, 2008 Contractor: Crystal Ball Contracting Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2010 | Permit id: 149220 | |||||
Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 25, 2015 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: February 13, 2016 | Permit id: 654528 | |||||
SCORE 100 Tenant fit-out in accordance with attached plans Date: October 15, 2009 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 238525 | |||||
SCORE 56 Alterations to existing offices to create 12 offices as per plans Date: November 21, 2012 Contractor: O A Peterson Construction Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: August 13, 2013 | Permit id: 431848 | |||||
SCORE 87 Interior alterations as per plans Date: June 18, 2007 Contractor: Partridge Architects Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: August 20, 2007 | Permit id: 80458 | |||||
SCORE 100 Fixture installation Date: June 17, 2009 Contractor: John Uebele Jr Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 19, 2009 | Permit id: 221253 | |||||
SCORE 95 (36) downlights, (29) duplex receptacles, (3) exit signs, (4) dimmers, (4) 3-way switches, (1) occupancy sensor, (1) gfi, (5) single pole switches, as per 2005 nec (cc dist) Date: July 8, 2009 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: February 4, 2010 | Permit id: 221256 | |||||
SCORE 99 Install new data location to each existing work space as per 2005 nec (cc district) Date: September 9, 2009 Contractor: Mnm Group Inc The Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 15, 2010 | Permit id: 223287 | |||||
SCORE 100 1 air handler, ductwork, grilles, registers and diffusers per plans. Ul listed flexible air duct, permanently supported and no sharp turns. Date: December 7, 2009 Contractor: Direct Air Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 5, 2010 | Permit id: 223645 | |||||
To amend previously issued permit ap#745644 to revise scope of work as per plans and architects statement; changes to layout of offices on 16th, 17th, and 18th floors of an existing high-rise building; separate permits required for any and all mechanical, electrical, plumbing, and fire suppression work; building is fully sprinklered. Date: February 15, 2017 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2017 | Permit id: 752030 | |||||
SCORE 100 Replace the existing fire alarm panel(s) and initiation devices utilzing existing wiring and notification devices as per nfpa72 (cc district) Date: February 15, 2017 Contractor: Charles H Macdonald Electric I Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: February 15, 2017 | Permit id: 757174 | |||||
SCORE 96 Termination only of cables, cat 5e plenum rated and testing, longest run 1 as per 2005 nec (cc district) Date: February 3, 2009 Contractor: James Carrigan Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: February 3, 2009 | Permit id: 199396 | |||||
SCORE 99 Relocate 7 diffusers registers (11th floor) Date: February 9, 2009 Contractor: William Cowden Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 13, 2009 | Permit id: 199925 | |||||
SCORE 100 Tenant fit-out at partial 3rd floor per submitted sealed plans. Single tenant. Noncombustible construction only. Date: March 27, 2009 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 4, 2009 | Permit id: 206203 | |||||
Interior office alterations. Add offices with partitions add file area to plan add furniture storage to conf. Area and millwork as per plans. Date: June 12, 2009 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 5, 2010 | Permit id: 217198 | |||||
SCORE 100 Relocate (16) existing sprinkler heads in order to accommodate tenant layouts as per all nfpa no. 13 and local codes. Date: June 26, 2015 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 620828 | |||||
SCORE 100 Relocate 8 existing sprinkler heads (commercial) Date: August 29, 2017 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 812039 | |||||
SCORE 100 For the installation of a mechanical system to include registers diffusers, supply exhaust ductwork, and appliances as per approved plans. Separate permit required for electrical and plumbing work. Date: October 30, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: November 20, 2017 | Permit id: 825179 | |||||
SCORE 86 Light & power per plans, no low voltage work, panels existing. Date: July 18, 2007 Contractor: Kelleher Paul Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 27, 2007 | Permit id: 84420 | |||||
SCORE 96 Install 4 category 5e plenum rated data cables from exsisting server room to new communications outlets Date: May 13, 2015 Contractor: Jw Carrigan Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 29, 2015 | Permit id: 609978 | |||||
SCORE 96 3rd floor (stroll) structured cabling system cat 5e cable to locations Date: September 28, 2009 Contractor: James Carrigan Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2009 | Permit id: 239574 | |||||
SCORE 100 Relocate 15 diffusers registers(12th floor, spec suite) Date: October 6, 2009 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 25, 2010 | Permit id: 241095 | |||||
SCORE 100 Relocate (3) existing sprinkler heads in order to accommodate tenant layout and ceilings as per nfpa no. 13 and all local code. Date: December 11, 2015 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: April 13, 2016 | Permit id: 657552 | |||||
SCORE 100 Tenant fit-out as per plans Date: September 15, 2009 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 233271 | |||||
SCORE 95 Install 1 strobe, 1 relay module & relocate 1 speaker strobe. Date: September 15, 2009 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 8, 2012 | Permit id: 233903 | |||||
SCORE 100 Tenant fit-out as per approved plans. Date: September 15, 2009 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 22, 2010 | Permit id: 235436 | |||||
SCORE 100 Relocate (5) diffusers Date: September 18, 2009 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 21, 2009 | Permit id: 237815 | |||||
SCORE 99 Install 12 phone lines to manager office & front counter from phone board as per nec 2008 (comm) Date: January 30, 2014 Contractor: The Williams Group Electrical Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 517442 | |||||
Interior alterations ,interior demo, renovations ,upgrades to finishes. Existing office building no change in use occupancy - co attached only for updating records. Additional permits for meps and sprinklers, any new signs. Date: January 26, 2015 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 583367 | |||||
SCORE 100 Interior renovations to office space as per plan. Date: September 17, 2007 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: December 4, 2008 | Permit id: 101958 | |||||
SCORE 93 Install 15 receptacles, 11 switches & 2 furniture connections. Date: January 16, 2009 Contractor: Tritech Systems Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2009 | Permit id: 193450 | |||||
SCORE 100 Relocate 14 sprinkler heads. (multi story office) Date: December 22, 2011 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 380093 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 6, 2017 Contractor: Fields Fire Protection Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Active | Completion date: June 27, 2017 | Permit id: 789505 | |||||
SCORE 89 Bank of america door addition as per attached plans Date: May 25, 2017 Contractor: Spirk Brothers Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: August 4, 2017 | Permit id: 778758 | |||||
SCORE 95 Remove and reset 3 fire alarm devices as per nfpa 72 Date: June 27, 2017 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 784237 | |||||
SCORE 95 Install power to supply furniture and added receptacles as per 2008 nec (cc district) Date: June 26, 2017 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 10, 2017 | Permit id: 785852 | |||||
SCORE 100 Relocation 16 sprinkler heads. No piping changes permitted on this permit. Date: February 1, 2012 Contractor: Independence Fire Sprinkler Co Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 385928 | |||||
SCORE 100 Fast form building permit Date: July 7, 2009 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit status: Completed | Completion date: October 4, 2009 | Permit id: 225146 | |||||
SCORE 100 Renovation to existing space for new tenant. Relocate (10) light fixtures, install (6) wall switches, (10) receptacles, re-use existing circuits made spare from demolition, no anticipated change in load, as per 2005 nec (cc dist) Date: July 10, 2009 Contractor: New Light Electric Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2009 | Permit id: 225821 | |||||
SCORE 100 Interior non-load bearing demolition Date: December 6, 2016 Contractor: Mj Settelen Construction Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 741541 | |||||
SCORE 100 Level ii alterations include interior non load bearing renovations. Date: December 4, 2015 Contractor: Mj Settelen Construction Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 24, 2016 | Permit id: 652930 | |||||
Amend permit 6185 to correct address from 16 market street to 16 jfk boulevard also known as 4 penn center. Date: September 16, 2015 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 639175 | |||||
SCORE 89 Add 1 audio visual fire alarm device. Date: June 12, 2008 Contractor: Crystal Ball Contracting Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 154604 | |||||
SCORE 100 Tenant fit out in partial areas on 3rd floor and small office on the 4th floor as per plans. Separate permits required for plumbing and electrical. Date: April 24, 2008 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2008 | Permit id: 145173 | |||||
SCORE 100 Erect tent in courtyard ( x 60) on 6 26 2008 Date: June 25, 2008 Contractor: Select Event Rentals Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Operations permit | Permit status: Completed | Permit id: 9811 | |||||
SCORE 100 Interior alteration to existing office spaces, reconfigurating cafe and vending areas. Date: November 23, 2010 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 24, 2011 | Permit id: 312165 | |||||
SCORE 100 2 200a feeders existing. Install lighting, receptacles, switches, appliance connections per plans. Date: June 9, 2011 Contractor: Joseph Stepp Jr Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: June 9, 2011 | Permit id: 329868 | |||||
SCORE 95 3 duplex receptacles as per 2008 nec (cc district) Date: April 21, 2010 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 8, 2012 | Permit id: 274119 | |||||
SCORE 100 Furnish and install (16) additional speakers in the stairwell and (2) speakers in the machine rooms. Speakers are to be fed from the existing speaker circuits throughout the building as per nfpa-72 (cc dist) Date: October 27, 2010 Contractor: Electracom Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: November 1, 2010 | Permit id: 284685 | |||||
SCORE 95 Partial 9th floor electrical alterations - furnish and install receptacles, duplex recepticals, gfis, poke-thrus, furniture feeds, re-work the luminaire layout and wiring for a hot water heater - the installation will be in compliance with the 2008 nec Date: June 26, 2015 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: June 26, 2015 | Permit id: 620694 | |||||
SCORE 100 For the installation of two air handlers, fifteen (15) registers diffusers and associated duct work in tenant space #1 per approved plans. Separate permit required for kitchen hoods, electrical, plumbing, fire suppression. Date: February 19, 2014 Contractor: Direct Air Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 27, 2014 | Permit id: 514705 | |||||
SCORE 100 Level 2 alterations to the 11th floor of an existing high rise structure. Space for continued use as business and professional offices. Work to include demolition and erection of new non-bearing partitions, doors, ceiling grid and tiles, new finishes and new furnishings. Separate permit required for plumbing, mechanical and electrical work. Date: August 24, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 806499 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 9, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 806767 | |||||
SCORE 100 Installation of a 16-9" x 1-11. 625" internally illuminated flat wall sign per submitted plan. Separate electric permit required. Date: January 8, 2014 Contractor: Futura Identities Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Sign permit | Permit status: Completed | Completion date: February 6, 2014 | Permit id: 512505 | |||||
Interior alterations to construct non load bearing partitions and upgrades to finishes as per approved plans. Separate permit required for mechanical electrical and plumbing work. Date: January 14, 2014 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 512364 | |||||
SCORE 100 Furnish and install 42 new category 6 plenum cables. Provide labor to relocate 58 existing category 6 plenum cables for new layout. Average cable pull for new cables 1 feet per 2008 nec (office space)cc district Date: January 27, 2016 Contractor: Belles Electrical Contractors Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 657256 | |||||
SCORE 100 Level 2 alterations to the 7th floor of an existing high rise structure. Space for continued use as business and professional offices. Work to include demolition and erection of new non-bearing partitions, doors, ceiling grid and tiles, new finishes and new furnishings. Separate permit required for plumbing, mechanical and electrical work. Date: August 24, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 806497 | |||||
SCORE 100 Relocate 4 registers diffusers - 3rd floor chubb office Date: May 7, 2008 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 150684 | |||||
SCORE 100 Extend the existing initiating circuit to the locations of the new sprinkler devices installed. Install addressable control modules to monitor the new sprinkler devices (cc dist) Date: May 13, 2008 Contractor: Electracom Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: May 13, 2008 | Permit id: 142182 | |||||
SCORE 100 Relocate (111) existing sprinkler heads in order to accommodate tenant layouts as per nfpa no. 13 and all local codes. Date: January 24, 2017 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 754054 | |||||
SCORE 100 Level ii alterations. Interior alterations to include new construction installation of new partitions & doors, ceiling grid and ceiling tiles, and upgrade to finishes. All work shall be in accordance with approved plans. Separate permit required for mechanical, electrical, and plumbing work. Date: April 5, 2013 Contractor: Dlauro And Rodgers Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 1, 2013 | Permit id: 461422 | |||||
SCORE 100 Tenant fit out as per plans Date: April 30, 2010 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 273538 | |||||
SCORE 100 Relocate existing light fixtures and or supply new light fixtures, new wall switch occupancy sensors, new recepts wiring power connections wiring for modular furniture as per 2008 nec (cc district) supply and install fire alarm device as per nfpa72 Date: April 13, 2017 Contractor: Lyndee Corporation Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 29, 2017 | Permit id: 767773 | |||||
SCORE 100 Installation of kitchen isnk, open site drain... Connect to existing sanitary, vent and domestic water Date: July 24, 2015 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 28, 2015 | Permit id: 626705 | |||||
SCORE 89 Alterations to an existing mechanical system to include reconfiguration of ductwork & registers diffusers as per approved plan. Separate permit required for electrical permit. Date: August 11, 2015 Contractor: Spirk Brothers Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 6, 2016 | Permit id: 629000 | |||||
SCORE 99 Relocate 1-pull station, replace 4-existing strobes w updated devices cert by bldg vendor as per nec 2008 & nfpa 72 Date: January 29, 2014 Contractor: The Williams Group Electrical Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 517242 | |||||
SCORE 100 Relocate (4) sprinkler heads in room 910. -office building Date: July 5, 2012 Contractor: Majek Fire Protection, Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 15, 2013 | Permit id: 414766 | |||||
SCORE 100 Installation of relay rack,batteries,equipment and 1 outlet,installation of 3 4" emt from panel to rack to supply 20amp 120volts using #12 thn as per 2008 nec Date: March 17, 2011 Contractor: Teldat Communications Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2011 | Permit id: 330152 | |||||
SCORE 95 Install 22 2x4 light fixtures, 3 occupancy sensors, 14 receptacles & 4 switches. Date: October 27, 2009 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 29, 2010 | Permit id: 244669 | |||||
SCORE 100 Install 1 sink Date: June 28, 2012 Contractor: Dominic Garofolo Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 12, 2013 | Permit id: 413838 | |||||
SCORE 100 Relocate 37 diffusers Date: October 19, 2012 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 1, 2013 | Permit id: 433647 | |||||
SCORE 89 Level ii alterations. Interior alterations to include new construction installation of new partitions & doors, ceiling grid and ceiling tiles, and upgrade to finishes. All work shall be in accordance with approved plans. Separate permit required for mechanical, electrical, and fire suppression work. Accessible route to be provided to the primary function area and toilet facilities or drinking fountains serving the area of primary function Date: August 11, 2015 Contractor: Spirk Brothers Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: April 6, 2016 | Permit id: 623513 | |||||
SCORE 100 Renovation to existing space install 5 receptacles use existing circuits per 2008 nec (office space) Date: December 31, 2013 Contractor: New Light Electric Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 11, 2014 | Permit id: 513659 | |||||
SCORE 100 Relocate (10) existing sprinkler heads inorder to accommodate new tenant wall and ceiling layout as per all nfpa no 13 and local codes. Date: January 27, 2014 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 516730 | |||||
SCORE 100 Relocate (6) existing sprinkler heads in order to accommodate new wall and ceiling layout as per all nfpa no. 13 and local codes (ground floor) Date: December 30, 2013 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 12, 2015 | Permit id: 513485 | |||||
SCORE 100 Install kitchen sink Date: December 19, 2013 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 6, 2014 | Permit id: 511432 | |||||
SCORE 100 Relocation of 669 existing fire sprinkler heads on 7th, 11th, and 12th flr. In order to accommodate tenant layouts as per nfpa #13 and all local codes Date: September 21, 2017 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Active | Completion date: October 13, 2017 | Permit id: 817805 | |||||
SCORE 100 Ada water closet and lav, kitchen sink, ice maker drains, a 30- gallon and a 6- gallon electric water heater w drain pans and flood stop valves, watts lf7r backflow for icemaker. Connect to existing sanitary, vent and domestic cold water Date: June 29, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Active | Completion date: July 11, 2017 | Permit id: 794288 | |||||
SCORE 100 Permit to install one fan coil unit, new ductwork with diffusers. Date: September 14, 2012 Contractor: Elliott Lewis Corporation Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 26, 2012 | Permit id: 423620 | |||||
SCORE 100 Furnish & install 2 single pole switches,replace 6 existing 2x4 lay ins add 5 duplex recepts,relocate 1 existing wall mounted audio visual fa device(no new work) furnish & install 2 tele data boxes(cable,jacks, & terminations by others)conference rm Date: August 24, 2012 Contractor: Donald A Pusey Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: October 16, 2012 | Permit id: 423920 | |||||
SCORE 100 Relocate 7 diffusers Date: January 24, 2014 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 516433 | |||||
SCORE 89 Install new 3-sw, 3-ceiling os, relocate 12-existing fixtures, install new 4-outlets & relocate 1-f a strobe as per nec 2008 & nfpa 72 (office space) Date: January 17, 2014 Contractor: Kd Electric Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 22, 2014 | Permit id: 515764 | |||||
SCORE 100 Relocate 9 existing sprinkler heads in order to accommodate the new tenant layout as per all nfpa no. 13 and local codes. Date: December 6, 2013 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 8, 2014 | Permit id: 509967 | |||||
SCORE 100 Renovation existing space relocate 4-light fixtures, install 2-wall switches, 6-recpts use existing circuits as per nec 2008 (commerical) Date: December 18, 2013 Contractor: New Light Electric Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 11, 2014 | Permit id: 511936 | |||||
SCORE 95 Commercial-remove & relocate 7 duplex recepts,5 switches,10-2x4,5 tele data stubs as per 2008 nec (cc district) Date: December 23, 2011 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: June 13, 2012 | Permit id: 380305 | |||||
SCORE 100 Install 6- sinks with 6-gallon water heaters in pans above ceiling with leak detection. Extend from existing sanitary, vent and domestic water Date: March 9, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 764590 | |||||
SCORE 100 Hvac including and mechanical equipment as per plans Date: February 5, 2015 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 586826 | |||||
SCORE 95 Furnish & install 10-receptacles, 9-dup receptacles, 1-furn feed, 9-occ sensors & rework lighting layout as per nec 2008 Date: September 29, 2015 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 16, 2015 | Permit id: 633430 | |||||
SCORE 93 Demo exist light recept & eg power new recept for offices shown on e-400. 1-gfi & 1-hw heater feed "e402 & 403 " furnish & install 24 new 2x4 fix & 6 occ sens rough-in wall for data - no wire as per nec 2008 (office bldg) Date: October 18, 2012 Contractor: L M Service Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: March 15, 2017 | Permit id: 432687 | |||||
SCORE 100 Interior finishes, gwb partitions and millwork for office. Separate electrical and plumbing permits required. Date: June 18, 2012 Contractor: Bittenbender Construction Lp Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: August 12, 2013 | Permit id: 396811 | |||||
SCORE 100 Office fit out-relocating 6-2x4 light fixtures,adding 5 duplex rec,5 single pole switches,1 poke thru device relocating 1 horn strobe for new layout as per 2008 nec (cc district) Date: January 26, 2012 Contractor: Donald A Pusey Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 26, 2012 | Permit id: 385109 | |||||
SCORE 100 Ductwork installation, reconfiguration- 19 registers diffusers connect to existing system Date: March 1, 2012 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 385211 | |||||
SCORE 100 Interior alterations to office tenant space (stroll) on 3rd floor. Date: February 1, 2012 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2012 | Permit id: 384201 | |||||
SCORE 100 Alterations to existing hvac systems for 16th, 17th & 18th floor office spaces as per approved plans. Date: March 21, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 765013 | |||||
SCORE 100 Fixture installation Date: July 23, 2009 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 25, 2009 | Permit id: 228121 | |||||
SCORE 100 Relocate 8 diffusers Date: July 22, 2009 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 4, 2009 | Permit id: 227828 | |||||
SCORE 100 Replace 4-recpts, install 8-twist lock recpt & 4-home run circuit as per nec 2008 (office bldg) Date: July 29, 2013 Contractor: J F Hierholzer Mech And Electric Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: July 29, 2013 | Permit id: 486054 | |||||
SCORE 100 Relocate 1-diffuser ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans Date: March 3, 2015 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 29, 2015 | Permit id: 593609 | |||||
SCORE 89 10th floor suite 1020: 2 new 2x4 fixture 3 new 2x2 fixtures 2 single pole switches 1 dedicated 1 volt amp duplex recpt. No voicce data or fire alarm Date: October 5, 2007 Contractor: Crystal Ball Contracting Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2010 | Permit id: 107492 | |||||
SCORE 100 Renovations to 5th floor, suite 10 as per plan. Date: February 20, 2008 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2008 | Permit id: 130550 | |||||
SCORE 89 6 dedicated 1 volt amp recepts, remove and relocate 2 existing light fxts, remove and relocate 1 existing single pole switch. (cc dist) Date: March 4, 2008 Contractor: Crystal Ball Contracting Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 135867 | |||||
SCORE 100 Furnish and install 1 water closet,1 lav,1 floor drain,3 kitchen sinks,2 supply drain boxes, appliances backflow preventor (office space)the installation will comply with the philadelphia plumbing code 2004 Date: November 15, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Active | Completion date: November 15, 2017 | Permit id: 822297 | |||||
SCORE 100 Furnish and install 1 kitchen sink,1 supply drain box and 7 appliances backflow preventor (office space)the installation will comply with the philadelphia plumbing code 2004 Date: November 15, 2017 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Active | Completion date: November 15, 2017 | Permit id: 822308 | |||||
SCORE 100 Construct non bearing drywall partition ceiling high. Provide frame. Additional permit required to modify existing sprinkler, mechanical and electrical to accomodate new layout and meet codes. Provide millwork at pantry. Ada sink and required plumbing. Date: December 24, 2013 Contractor: Martignetti Construction Compa Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 21, 2014 | Permit id: 507945 | |||||
SCORE 100 No change in use and occupancy classification. Interior alterations (prescriptive method) as per approved plans. Separate permit required for any mep and fire suppression work. Date: October 30, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Active | Completion date: November 20, 2017 | Permit id: 818119 | |||||
SCORE 100 Demo receptacles, install 2 new receptacles, hook up furniture power, extend existing circuits as per nec 2008 cc district Date: January 26, 2016 Contractor: J F Hierholzer Mech And Electric Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: January 26, 2016 | Permit id: 660387 | |||||
SCORE 56 Interior renovations and partial demo of non bearing walls on 11th fl. Date: November 4, 2008 Contractor: American Bank Equipment Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 13, 2009 | Permit id: 183867 | |||||
SCORE 100 Relocate 23 heads to fix wall and ceiling layout for mercantile. Date: March 22, 2011 Contractor: Majek Fire Protection, Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 331079 | |||||
SCORE 95 Install 2 receptacles, 9 dedicated receptacles & 2 data drops. Relocate 2 dimmer switches. Date: April 12, 2011 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 26, 2011 | Permit id: 335196 | |||||
SCORE 100 Finishing and install (2) panels for lighting, install 28 fixtures, no addition wiring as per 2008 nec (cc dist) Date: August 10, 2011 Contractor: Michael Bynum Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 26, 2011 | Permit id: 339950 | |||||
SCORE 96 Pull out and recable existing cat5 communications cabling for cat6 plenum rated cabling for voice and data, 26 stations total as per 2008 nec (cc district) Date: August 21, 2015 Contractor: Jw Carrigan Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: August 21, 2015 | Permit id: 633570 | |||||
SCORE 98 Interior renovation of commercial office space as per the submitted plan. Electrical, plumbing, mechanical, and fire supression work requires additional permits. Call the inspector prior to starting work. Date: January 23, 2012 Contractor: Patriot Construction Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 383569 | |||||
SCORE 95 Replace 24 ballast-outside lights per 2008 nec Date: August 3, 2012 Contractor: Hatzel And Buehler Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 5, 2015 | Permit id: 420271 | |||||
SCORE 100 Relocate (78) sprinkler heads. Date: January 28, 2015 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: March 30, 2015 | Permit id: 587050 | |||||
SCORE 93 Core and poked furniture locations,4 recept locations, 2x4 light fixtures, 6 ceiling occ sensors and 2 wall swithces. All work done in accordance with 2008 nec. Installation to comply with article 310. 15(b)(2)(a). Date: December 27, 2012 Contractor: L M Service Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: December 27, 2012 | Permit id: 442802 | |||||
SCORE 100 Interior renovation of existing office space, as per plans. Date: July 25, 2017 Contractor: Haas Peters Construction Group Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 3, 2017 | Permit id: 799113 | |||||
SCORE 100 Fixture installation Date: May 7, 2008 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2009 | Permit id: 150701 | |||||
SCORE 99 New service to space fed from landlord distribution panel existing branch circuits to feed fights,outlets and equipment (dunkin donuts) Date: December 20, 2013 Contractor: The Williams Group Electrical Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: April 11, 2014 | Permit id: 507693 | |||||
SCORE 100 For the installation of registers, diffusers and appliances with associated ductwork on the 7th floor of an exisitng high rise. Appliances to be installed in accordance with manufacturers specifications. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: August 24, 2017 Contractor: Structure Tone,Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: August 25, 2017 | Permit id: 809792 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: January 11, 2016 Contractor: Fields Fire Protection Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: July 20, 2017 | Permit id: 662803 | |||||
No change in use and occupancy classification. Interior alterations for a tenant fit-out to create a take out restaurant. Separate permits required for mechanical, electrical, plumbing, signage, and kitchen hoods. Date: November 19, 2013 Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 26, 2014 | Permit id: 497336 | |||||
SCORE 100 Interior alterations per plans to kitchen pantry areas in a portion of an existing tenant space in the sixth floor. Separate permits required for any electrical and plumbing work. Date: December 12, 2013 Contractor: Martignetti Construction Compa Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 21, 2014 | Permit id: 506131 | |||||
SCORE 100 6 floors sinks,(1)3 compartment sink,1 toilets,1 lav and 1 utility sink (dunkin donuts) Date: December 27, 2013 Contractor: Joseph Rosati Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 31, 2014 | Permit id: 507190 | |||||
SCORE 100 Installation of kitchen sink Date: December 19, 2013 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 6, 2014 | Permit id: 511409 | |||||
SCORE 100 Relocate 8 diffusers Date: January 27, 2012 Contractor: Lormar Mechanical Services Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 385214 | |||||
SCORE 96 Renovate and relocate the structured cabling in the office space to split 13 single offices throughout the 4 floors to 26 offices per 2008 (office space) Date: October 25, 2012 Contractor: Jw Carrigan Llc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: October 25, 2012 | Permit id: 434500 | |||||
SCORE 100 Installation of 54 cat 5e plenum 4 pair 24 awg cables using j hooks, as per 2005 nec articles 300. 21, 800. 113, 800. 133, 800. 154 & 800. 179. Date: August 20, 2009 Contractor: Teldat Communications Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: August 20, 2009 | Permit id: 233018 | |||||
SCORE 100 Relocate (9) existing sprinkler heads in order to accommodate tenant layouts as per all nfpa no. 13 and local codes. Date: August 26, 2015 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: December 17, 2015 | Permit id: 634785 | |||||
SCORE 100 Relocate 5 existing sprikler heads (suite 1060) Date: May 21, 2010 Contractor: A And S Sprinkler Co Inc Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 280699 | |||||
SCORE 100 Disconnection safe off,temp lighitng and power,reuse exist pnls,add pnls,feeders,meters,light fixtures,lighting control sws,receptacles,mech & hvac connections. Empty box and conduit stub for tele data,tv,av,security system & funiture pre-fab ele connections per 2008 nec (office space)add new fa devices to existing system per nfpa 72 Date: December 4, 2017 Contractor: Anmar Electrical Contractor In Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Active | Completion date: December 4, 2017 | Permit id: 820362 | |||||
SCORE 100 Disconnection safe-off, temp lighting & power, re-use existing electrical panels, add feeders and meters. Light fixtures and lighting control switches, receptacles, mechanical connections, hvac connections. Add new fire alarm devices to existing system, empty box and conduit stub-up for tele data, tv, av, and security sytem. Furniture pre-fab connections as per 2008 nec. (cc district) Date: December 4, 2017 Contractor: Anmar Electrical Contractor In Client: Four Penn Center Owner Llc | Client Company: Treeview Real Estate Lp | Permit type: Electrical permit | Permit status: Active | Completion date: December 4, 2017 | Permit id: 820371 |