Building Permits at 16-20 Harcourt St Boston MA 02116


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 16-20 Harcourt St Boston MA 02116 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
83
Changing fixtures
Date:  March 22, 2010
Value:   $1,000
Contractor: Rachid Zraizaa

Client: Copley Pl Coope | Permit type: Plumbing | Current use: 7more | Permit id: Pl18688 | Parcel: 400985010
2010/03/2210008316-20 Harcourt St Boston Ma 02116Rachid Zraizaa
SCORE
66
Rrenovet kitchen and bathrom in unit 6. J
Date:  April 23, 2010
Value:   $23,000
Contractor: Artur S Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf22944 | Parcel: 400985010
2010/04/23230006616-20 Harcourt St Boston Ma 02116Artur S Sharra
SCORE
99
Add recessed lights microwave outlet change devices
Date:  April 26, 2010
Value:   $2,800
Contractor: John Oconnell

Client: Copley Pl Coope | Permit type: Electrical | Current use: 7more | Permit id: E23178 | Parcel: 400985010
2010/04/2628009916-20 Harcourt St Boston Ma 02116John Oconnell
SCORE
83
Install new fixtures including toilet sink lavory and new shower valve.
Date:  June 10, 2010
Value:   $1,200
Contractor: Rachid Zraizaa

Client: Copley Pl Coope | Permit type: Plumbing | Current use: 6unit | Permit id: Pl29234 | Parcel: 400985010
2010/06/1012008316-20 Harcourt St Boston Ma 02116Rachid Zraizaa
Replace alarm system.
Date:  September 14, 2010
Value:   $1,342

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: Elv42432 | Parcel: 400985010
2010/09/1413429516-20 Harcourt St Boston Ma 02116
SCORE
92
Installed 10 recess lights old work
Date:  September 27, 2010
Value:   $1,800
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical | Current use: 1unit | Permit id: E44300 | Parcel: 400985010
2010/09/2718009216-20 Harcourt St Boston Ma 02116George Hatzis
SCORE
100
Install 2 recessed lights install 2 under counter lights replace trims for 2 recessed lights replace 2 under counter lights replace 3 closet lights replace 2 dimmers.
Date:  February 8, 2011
Value:   $1,000
Contractor: Thomas Rosher

Client: Copley Pl Coope | Permit type: Electrical | Current use: 7more | Permit id: E63192 | Parcel: 400985010
2011/02/08100010016-20 Harcourt St Boston Ma 02116Thomas Rosher
SCORE
87
Remove and replace kitchen cabinets and appliances.
Date:  April 11, 2011
Value:   $29,895
Contractor: Leo D Caplice

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf71833 | Parcel: 400985010
2011/04/11298958716-20 Harcourt St Boston Ma 02116Leo D Caplice
SCORE
82
Demo kitchen cabs and insall new ones new countertops sink faucet lights bathroom replase vanity mirror faucet and light paint unit
Date:  May 19, 2011
Value:   $17,250
Contractor: James Mcnulty

Client: Copley Pl Coope | Permit type: Demolition - interio | Current use: 7more | Permit id: Sf77685 | Parcel: 400985010
2011/05/19172508216-20 Harcourt St Boston Ma 02116James Mcnulty
SCORE
100
Unit 8f-kitchen and bathroom -remodeling tile on the floor new cabinets granite counter top panting new tile in bathrom around vaneity &;new gfi.
Date:  January 6, 2012
Value:   $22,950
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renewal of signs per | Current use: 7more | Permit id: Sf112599 | Parcel: 400985010
2012/01/062295010016-20 Harcourt St Boston Ma 02116Artur Sharra
SCORE
97
Unit 8f move outlets for new kitchen add circuit change devices add bathroom gfi move lights add recesed lights
Date:  January 20, 2012
Value:   $3,600
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical | Current use: 7more | Permit id: E114586 | Parcel: 400985010
2012/01/2036009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
99
Bathroom rehab small kitchen - unit #8f
Date:  January 25, 2012
Value:   $1,500
Contractor: Charles Murphy

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl116273 | Parcel: 400985010
2012/01/2515009916-20 Harcourt St Boston Ma 02116Charles Murphy
SCORE
99
Replace dimmers in unit #9c
Date:  March 28, 2012
Value:   $1,500
Contractor: Michael Grady

Client: Copley Pl Coope | Permit type: Electrical | Current use: 7more | Permit id: E127791 | Parcel: 400985010
2012/03/2815009916-20 Harcourt St Boston Ma 02116Michael Grady
SCORE
92
Repair and maintanance of 103 units due to power surge created from nstar electric.
Date:  March 30, 2012
Value:   $25,000
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical | Current use: 7more | Permit id: E128403 | Parcel: 400985010
2012/03/30250009216-20 Harcourt St Boston Ma 02116George Hatzis
SCORE
86
Remove cabinets and appliances in kitchen move electrical panel to adjacent wall patch plaster and install new cabinets unit 4 e
Date:  October 23, 2012
Value:   $14,500
Contractor: Edward Cummings

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf191645 | Parcel: 400985010
2012/10/23145008616-20 Harcourt St Boston Ma 02116Edward Cummings
SCORE
61
Remodel kitchen sink add an icemaker connection
Date:  October 24, 2012
Value:   $750
Contractor: Jonathan Harvey

Client: Copley Pl Coope | Permit type: Plumbing | Current use: 1-2fam | Permit id: Pl195017 | Parcel: 400985010
2012/10/247506116-20 Harcourt St Boston Ma 02116Jonathan Harvey
SCORE
83
Kitchen remodel relocate sub panel wiring old work
Date:  October 25, 2012
Value:   $4,200
Contractor: Michael Derubeis

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E195354 | Parcel: 400985010
2012/10/2542008316-20 Harcourt St Boston Ma 02116Michael Derubeis
SCORE
76
In this job is included cosmetic bathroom and kitchen remodeling remove old kitchen cabinets and install new cabinets remove old tile from floors and install new tile on kitchen and bathroom floors also on bathroom walls plastering painting install new trim work replace bathroom venety and counterto
Date:  May 17, 2013
Value:   $8,500
Contractor: Andris Kuskis

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf245407 | Parcel: 400985010
2013/05/1785007616-20 Harcourt St Boston Ma 02116Andris Kuskis
SCORE
98
Remove toilets and sinks and replace two shower valves reinstall toilets and sinks
Date:  May 29, 2013
Value:   $500
Contractor: John Bradley

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl248514 | Parcel: 400985010
2013/05/295009816-20 Harcourt St Boston Ma 02116John Bradley
SCORE
100
Kitchen and bathroom renovation. New cabinets in kitchen new tiles in bathroom
Date:  June 13, 2013
Value:   $13,000
Contractor: Edward Ordway

Client: Copley Pl Coope | Permit type: Interior/exterior wo | Current use: Mixed | Permit id: Sf253291 | Parcel: 400985010
2013/06/131300010016-20 Harcourt St Boston Ma 02116Edward Ordway
SCORE
100
Kitchen remodel. Relocate receptacles install 2 recessed lights. Bathroom #1 remove lights install 3 recessed lights. Bathroom #2 remove lights install 3 recessed lights.; unit 9e
Date:  June 19, 2013
Value:   $1,700
Contractor: Thomas Rosher

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E255362 | Parcel: 400985010
2013/06/19170010016-20 Harcourt St Boston Ma 02116Thomas Rosher
SCORE
97
Unit 5a redo kitchen remove lights add recessed lights and switches elec fireplace add tv outlets closet lights change panel
Date:  June 27, 2013
Value:   $8,000
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical | Current use: Other | Permit id: E257513 | Parcel: 400985010
2013/06/2780009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
97
Wire 4 television outlets
Date:  June 27, 2013
Value:   $1,200
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Low voltage | Current use: Multi | Permit id: Elv258512 | Parcel: 400985010
2013/06/2712009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Installation of new outlets in kitchen and four recessed lights in kitchen. Change bath light in bathroom.
Date:  July 31, 2013
Value:   $2,000
Contractor: Patrick Ostiguy

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E260749 | Parcel: 400985010
2013/07/31200010016-20 Harcourt St Boston Ma 02116Patrick Ostiguy
SCORE
100
5a renovet kitchen cabinet and install new cabinet granit counter top refinish floors install new doors and closet doors installnew crown molding and pant walls ciling and doors in unit
Date:  October 1, 2013
Value:   $24,600
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf291103 | Parcel: 400985010
2013/10/012460010016-20 Harcourt St Boston Ma 02116Artur Sharra
SCORE
74
Bathroom renovation
Date:  December 24, 2013
Value:   $36,000
Contractor: Marcela Maggi

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Other | Permit id: Sf308713 | Parcel: 400985010
2013/12/24360007416-20 Harcourt St Boston Ma 02116Marcela Maggi
SCORE
93
Addition 3 lights move gfci plug install vanity light gabinet.
Date:  December 26, 2013
Value:   $1,000
Contractor: Hugo Lobos

Client: Copley Pl Coope | Permit type: Addition | Current use: 1-2fam | Permit id: E315425 | Parcel: 400985010
2013/12/2610009316-20 Harcourt St Boston Ma 02116Hugo Lobos
SCORE
97
Take out old tub shower. Install new walk in shower. Re-install toilet same location install sink same location
Date:  December 26, 2013
Value:   $2,300
Contractor: Carlos Lopes

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl315530 | Parcel: 400985010
2013/12/2623009716-20 Harcourt St Boston Ma 02116Carlos Lopes
SCORE
61
Remove cabinets countertops and tile flooring. Install new cabinets countertops and tile flooring. All work in unit #4a -
Date:  January 29, 2014
Value:   $12,000
Contractor: Mark Daviau

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf320951 | Parcel: 400985010
2014/01/29120006116-20 Harcourt St Boston Ma 02116Mark Daviau
SCORE
98
Replaced kitchen sink and dishwasher and vanity.
Date:  February 7, 2014
Value:   $1,200
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing | Current use: 1-2fam | Permit id: Pl324988 | Parcel: 400985010
2014/02/0712009816-20 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
92
Install new gfci receptacles on new counter tops on existing wiring and add 1 dedicated microwave receptacle.
Date:  February 12, 2014
Value:   $900
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E326101 | Parcel: 400985010
2014/02/129009216-20 Harcourt St Boston Ma 02116George Hatzis
SCORE
100
Resurface kitchen remodel master bathroom remove and replace existing flooring.
Date:  March 11, 2014
Value:   $149,673
Contractor: Chris Rapczynski

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf341601 | Parcel: 400985010
2014/03/1114967310016-20 Harcourt St Boston Ma 02116Chris Rapczynski
SCORE
100
Remove existing tub install a shower pan with drain and shower valve
Date:  March 12, 2014
Value:   $1,200
Contractor: William Stasinos

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl343151 | Parcel: 400985010
2014/03/12120010016-20 Harcourt St Boston Ma 02116William Stasinos
SCORE
99
Install plumbing for a full bath and kitchten sink.
Date:  March 20, 2014
Value:   $3,000
Contractor: Charles Murphy

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl345589 | Parcel: 400985010
2014/03/2030009916-20 Harcourt St Boston Ma 02116Charles Murphy
SCORE
98
Replaced kitchen sink disposal. Dishwasher. And water line to fridge.
Date:  March 21, 2014
Value:   $1,000
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl345201 | Parcel: 400985010
2014/03/2110009816-20 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
97
Add recess lights move dishwasher & disposal wiring add switches remodel bath change all devices
Date:  March 24, 2014
Value:   $5,000
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical | Current use: Comm | Permit id: E346200 | Parcel: 400985010
2014/03/2450009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Kitchen and bathroom renovation new flooring plaster and pach ceiling walls remove the half of the separation wall in kitchen and livindroom
Date:  March 27, 2014
Value:   $26,220
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Mixed | Permit id: Sf347656 | Parcel: 400985010
2014/03/272622010016-20 Harcourt St Boston Ma 02116Artur Sharra
SCORE
100
Renovate two existing bathrooms and one kitchen at unit 6a
Date:  May 19, 2014
Value:   $76,485
Contractor: Leo Caplice

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf363680 | Parcel: 400985010
2014/05/197648510016-20 Harcourt St Boston Ma 02116Leo Caplice
SCORE
100
Plumbing work for two baths and one kitchen
Date:  June 10, 2014
Value:   $2,000
Contractor: George Dangelo

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl371939 | Parcel: 400985010
2014/06/10200010016-20 Harcourt St Boston Ma 02116George Dangelo
SCORE
98
Wiring of outlets switches and appliances
Date:  June 11, 2014
Value:   $10,000
Contractor: Ben Wilson

Client: Copley Pl Coope | Permit type: Electrical | Current use: 1-2fam | Permit id: E372191 | Parcel: 400985010
2014/06/11100009816-20 Harcourt St Boston Ma 02116Ben Wilson
SCORE
98
Unit 4l gas stove
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Pl Coope | Permit type: Gas | Current use: Multi | Permit id: G359096 | Parcel: 400985010
2014/06/13200009816-20 Harcourt St Boston Ma 02116Robert Trethewey
SCORE
98
Powderoom kitchen guestbath masterbath remodel update
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl359094 | Parcel: 400985010
2014/06/13200009816-20 Harcourt St Boston Ma 02116Robert Trethewey
SCORE
99
Unit #5k kitchen and bathroom renovation including plumbing and electrical
Date:  June 17, 2014
Value:   $62,000
Contractor: Reginaldo Correa

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf374272 | Parcel: 400985010
2014/06/17620009916-20 Harcourt St Boston Ma 02116Reginaldo Correa
SCORE
100
Remove and replace kitchen cabinets no structural changes
Date:  June 17, 2014
Value:   $9,000
Contractor: Richard Fallone

Client: Copley Pl Coope | Permit type: Interior/exterior wo | Current use: Multi | Permit id: Sf374283 | Parcel: 400985010
2014/06/17900010016-20 Harcourt St Boston Ma 02116Richard Fallone
SCORE
100
Bathroom remodeling . Remuve the tiles on walls and floor remove the tub innstall new shower durock install tile in shower area and floor new sing plaster and painting work in unit 4f
Date:  June 18, 2014
Value:   $12,830
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf375064 | Parcel: 400985010
2014/06/181283010016-20 Harcourt St Boston Ma 02116Artur Sharra
SCORE
100
Bathroom remodeling unit 6 b remove tub and sing all the walls tile and floor install new shower durck insatall new tile in shower area plaster and painting
Date:  June 18, 2014
Value:   $13,180
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf375075 | Parcel: 400985010
2014/06/181318010016-20 Harcourt St Boston Ma 02116Artur Sharra
SCORE
98
Replacement of tub toilet lav. Work being done at #6b.
Date:  June 24, 2014
Value:   $3,500
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl376836 | Parcel: 400985010
2014/06/2435009816-20 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
100
Install electric for renovation. Unit#6a. Kitchen 2 baths. Lights.
Date:  June 25, 2014
Value:   $8,000
Contractor: Edward Yow

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E377887 | Parcel: 400985010
2014/06/25800010016-20 Harcourt St Boston Ma 02116Edward Yow
SCORE
99
To do the plumbing for a new shower staul bathroom sink and toilet. Apt# 4f
Date:  June 25, 2014
Value:   $2,600
Contractor: Charles Murphy

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl377913 | Parcel: 400985010
2014/06/2526009916-20 Harcourt St Boston Ma 02116Charles Murphy
SCORE
97
Remodel bathroom
Date:  June 26, 2014
Value:   $1,300
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E378099 | Parcel: 400985010
2014/06/2613009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Kitchen and bathroom remodeling with elec in apt 5k
Date:  July 1, 2014
Value:   $2,500
Contractor: Richard Raimondi

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: E379942 | Parcel: 400985010
2014/07/01250010016-20 Harcourt St Boston Ma 02116Richard Raimondi
SCORE
97
Remodel 2 bathrooms
Date:  July 7, 2014
Value:   $3,300
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical | Current use: Other | Permit id: E381037 | Parcel: 400985010
2014/07/0733009716-20 Harcourt St Boston Ma 02116John O Connell
SCORE
98
Unit 6c replacement of fixtures. Changed tub to shower stall. Replaced toilet. Replaced lavatory. Installed bedea. Second bathroom replaced tub with shower stall. Replaced toilet and lavatory.
Date:  July 7, 2014
Value:   $5,000
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing | Current use: Multi | Permit id: Pl381159 | Parcel: 400985010
2014/07/0750009816-20 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
100
Renovation to;two bathrooms in unit 6 c remove sink and vanity tub wall and floor tiles. Install new standup shower door rack tiles around bathroom area and flore install new sheetrock plaster and paint
Date:  July 8, 2014
Value:   $20,555
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Renovations -interio | Current use: Multi | Permit id: Sf381634 | Parcel: 400985010
2014/07/082055510016-20 Harcourt St Boston Ma 02116Artur Sharra
Replace alarm system.
Date:  September 14, 2010
Value:   $1,342

Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: Elv42432 | Parcel: 0400985010
2010/09/1413429516 Harcourt St Boston Ma 02116
Refreshing of common spaces: new paint on walls and ceilings remove and replace carpeting replace light fixtures with new.
Date:  October 1, 2015
Value:   $327,669

Permit type: Renovations -interio | Permit status: Open | Current use: Comm | Permit id: Sf525213 | Parcel: 0400985010
2015/10/013276699516 Harcourt St Boston Ma 02116
Date:  April 26, 2012

Permit status: Expired | Current use: 1unit | Permit id: Smk135076 | Parcel: 0400985000
2012/04/2609516 Harcourt St Boston Ma 02116
Date:  February 10, 2014

Permit status: Expired | Current use: 1unit | Permit id: Smk321374 | Parcel: 0400985000
2014/02/1009516 Harcourt St Boston Ma 02116
Date:  May 28, 2013

Permit status: Expired | Current use: 1unit | Permit id: Smk243168 | Parcel: 0400985000
2013/05/2809516 Harcourt St Boston Ma 02116
Date:  April 28, 2015

Permit status: Expired | Current use: 1unit | Permit id: Smk463397 | Parcel: 0400985000
2015/04/2809516 Harcourt St Boston Ma 02116
Stand boom truck at curb erect and maintain pedestrian protective staging on sidewalk stand truck at curb 930am to 330pm
Date:  December 14, 2015

Permit type: Cranes | Permit status: Expired | Permit id: Occu-409905 | Parcel: 0400985010
2015/12/1409516 Harcourt St Boston Ma 02116
Stand;dumpster at curb 24 hours
Date:  November 23, 2015

Permit type: Dumpsters | Permit status: Expired | Permit id: Occu-517126 | Parcel: 0400985010
2015/11/2309516 Harcourt St Boston Ma 02116
Repair gas leak; 5x4; rdwy; ; boston police area a; 343=4239; street closures9: am to 3: pm; ; extension; no work; 1125-1129
Date:  June 15, 2015

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-482791 | Parcel: 0400985000
2015/06/1509516 Harcourt St Boston Ma 02116
SCORE
72
Dumpsters
Date:  June 19, 2012

Permit status: Expired | Permit id: Occu-152784 | Parcel: 0400985000
2012/06/1907216 Harcourt St Boston Ma 02116Bond Cancelled Personal Movers
Dumpsters
Date:  May 29, 2012

Permit status: Expired | Permit id: Occu-145478 | Parcel: 0400985000
2012/05/2909516 Harcourt St Boston Ma 02116
Electrical low voltage
Date:  September 14, 2010
Value:   $1,342

Client: Copley Pl Coope | Permit type: Electrical | Current use: Multi | Permit id: Elv42432
2010/09/1413429516 Harcourt St Boston Ma 02116
Short form bldg permit
Date:  October 1, 2015
Value:   $327,669

Client: Copley Pl Coope | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf525213
2015/10/013276699516 Harcourt St Boston Ma 02116
SCORE
97
Electrical permit
Date:  June 26, 2014
Value:   $1,300
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E378099 | Parcel: 0400985010
2014/06/2613009716 Harcourt St Boston Ma 02116John O Connell
SCORE
74
Short form bldg permit
Date:  December 24, 2013
Value:   $36,000
Contractor: Marcela Maggi

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf308713 | Parcel: 0400985010
2013/12/24360007416 Harcourt St Boston Ma 02116Marcela Maggi
SCORE
97
Electrical permit
Date:  June 26, 2014
Value:   $1,300
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E378097 | Parcel: 0400985010
2014/06/2613009716 Harcourt St Boston Ma 02116John O Connell
SCORE
92
Repair and maintanance of 103 units due to power surge created from nstar electric.
Date:  March 30, 2012
Value:   $25,000
Contractor: George Hatzis

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E128403 | Parcel: 0400985010
2012/03/30250009216 Harcourt St Boston Ma 02116George Hatzis
SCORE
93
Addition 3 lights move gfci plug install vanity light gabinet.
Date:  December 26, 2013
Value:   $1,000
Contractor: Hugo Lobos

Client: Copley Place Cooperative | Permit type: Addition | Permit status: Expired | Current use: 1-2fam | Permit id: E315425 | Parcel: 0400985010
2013/12/2610009316 Harcourt St Boston Ma 02116Hugo Lobos
SCORE
99
Unit #5k kitchen and bathroom renovation including plumbing and electrical
Date:  June 17, 2014
Value:   $62,000
Contractor: Reginaldo Correa

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf374272 | Parcel: 0400985010
2014/06/17620009916 Harcourt St Boston Ma 02116Reginaldo Correa
SCORE
98
Relocated laundry hook-up. Removed tub and installed shower stall. Replacement of wash basen and toilet and kitchen sink.
Date:  June 24, 2015
Value:   $10,000
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Open | Current use: Multi | Permit id: Pl487757 | Parcel: 0400985010
2015/06/24100009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
98
Unit 6c replacement of fixtures. Changed tub to shower stall. Replaced toilet. Replaced lavatory. Installed bedea. Second bathroom replaced tub with shower stall. Replaced toilet and lavatory.
Date:  July 7, 2014
Value:   $5,000
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl381159 | Parcel: 0400985010
2014/07/0750009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
100
Installation of new outlets in kitchen and four recessed lights in kitchen. Change bath light in bathroom.
Date:  July 31, 2013
Value:   $2,000
Contractor: Patrick Ostiguy

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E260749 | Parcel: 0400985010
2013/07/31200010016 Harcourt St Boston Ma 02116Patrick Ostiguy
SCORE
97
Wire 6 televisions 2 telephone
Date:  December 15, 2015
Value:   $1,200
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Low voltage | Permit status: Open | Current use: Multi | Permit id: Elv548036 | Parcel: 0400985010
2015/12/1512009716 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Work at unit 9-a remodelin kitchen cabinet and two bathrooms remove the tub and install shower tiles in shower area and floor ans new shower doors install four slidein doors plaster some wer need and painting refinish the floors
Date:  November 24, 2015
Value:   $45,000
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Multi | Permit id: Sf542116 | Parcel: 0400985010
2015/11/244500010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
100
Kitchen remodel. Relocate receptacles install 2 recessed lights. Bathroom #1 remove lights install 3 recessed lights. Bathroom #2 remove lights install 3 recessed lights.; unit 9e
Date:  June 19, 2013
Value:   $1,700
Contractor: Thomas Rosher

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E255362 | Parcel: 0400985010
2013/06/19170010016 Harcourt St Boston Ma 02116Thomas Rosher
SCORE
100
Bathroom remodeling unit 6 b remove tub and sing all the walls tile and floor install new shower durck insatall new tile in shower area plaster and painting
Date:  June 18, 2014
Value:   $13,180
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf375075 | Parcel: 0400985010
2014/06/181318010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
92
Rewire bedroom due to water damage from sprinkler break
Date:  February 27, 2015
Value:   $3,500
Contractor: George Hatzis

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E450306 | Parcel: 0400985010
2015/02/2735009216 Harcourt St Boston Ma 02116George Hatzis
SCORE
100
Remove existing tub install a shower pan with drain and shower valve
Date:  March 12, 2014
Value:   $1,200
Contractor: William Stasinos

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl343151 | Parcel: 0400985010
2014/03/12120010016 Harcourt St Boston Ma 02116William Stasinos
SCORE
100
Renovation to;two bathrooms in unit 6 c remove sink and vanity tub wall and floor tiles. Install new standup shower door rack tiles around bathroom area and flore install new sheetrock plaster and paint
Date:  July 8, 2014
Value:   $20,555
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf381634 | Parcel: 0400985010
2014/07/082055510016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
98
Replacement of tub toilet lav. Work being done at #6b.
Date:  June 24, 2014
Value:   $3,500
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl376836 | Parcel: 0400985010
2014/06/2435009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
99
Install plumbing for a full bath and kitchten sink.
Date:  March 20, 2014
Value:   $3,000
Contractor: Charles Murphy

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl345589 | Parcel: 0400985010
2014/03/2030009916 Harcourt St Boston Ma 02116Charles Murphy
SCORE
83
Kitchen remodel relocate sub panel wiring old work
Date:  October 25, 2012
Value:   $4,200
Contractor: Michael Derubeis

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E195354 | Parcel: 0400985010
2012/10/2542008316 Harcourt St Boston Ma 02116Michael Derubeis
SCORE
82
Demo kitchen cabs and insall new ones new countertops sink faucet lights bathroom replase vanity mirror faucet and light paint unit
Date:  May 19, 2011
Value:   $17,250
Contractor: James Mcnulty

Client: Copley Place Cooperative | Permit type: Demolition - interior | Permit status: Expired | Current use: 7more | Permit id: Sf77685 | Parcel: 0400985010
2011/05/19172508216 Harcourt St Boston Ma 02116James Mcnulty
SCORE
100
Install 2 recessed lights install 2 under counter lights replace trims for 2 recessed lights replace 2 under counter lights replace 3 closet lights replace 2 dimmers.
Date:  February 8, 2011
Value:   $1,000
Contractor: Thomas Rosher

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E63192 | Parcel: 0400985010
2011/02/08100010016 Harcourt St Boston Ma 02116Thomas Rosher
SCORE
95
Replace kitchen cabinets. Remove non-load-bearing wall between kitchen and dining room. Remove carpet/tile floor and install hardwood floors in dining room living room kitchen hall and bedrooms. In master bedroom - remove bedroom door and adjacent closet. Install new bedroom door at beginning of hall. Install crown moulding and baseboard trim in all rooms. In bathrooms ? Replace toilets vanities and sinks. Replace ceiling flush mount lights with recessed lights
Date:  January 15, 2015
Value:   $27,000
Contractor: Richard Smith

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf441622 | Parcel: 0400985010
2015/01/15270009516 Harcourt St Boston Ma 02116Richard Smith
SCORE
98
Wiring of outlets switches and appliances
Date:  June 11, 2014
Value:   $10,000
Contractor: Ben Wilson

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E372191 | Parcel: 0400985010
2014/06/11100009816 Harcourt St Boston Ma 02116Ben Wilson
SCORE
100
Bathroom remodeling . Remuve the tiles on walls and floor remove the tub innstall new shower durock install tile in shower area and floor new sing plaster and painting work in unit 4f
Date:  June 18, 2014
Value:   $12,830
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf375064 | Parcel: 0400985010
2014/06/181283010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
99
Replace dimmers in unit #9c
Date:  March 28, 2012
Value:   $1,500
Contractor: Michael Grady

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E127791 | Parcel: 0400985010
2012/03/2815009916 Harcourt St Boston Ma 02116Michael Grady
SCORE
100
Plumbing work for two baths and one kitchen
Date:  June 10, 2014
Value:   $2,000
Contractor: George Dangelo

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl371939 | Parcel: 0400985010
2014/06/10200010016 Harcourt St Boston Ma 02116George Dangelo
SCORE
97
Wire 4 television outlets
Date:  June 27, 2013
Value:   $1,200
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Low voltage | Permit status: Expired | Current use: Multi | Permit id: Elv258512 | Parcel: 0400985010
2013/06/2712009716 Harcourt St Boston Ma 02116John O Connell
SCORE
95
Renovate condo with power and lighting.
Date:  July 21, 2015
Value:   $5,000
Contractor: Richard Schell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Open | Current use: Other | Permit id: E496266 | Parcel: 0400985010
2015/07/2150009516 Harcourt St Boston Ma 02116Richard Schell
SCORE
98
Replaced kitchen sink disposal. Dishwasher. And water line to fridge.
Date:  March 21, 2014
Value:   $1,000
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl345201 | Parcel: 0400985010
2014/03/2110009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
98
Remove toilets and sinks and replace two shower valves reinstall toilets and sinks
Date:  May 29, 2013
Value:   $500
Contractor: John Bradley

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl248514 | Parcel: 0400985010
2013/05/295009816 Harcourt St Boston Ma 02116John Bradley
SCORE
61
Remodel kitchen sink add an icemaker connection
Date:  October 24, 2012
Value:   $750
Contractor: Jonathan Harvey

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl195017 | Parcel: 0400985010
2012/10/247506116 Harcourt St Boston Ma 02116Jonathan Harvey
SCORE
99
Bathroom rehab/small kitchen - unit #8f
Date:  January 25, 2012
Value:   $1,500
Contractor: Charles Murphy

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl116273 | Parcel: 0400985010
2012/01/2515009916 Harcourt St Boston Ma 02116Charles Murphy
SCORE
100
Remove and replace kitchen cabinets no structural changes
Date:  June 17, 2014
Value:   $9,000
Contractor: Richard Fallone

Client: Copley Place Cooperative | Permit type: Interior/exterior work | Permit status: Expired | Current use: Multi | Permit id: Sf374283 | Parcel: 0400985010
2014/06/17900010016 Harcourt St Boston Ma 02116Richard Fallone
SCORE
87
Remove and replace kitchen cabinets and appliances.
Date:  April 11, 2011
Value:   $29,895
Contractor: Leo D Caplice

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf71833 | Parcel: 0400985010
2011/04/11298958716 Harcourt St Boston Ma 02116Leo D Caplice
SCORE
61
Remove cabinets countertops and tile flooring. Install new cabinets countertops and tile flooring. All work in unit #4a -
Date:  January 29, 2014
Value:   $12,000
Contractor: Mark Daviau

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf320951 | Parcel: 0400985010
2014/01/29120006116 Harcourt St Boston Ma 02116Mark Daviau
SCORE
100
Remove and replace existing finishes in master bathroom guest bathroom and powder room in unit #4l. General electrical work. No structural work and no sprinkler work.
Date:  June 17, 2015
Value:   $100,853
Contractor: Chris Rapczynski

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf485135 | Parcel: 0400985010
2015/06/1710085310016 Harcourt St Boston Ma 02116Chris Rapczynski
SCORE
98
Powderoom / kitchen / guestbath / masterbath remodel/update
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl359094 | Parcel: 0400985010
2014/06/13200009816 Harcourt St Boston Ma 02116Robert Trethewey
SCORE
97
Unit 8f move outlets for new kitchen add circuit change devices add bathroom gfi move lights add recesed lights
Date:  January 20, 2012
Value:   $3,600
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E114586 | Parcel: 0400985010
2012/01/2036009716 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Kitchrn and two bathrooms remodeling install new hardwood floors pach and paint the all ceiling walls and doors remove the side wall off the kitchen 3 ft to the hight off the contertop
Date:  June 10, 2015
Value:   $47,300
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf482307 | Parcel: 0400985010
2015/06/104730010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
100
Work demage unit 1h demolatiom new instulision and repairs walls and cieling install sheetrock plaster painting
Date:  March 3, 2015
Value:   $7,450
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Interior/exterior work | Permit status: Expired | Current use: Multi | Permit id: Sf451071 | Parcel: 0400985010
2015/03/03745010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
100
Install electric for renovation. Unit#6a. Kitchen 2 baths. Lights.
Date:  June 25, 2014
Value:   $8,000
Contractor: Edward Yow

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E377887 | Parcel: 0400985010
2014/06/25800010016 Harcourt St Boston Ma 02116Edward Yow
SCORE
97
Unit 5a redo kitchen remove lights add recessed lights and switches elec fireplace add tv outlets closet lights change panel
Date:  June 27, 2013
Value:   $8,000
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E257513 | Parcel: 0400985010
2013/06/2780009716 Harcourt St Boston Ma 02116John O Connell
SCORE
99
To do the plumbing for a new shower staul bathroom sink and toilet. Apt# 4f
Date:  June 25, 2014
Value:   $2,600
Contractor: Charles Murphy

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl377913 | Parcel: 0400985010
2014/06/2526009916 Harcourt St Boston Ma 02116Charles Murphy
SCORE
98
Unit 4l gas stove
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Place Cooperative | Permit type: Gas | Permit status: Expired | Current use: Multi | Permit id: G359096 | Parcel: 0400985010
2014/06/13200009816 Harcourt St Boston Ma 02116Robert Trethewey
SCORE
99
Install shower stall drain and shower valve - unit #8f
Date:  May 1, 2012
Value:   $1,500
Contractor: Charles Murphy

Client: Mass Turnpike Authority | Permit type: Plumbing | Current use: 1unit | Permit id: Pl137348
2012/05/0115009916 Harcourt St Boston Ma 02116Charles Murphy
SCORE
100
Replace lighting with energy efficient fixtures at residences at copley place masters 617-236-5970.
Date:  June 10, 2015
Value:   $7,700
Contractor: Ralph Carroccio

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E475867 | Parcel: 0400985010
2015/06/10770010016 Harcourt St Boston Ma 02116Ralph Carroccio
SCORE
100
Kitchen and bathroom renovation new flooring plaster and pach ceiling walls remove the half of the separation wall in kitchen and livindroom
Date:  March 27, 2014
Value:   $26,220
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf347656 | Parcel: 0400985010
2014/03/272622010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
83
Changing fixtures
Date:  March 22, 2010
Value:   $1,000
Contractor: Rachid Zraizaa

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: 7more | Permit id: Pl18688 | Parcel: 0400985010
2010/03/2210008316 Harcourt St Boston Ma 02116Rachid Zraizaa
SCORE
92
Install new gfci receptacles on new counter tops on existing wiring and add 1 dedicated microwave receptacle.
Date:  February 12, 2014
Value:   $900
Contractor: George Hatzis

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E326101 | Parcel: 0400985010
2014/02/129009216 Harcourt St Boston Ma 02116George Hatzis
SCORE
100
5a renovet kitchen cabinet and install new cabinet granit counter top refinish floors install new doors and closet doors installnew crown molding and pant walls ciling and doors in unit
Date:  October 1, 2013
Value:   $24,600
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf291103 | Parcel: 0400985010
2013/10/012460010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
83
Install new fixtures including toilet sink lavory and new shower valve.
Date:  June 10, 2010
Value:   $1,200
Contractor: Rachid Zraizaa

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: 6unit | Permit id: Pl29234 | Parcel: 0400985010
2010/06/1012008316 Harcourt St Boston Ma 02116Rachid Zraizaa
SCORE
98
Replace two tubs with two shower stalls. Replaced w/c and lavatory.
Date:  December 8, 2015
Value:   $10,000
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl545861 | Parcel: 0400985010
2015/12/08100009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
76
In this job is included cosmetic bathroom and kitchen remodeling remove old kitchen cabinets and install new cabinets remove old tile from floors and install new tile on kitchen and bathroom floors also on bathroom walls plastering painting install new trim work replace bathroom venety and countertops replace kitchen countertop install new floor.; unit 9e
Date:  May 17, 2013
Value:   $8,500
Contractor: Andris Kuskis

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf245407 | Parcel: 0400985010
2013/05/1785007616 Harcourt St Boston Ma 02116Andris Kuskis
SCORE
100
Unit 8f-kitchen and bathroom -remodeling tile on the floor new cabinets granite counter top panting new tile in bathrom around vaneity &;new gfi.
Date:  January 6, 2012
Value:   $22,950
Contractor: Artur Sharra

Client: Copley Place Cooperative | Permit type: Renewal of signs permit | Permit status: Expired | Current use: 7more | Permit id: Sf112599 | Parcel: 0400985010
2012/01/062295010016 Harcourt St Boston Ma 02116Artur Sharra
SCORE
66
Rrenovet kitchen and bathrom in unit 6. J
Date:  April 23, 2010
Value:   $23,000
Contractor: Artur S Sharra

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf22944 | Parcel: 0400985010
2010/04/23230006616 Harcourt St Boston Ma 02116Artur S Sharra
SCORE
97
Remodel 2 bathrooms
Date:  July 7, 2014
Value:   $3,300
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E381037 | Parcel: 0400985010
2014/07/0733009716 Harcourt St Boston Ma 02116John O Connell
SCORE
98
Replaced kitchen sink and dishwasher and vanity.
Date:  February 7, 2014
Value:   $1,200
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl324988 | Parcel: 0400985010
2014/02/0712009816 Harcourt St Boston Ma 02116Patrick Otoole
SCORE
99
Add recessed lights microwave outlet change devices
Date:  April 26, 2010
Value:   $2,800
Contractor: John Oconnell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 7more | Permit id: E23178 | Parcel: 0400985010
2010/04/2628009916 Harcourt St Boston Ma 02116John Oconnell
SCORE
99
In unit #4l; plumbing work remodel 3 bathrooms
Date:  July 14, 2015
Value:   $5,000
Contractor: Adam Stack

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Open | Current use: Multi | Permit id: Pl494156 | Parcel: 0400985010
2015/07/1450009916 Harcourt St Boston Ma 02116Adam Stack
SCORE
97
Unit 9a remodel most of unit kitchen 2 baths change panel add recessed lights tvs
Date:  December 15, 2015
Value:   $13,000
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Open | Current use: Multi | Permit id: E548029 | Parcel: 0400985010
2015/12/15130009716 Harcourt St Boston Ma 02116John O Connell
SCORE
97
Add recess lights move dishwasher & disposal wiring add switches remodel bath change all devices
Date:  March 24, 2014
Value:   $5,000
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E346200 | Parcel: 0400985010
2014/03/2450009716 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Resurface kitchen remodel master bathroom remove and replace existing flooring.
Date:  March 11, 2014
Value:   $149,673
Contractor: Chris Rapczynski

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf341601 | Parcel: 0400985010
2014/03/1114967310016 Harcourt St Boston Ma 02116Chris Rapczynski
SCORE
100
Kitchen and bathroom remodeling with elec in apt 5k
Date:  July 1, 2014
Value:   $2,500
Contractor: Richard Raimondi

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E379942 | Parcel: 0400985010
2014/07/01250010016 Harcourt St Boston Ma 02116Richard Raimondi
SCORE
97
Unit 7c add recessed lights rewire kitchen remodel 2 baths move panel 2 kickspace heaters
Date:  June 2, 2015
Value:   $10,200
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E479105 | Parcel: 0400985010
2015/06/02102009716 Harcourt St Boston Ma 02116John O Connell
SCORE
86
Remove cabinets and appliances in kitchen move electrical panel to adjacent wall patch plaster and install new cabinets unit 4 e
Date:  October 23, 2012
Value:   $14,500
Contractor: Edward Cummings

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf191645 | Parcel: 0400985010
2012/10/23145008616 Harcourt St Boston Ma 02116Edward Cummings
SCORE
92
Installed recess lights old work
Date:  September 27, 2010
Value:   $1,800
Contractor: George Hatzis

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: 1unit | Permit id: E44300 | Parcel: 0400985010
2010/09/2718009216 Harcourt St Boston Ma 02116George Hatzis
SCORE
97
Take out old tub/shower. Install new walk in shower. Re-install toilet same location install sink same location
Date:  December 26, 2013
Value:   $2,300
Contractor: Carlos Lopes

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: Multi | Permit id: Pl315530 | Parcel: 0400985010
2013/12/2623009716 Harcourt St Boston Ma 02116Carlos Lopes
SCORE
100
Kitchen and bathroom renovation. New cabinets in kitchen new tiles in bathroom
Date:  June 13, 2013
Value:   $13,000
Contractor: Edward Ordway

Client: Copley Place Cooperative | Permit type: Interior/exterior work | Permit status: Expired | Current use: Mixed | Permit id: Sf253291 | Parcel: 0400985010
2013/06/131300010016 Harcourt St Boston Ma 02116Edward Ordway
SCORE
100
Install 1/8 copper water line around cabinets. Connect plumbing to sink and faucet for two bathrooms. Connect up kitchen appliances and sink.
Date:  March 10, 2015
Value:   $1,500
Contractor: Matthew Nelson

Client: Copley Place Cooperative | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl450787 | Parcel: 0400985010
2015/03/10150010016 Harcourt St Boston Ma 02116Matthew Nelson
SCORE
97
Unit 9a replace 2 smoke detectors
Date:  December 15, 2015
Value:   $150
Contractor: John O Connell

Client: Copley Place Cooperative | Permit type: Fire alarm | Permit status: Open | Current use: Multi | Permit id: Efa548031 | Parcel: 0400985010
2015/12/151509716 Harcourt St Boston Ma 02116John O Connell
SCORE
100
Renovate two existing bathrooms and one kitchen at unit 6a
Date:  May 19, 2014
Value:   $76,485
Contractor: Leo Caplice

Client: Copley Place Cooperative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf363680 | Parcel: 0400985010
2014/05/197648510016 Harcourt St Boston Ma 02116Leo Caplice
SCORE
100
Installation of recessed lighting throughout kitchen reno misc outlets unit 5g
Date:  January 30, 2015
Value:   $10,500
Contractor: James Carleton

Client: Copley Place Cooperative | Permit type: Electrical | Permit status: Expired | Current use: Multi | Permit id: E444819 | Parcel: 0400985010
2015/01/301050010016 Harcourt St Boston Ma 02116James Carleton
SCORE
97
Wire 4 television outlets
Date:  June 27, 2013
Value:   $1,200
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical low voltage | Expiration date: December 27, 2013 | Current use: Multi | Permit id: Elv258512 | Parcel: 0400985010
2013/06/2712009716 Harcourt St Boston MaJohn O Connell
Bfd smoke/co inspection and
Date:  April 26, 2012

Client: Mass Turnpike A | Expiration date: June 25, 2012 | Current use: 1unit | Permit id: Smk135076 | Parcel: 0400985000
2012/04/2609516 Harcourt St Boston Ma
Bfd smoke/co inspection and
Date:  February 10, 2014

Client: Mass Turnpike A | Expiration date: April 11, 2014 | Current use: 1unit | Permit id: Smk321374 | Parcel: 0400985000
2014/02/1009516 Harcourt St Boston Ma
SCORE
99
Install plumbing for a full bath and kitchten sink.
Date:  March 20, 2014
Value:   $3,000
Contractor: Charles Murphy

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: September 20, 2014 | Current use: Multi | Permit id: Pl345589 | Parcel: 0400985010
2014/03/2030009916 Harcourt St Boston MaCharles Murphy
Bfd smoke/co inspection and
Date:  May 28, 2013

Client: Mass Turnpike A | Expiration date: July 27, 2013 | Current use: 1unit | Permit id: Smk243168 | Parcel: 0400985000
2013/05/2809516 Harcourt St Boston Ma
Bfd smoke/co inspection and
Date:  April 28, 2015

Client: Mass Turnpike A | Expiration date: June 27, 2015 | Current use: 1unit | Permit id: Smk463397 | Parcel: 0400985000
2015/04/2809516 Harcourt St Boston Ma
SCORE
98
Remove toilets and sinks and replace two shower valves reinstall toilets and sinks
Date:  May 29, 2013
Value:   $500
Contractor: John Bradley

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: November 29, 2013 | Current use: Multi | Permit id: Pl248514 | Parcel: 0400985010
2013/05/295009816 Harcourt St Boston MaJohn Bradley
Replace alarm system.
Date:  September 14, 2010
Value:   $1,342

Client: Copley Pl Coope | Permit type: Electrical low voltage | Expiration date: March 14, 2011 | Current use: Multi | Permit id: Elv42432 | Parcel: 0400985010
2010/09/1413429516 Harcourt St Boston Ma
SCORE
100
Install electric for renovation. Unit#6a. Kitchen 2 baths. Lights.
Date:  June 25, 2014
Value:   $8,000
Contractor: Edward Yow

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 25, 2014 | Current use: Multi | Permit id: E377887 | Parcel: 0400985010
2014/06/25800010016 Harcourt St Boston MaEdward Yow
SCORE
61
Remodel kitchen sink add an icemaker connection
Date:  October 24, 2012
Value:   $750
Contractor: Jonathan Harvey

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: April 24, 2013 | Current use: 1-2fam | Permit id: Pl195017 | Parcel: 0400985010
2012/10/247506116 Harcourt St Boston MaJonathan Harvey
SCORE
99
Unit #5k kitchen and bathroom renovation including plumbing and electrical
Date:  June 17, 2014
Value:   $62,000
Contractor: Reginaldo Correa

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 17, 2014 | Current use: Comm | Permit id: Sf374272 | Parcel: 0400985010
2014/06/17620009916 Harcourt St Boston MaReginaldo Correa
SCORE
97
Unit 8f move outlets for new kitchen add circuit change devices add bathroom gfi move lights add recesed lights
Date:  January 20, 2012
Value:   $3,600
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: July 20, 2012 | Current use: 7more | Permit id: E114586 | Parcel: 0400985010
2012/01/2036009716 Harcourt St Boston MaJohn O Connell
Temporary bagging of smoke detectors
Date:  November 12, 2015

Client: Mass Turnpike A | Permit type: Bfd bag smoke detectors | Permit id: Bsd537886 | Parcel: 0400985000
2015/11/1209516 Harcourt St Boston Ma
SCORE
100
Work at unit 9-a remodelin kitchen cabinet and two bathrooms remove the tub and install shower tiles in shower area and floor ans new shower doors install four slidein doors plaster some wer need and painting refinish the floors
Date:  November 24, 2015
Value:   $45,000
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: May 24, 2016 | Current use: Multi | Permit id: Sf542116 | Parcel: 0400985010
2015/11/244500010016 Harcourt St Boston MaArtur Sharra
SCORE
97
Unit 7c add recessed lights rewire kitchen remodel 2 baths move panel 2 kickspace heaters
Date:  June 2, 2015
Value:   $10,200
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 2, 2015 | Current use: Multi | Permit id: E479105 | Parcel: 0400985010
2015/06/02102009716 Harcourt St Boston MaJohn O Connell
SCORE
100
Replace lighting with energy efficient fixtures at residences at copley place masters 617-236-5970.
Date:  June 10, 2015
Value:   $7,700
Contractor: Ralph Carroccio

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 10, 2015 | Current use: Comm | Permit id: E475867 | Parcel: 0400985010
2015/06/10770010016 Harcourt St Boston MaRalph Carroccio
SCORE
100
Kitchrn and two bathrooms remodeling install new hardwood floors pach and paint the all ceiling walls and doors remove the side wall off the kitchen 3 ft to the hight off the contertop
Date:  June 10, 2015
Value:   $47,300
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 10, 2015 | Current use: Multi | Permit id: Sf482307 | Parcel: 0400985010
2015/06/104730010016 Harcourt St Boston MaArtur Sharra
SCORE
97
Unit 9a replace 2 smoke detectors
Date:  December 15, 2015
Value:   $150
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical fire alarms | Expiration date: June 15, 2016 | Current use: Multi | Permit id: Efa548031 | Parcel: 0400985010
2015/12/151509716 Harcourt St Boston MaJohn O Connell
SCORE
97
Unit 9a remodel most of unit kitchen 2 baths change panel add recessed lights tvs
Date:  December 15, 2015
Value:   $13,000
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: June 15, 2016 | Current use: Multi | Permit id: E548029 | Parcel: 0400985010
2015/12/15130009716 Harcourt St Boston MaJohn O Connell
SCORE
97
Wire 6 televisions 2 telephone
Date:  December 15, 2015
Value:   $1,200
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical low voltage | Expiration date: June 15, 2016 | Current use: Multi | Permit id: Elv548036 | Parcel: 0400985010
2015/12/1512009716 Harcourt St Boston MaJohn O Connell
Stand boom truck at curb erect and maintain pedestrian protective staging on sidewalk stand truck at curb / 930am to 330pm
Date:  December 14, 2015

Client: Copley Pl Coope | Permit type: Street occupancy permit | Expiration date: December 17, 2015 | Permit id: Occu-409905 | Parcel: 0400985010
2015/12/1409516 Harcourt St Boston Ma
Stand;dumpster at curb / 24 hours
Date:  November 23, 2015

Client: Copley Pl Coope | Permit type: Street occupancy permit | Expiration date: December 19, 2015 | Permit id: Occu-517126 | Parcel: 0400985010
2015/11/2309516 Harcourt St Boston Ma
Repair gas leak; 5x4; rdwy; / boston police area a; 343=4239; street closures9: am to 3: pm; / extension; no work; 11/25-11/29
Date:  June 15, 2015

Client: Mass Turnpike A | Permit type: Excavation permit | Expiration date: December 22, 2015 | Permit id: Exca-482791 | Parcel: 0400985000
2015/06/1509516 Harcourt St Boston Ma
SCORE
98
Relocated laundry hook-up. Removed tub and installed shower stall. Replacement of wash basen and toilet and kitchen sink.
Date:  June 24, 2015
Value:   $10,000
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: December 24, 2015 | Current use: Multi | Permit id: Pl487757 | Parcel: 0400985010
2015/06/24100009816 Harcourt St Boston MaPatrick Otoole
SCORE
100
Remove and replace existing finishes in master bathroom guest bathroom and powder room in unit #4l. General electrical work. No structural work and no sprinkler work.
Date:  June 17, 2015
Value:   $100,853
Contractor: Chris Rapczynski

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 17, 2015 | Current use: Multi | Permit id: Sf485135 | Parcel: 0400985010
2015/06/1710085310016 Harcourt St Boston MaChris Rapczynski
SCORE
100
Resurface kitchen remodel master bathroom remove and replace existing flooring.
Date:  March 11, 2014
Value:   $149,673
Contractor: Chris Rapczynski

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: September 11, 2014 | Current use: Multi | Permit id: Sf341601 | Parcel: 0400985010
2014/03/1114967310016 Harcourt St Boston MaChris Rapczynski
SCORE
99
In unit #4l; plumbing work remodel 3 bathrooms
Date:  July 14, 2015
Value:   $5,000
Contractor: Adam Stack

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: January 14, 2016 | Current use: Multi | Permit id: Pl494156 | Parcel: 0400985010
2015/07/1450009916 Harcourt St Boston MaAdam Stack
SCORE
95
Renovate condo with power and lighting.
Date:  July 21, 2015
Value:   $5,000
Contractor: Richard Schell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: January 21, 2016 | Current use: Other | Permit id: E496266 | Parcel: 0400985010
2015/07/2150009516 Harcourt St Boston MaRichard Schell
SCORE
83
Kitchen remodel relocate sub panel wiring old work
Date:  October 25, 2012
Value:   $4,200
Contractor: Michael Derubeis

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: April 25, 2013 | Current use: Multi | Permit id: E195354 | Parcel: 0400985010
2012/10/2542008316 Harcourt St Boston MaMichael Derubeis
SCORE
97
Unit 5a redo kitchen remove lights add recessed lights and switches elec fireplace add tv outlets closet lights change panel
Date:  June 27, 2013
Value:   $8,000
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 27, 2013 | Current use: Other | Permit id: E257513 | Parcel: 0400985010
2013/06/2780009716 Harcourt St Boston MaJohn O Connell
SCORE
98
Unit 6c replacement of fixtures. Changed tub to shower stall. Replaced toilet. Replaced lavatory. Installed bedea. Second bathroom replaced tub with shower stall. Replaced toilet and lavatory.
Date:  July 7, 2014
Value:   $5,000
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: January 7, 2015 | Current use: Multi | Permit id: Pl381159 | Parcel: 0400985010
2014/07/0750009816 Harcourt St Boston MaPatrick Otoole
SCORE
72
Street occupancy permit
Date:  June 19, 2012

Client: Mass Turnpike A | Expiration date: June 25, 2012 | Permit id: Occu-152784 | Parcel: 0400985000
2012/06/1907216 Harcourt St Boston MaBond Cancelled Personal Movers
SCORE
100
Renovate two existing bathrooms and one kitchen at unit 6a
Date:  May 19, 2014
Value:   $76,485
Contractor: Leo Caplice

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: November 19, 2014 | Current use: Multi | Permit id: Sf363680 | Parcel: 0400985010
2014/05/197648510016 Harcourt St Boston MaLeo Caplice
SCORE
100
Kitchen and bathroom remodeling with elec in apt 5k
Date:  July 1, 2014
Value:   $2,500
Contractor: Richard Raimondi

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: January 1, 2015 | Current use: Multi | Permit id: E379942 | Parcel: 0400985010
2014/07/01250010016 Harcourt St Boston MaRichard Raimondi
Street occupancy permit
Date:  May 29, 2012

Client: Mass Turnpike A | Expiration date: June 1, 2012 | Permit id: Occu-145478 | Parcel: 0400985000
2012/05/2909516 Harcourt St Boston Ma
SCORE
97
Add recess lights move dishwasher & disposal wiring add switches remodel bath change all devices
Date:  March 24, 2014
Value:   $5,000
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: September 24, 2014 | Current use: Comm | Permit id: E346200 | Parcel: 0400985010
2014/03/2450009716 Harcourt St Boston MaJohn O Connell
SCORE
100
Plumbing work for two baths and one kitchen
Date:  June 10, 2014
Value:   $2,000
Contractor: George Dangelo

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: December 10, 2014 | Current use: Multi | Permit id: Pl371939 | Parcel: 0400985010
2014/06/10200010016 Harcourt St Boston MaGeorge Dangelo
SCORE
100
Remove existing tub install a shower pan with drain and shower valve
Date:  March 12, 2014
Value:   $1,200
Contractor: William Stasinos

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: September 12, 2014 | Current use: Multi | Permit id: Pl343151 | Parcel: 0400985010
2014/03/12120010016 Harcourt St Boston MaWilliam Stasinos
SCORE
100
Bathroom remodeling unit 6 b remove tub and sing all the walls tile and floor install new shower durck insatall new tile in shower area plaster and painting
Date:  June 18, 2014
Value:   $13,180
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 18, 2014 | Current use: Multi | Permit id: Sf375075 | Parcel: 0400985010
2014/06/181318010016 Harcourt St Boston MaArtur Sharra
SCORE
100
Unit 8f-kitchen and bathroom -remodeling tile on the floor new cabinets granite counter top panting new tile in bathrom around vaneity &;new gfi.
Date:  January 6, 2012
Value:   $22,950
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: July 6, 2012 | Current use: 7more | Permit id: Sf112599 | Parcel: 0400985010
2012/01/062295010016 Harcourt St Boston MaArtur Sharra
SCORE
100
Kitchen and bathroom renovation new flooring plaster and pach ceiling walls remove the half of the separation wall in kitchen and livindroom
Date:  March 27, 2014
Value:   $26,220
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: September 27, 2014 | Current use: Mixed | Permit id: Sf347656 | Parcel: 0400985010
2014/03/272622010016 Harcourt St Boston MaArtur Sharra
SCORE
97
Remodel bathroom
Date:  June 26, 2014
Value:   $1,300
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 26, 2014 | Current use: Multi | Permit id: E378097 | Parcel: 0400985010
2014/06/2613009716 Harcourt St Boston MaJohn O Connell
SCORE
99
Install shower stall drain and shower valve - unit #8f
Date:  May 1, 2012
Value:   $1,500
Contractor: Charles Murphy

Client: Mass Turnpike A | Permit type: Plumbing permit | Expiration date: November 1, 2012 | Current use: 1unit | Permit id: Pl137348 | Parcel: 0400985000
2012/05/0115009916 Harcourt St Boston MaCharles Murphy
SCORE
99
Add recessed lights microwave outlet change devices
Date:  April 26, 2010
Value:   $2,800
Contractor: John Oconnell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: October 26, 2010 | Current use: 7more | Permit id: E23178 | Parcel: 0400985010
2010/04/2628009916 Harcourt St Boston MaJohn Oconnell
SCORE
87
Remove and replace kitchen cabinets and appliances.
Date:  April 11, 2011
Value:   $29,895
Contractor: Leo D Caplice

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: October 11, 2011 | Current use: Multi | Permit id: Sf71833 | Parcel: 0400985010
2011/04/11298958716 Harcourt St Boston MaLeo D Caplice
SCORE
98
Replacement of tub toilet lav. Work being done at #6b.
Date:  June 24, 2014
Value:   $3,500
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: December 24, 2014 | Current use: Multi | Permit id: Pl376836 | Parcel: 0400985010
2014/06/2435009816 Harcourt St Boston MaPatrick Otoole
SCORE
98
Wiring of outlets switches and appliances
Date:  June 11, 2014
Value:   $10,000
Contractor: Ben Wilson

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 11, 2014 | Current use: 1-2fam | Permit id: E372191 | Parcel: 0400985010
2014/06/11100009816 Harcourt St Boston MaBen Wilson
SCORE
100
Install 2 recessed lights install 2 under counter lights replace trims for 2 recessed lights replace 2 under counter lights replace 3 closet lights replace 2 dimmers.
Date:  February 8, 2011
Value:   $1,000
Contractor: Thomas Rosher

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: August 8, 2011 | Current use: 7more | Permit id: E63192 | Parcel: 0400985010
2011/02/08100010016 Harcourt St Boston MaThomas Rosher
SCORE
98
Replaced kitchen sink disposal. Dishwasher. And water line to fridge.
Date:  March 21, 2014
Value:   $1,000
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: September 21, 2014 | Current use: Multi | Permit id: Pl345201 | Parcel: 0400985010
2014/03/2110009816 Harcourt St Boston MaPatrick Otoole
SCORE
98
Replaced kitchen sink and dishwasher and vanity.
Date:  February 7, 2014
Value:   $1,200
Contractor: Patrick Otoole

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: August 7, 2014 | Current use: 1-2fam | Permit id: Pl324988 | Parcel: 0400985010
2014/02/0712009816 Harcourt St Boston MaPatrick Otoole
SCORE
74
Bathroom renovation
Date:  December 24, 2013
Value:   $36,000
Contractor: Marcela Maggi

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: June 24, 2014 | Current use: Other | Permit id: Sf308713 | Parcel: 0400985010
2013/12/24360007416 Harcourt St Boston MaMarcela Maggi
SCORE
92
Rewire bedroom due to water damage from sprinkler break
Date:  February 27, 2015
Value:   $3,500
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: August 27, 2015 | Current use: Multi | Permit id: E450306 | Parcel: 0400985010
2015/02/2735009216 Harcourt St Boston MaGeorge Hatzis
SCORE
83
Install new fixtures including toilet sink lavory and new shower valve.
Date:  June 10, 2010
Value:   $1,200
Contractor: Rachid Zraizaa

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: December 10, 2010 | Current use: 6unit | Permit id: Pl29234 | Parcel: 0400985010
2010/06/1012008316 Harcourt St Boston MaRachid Zraizaa
SCORE
82
Demo kitchen cabs and insall new ones new countertops sink faucet lights bathroom replase vanity mirror faucet and light paint unit
Date:  May 19, 2011
Value:   $17,250
Contractor: James Mcnulty

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: November 19, 2011 | Current use: 7more | Permit id: Sf77685 | Parcel: 0400985010
2011/05/19172508216 Harcourt St Boston MaJames Mcnulty
SCORE
92
Repair and maintanance of 103 units due to power surge created from nstar electric.
Date:  March 30, 2012
Value:   $25,000
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: September 30, 2012 | Current use: 7more | Permit id: E128403 | Parcel: 0400985010
2012/03/30250009216 Harcourt St Boston MaGeorge Hatzis
Refreshing of common spaces: new paint on walls and ceilings remove and replace carpeting replace light fixtures with new.
Date:  October 1, 2015
Value:   $327,669

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: April 1, 2016 | Current use: Comm | Permit id: Sf525213 | Parcel: 0400985010
2015/10/013276699516 Harcourt St Boston Ma
SCORE
100
5a renovet kitchen cabinet and install new cabinet granit counter top refinish floors install new doors and closet doors installnew crown molding and pant walls ciling and doors in unit
Date:  October 1, 2013
Value:   $24,600
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: April 1, 2014 | Current use: Multi | Permit id: Sf291103 | Parcel: 0400985010
2013/10/012460010016 Harcourt St Boston MaArtur Sharra
SCORE
99
To do the plumbing for a new shower staul bathroom sink and toilet. Apt# 4f
Date:  June 25, 2014
Value:   $2,600
Contractor: Charles Murphy

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: December 25, 2014 | Current use: Multi | Permit id: Pl377913 | Parcel: 0400985010
2014/06/2526009916 Harcourt St Boston MaCharles Murphy
SCORE
99
Replace dimmers in unit #9c
Date:  March 28, 2012
Value:   $1,500
Contractor: Michael Grady

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: September 28, 2012 | Current use: 7more | Permit id: E127791 | Parcel: 0400985010
2012/03/2815009916 Harcourt St Boston MaMichael Grady
SCORE
100
Work demage unit 1h demolatiom new instulision and repairs walls and cieling install sheetrock plaster painting
Date:  March 3, 2015
Value:   $7,450
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: September 3, 2015 | Current use: Multi | Permit id: Sf451071 | Parcel: 0400985010
2015/03/03745010016 Harcourt St Boston MaArtur Sharra
SCORE
100
Installation of recessed lighting throughout kitchen reno misc outlets unit 5g
Date:  January 30, 2015
Value:   $10,500
Contractor: James Carleton

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: July 30, 2015 | Current use: Multi | Permit id: E444819 | Parcel: 0400985010
2015/01/301050010016 Harcourt St Boston MaJames Carleton
SCORE
76
In this job is included cosmetic bathroom and kitchen remodeling remove old kitchen cabinets and install new cabinets remove old tile from floors and install new tile on kitchen and bathroom floors also on bathroom walls plastering painting install new trim work replace bathroom venety and countertops replace kitchen countertop install new floor.; unit 9e
Date:  May 17, 2013
Value:   $8,500
Contractor: Andris Kuskis

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: November 17, 2013 | Current use: Multi | Permit id: Sf245407 | Parcel: 0400985010
2013/05/1785007616 Harcourt St Boston MaAndris Kuskis
SCORE
93
Addition 3 lights move gfci plug install vanity light gabinet.
Date:  December 26, 2013
Value:   $1,000
Contractor: Hugo Lobos

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: June 26, 2014 | Current use: 1-2fam | Permit id: E315425 | Parcel: 0400985010
2013/12/2610009316 Harcourt St Boston MaHugo Lobos
SCORE
100
Remove and replace kitchen cabinets no structural changes
Date:  June 17, 2014
Value:   $9,000
Contractor: Richard Fallone

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 17, 2014 | Current use: Multi | Permit id: Sf374283 | Parcel: 0400985010
2014/06/17900010016 Harcourt St Boston MaRichard Fallone
SCORE
92
Install new gfci receptacles on new counter tops on existing wiring and add 1 dedicated microwave receptacle.
Date:  February 12, 2014
Value:   $900
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: August 12, 2014 | Current use: Multi | Permit id: E326101 | Parcel: 0400985010
2014/02/129009216 Harcourt St Boston MaGeorge Hatzis
SCORE
86
Remove cabinets and appliances in kitchen move electrical panel to adjacent wall patch plaster and install new cabinets unit 4 e
Date:  October 23, 2012
Value:   $14,500
Contractor: Edward Cummings

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: April 23, 2013 | Current use: Multi | Permit id: Sf191645 | Parcel: 0400985010
2012/10/23145008616 Harcourt St Boston MaEdward Cummings
SCORE
100
Kitchen and bathroom renovation. New cabinets in kitchen new tiles in bathroom
Date:  June 13, 2013
Value:   $13,000
Contractor: Edward Ordway

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 13, 2013 | Current use: Mixed | Permit id: Sf253291 | Parcel: 0400985010
2013/06/131300010016 Harcourt St Boston MaEdward Ordway
SCORE
83
Changing fixtures
Date:  March 22, 2010
Value:   $1,000
Contractor: Rachid Zraizaa

Client: Copley Pl Coope | Permit type: Plumbing permit | Expiration date: September 22, 2010 | Current use: 7more | Permit id: Pl18688 | Parcel: 0400985010
2010/03/2210008316 Harcourt St Boston MaRachid Zraizaa
SCORE
100
Installation of new outlets in kitchen and four recessed lights in kitchen. Change bath light in bathroom.
Date:  July 31, 2013
Value:   $2,000
Contractor: Patrick Ostiguy

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: January 31, 2014 | Current use: Multi | Permit id: E260749 | Parcel: 0400985010
2013/07/31200010016 Harcourt St Boston MaPatrick Ostiguy
SCORE
92
Installed recess lights old work
Date:  September 27, 2010
Value:   $1,800
Contractor: George Hatzis

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: March 27, 2011 | Current use: 1unit | Permit id: E44300 | Parcel: 0400985010
2010/09/2718009216 Harcourt St Boston MaGeorge Hatzis
SCORE
97
Remodel 2 bathrooms
Date:  July 7, 2014
Value:   $3,300
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: January 7, 2015 | Current use: Other | Permit id: E381037 | Parcel: 0400985010
2014/07/0733009716 Harcourt St Boston MaJohn O Connell
SCORE
100
Kitchen remodel. Relocate receptacles install 2 recessed lights. Bathroom #1 remove lights install 3 recessed lights. Bathroom #2 remove lights install 3 recessed lights.; unit 9e
Date:  June 19, 2013
Value:   $1,700
Contractor: Thomas Rosher

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 19, 2013 | Current use: Multi | Permit id: E255362 | Parcel: 0400985010
2013/06/19170010016 Harcourt St Boston MaThomas Rosher
SCORE
61
Remove cabinets countertops and tile flooring. Install new cabinets countertops and tile flooring. All work in unit #4a -
Date:  January 29, 2014
Value:   $12,000
Contractor: Mark Daviau

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: July 29, 2014 | Current use: Multi | Permit id: Sf320951 | Parcel: 0400985010
2014/01/29120006116 Harcourt St Boston MaMark Daviau
SCORE
97
Remodel bathroom
Date:  June 26, 2014
Value:   $1,300
Contractor: John O Connell

Client: Copley Pl Coope | Permit type: Electrical permit | Expiration date: December 26, 2014 | Current use: Multi | Permit id: E378099 | Parcel: 0400985010
2014/06/2613009716 Harcourt St Boston MaJohn O Connell
SCORE
100
Bathroom remodeling . Remuve the tiles on walls and floor remove the tub innstall new shower durock install tile in shower area and floor new sing plaster and painting work in unit 4f
Date:  June 18, 2014
Value:   $12,830
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: December 18, 2014 | Current use: Multi | Permit id: Sf375064 | Parcel: 0400985010
2014/06/181283010016 Harcourt St Boston MaArtur Sharra
SCORE
66
Rrenovet kitchen and bathrom in unit 6. J
Date:  April 23, 2010
Value:   $23,000
Contractor: Artur S Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: October 23, 2010 | Current use: Multi | Permit id: Sf22944 | Parcel: 0400985010
2010/04/23230006616 Harcourt St Boston MaArtur S Sharra
SCORE
98
Unit 4l gas stove
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Pl Coope | Permit type: Gas permit | Expiration date: December 13, 2014 | Current use: Multi | Permit id: G359096 | Parcel: 0400985010
2014/06/13200009816 Harcourt St Boston MaRobert Trethewey
SCORE
100
Renovation to;two bathrooms in unit 6 c remove sink and vanity tub wall and floor tiles. Install new standup shower door rack tiles around bathroom area and flore install new sheetrock plaster and paint
Date:  July 8, 2014
Value:   $20,555
Contractor: Artur Sharra

Client: Copley Pl Coope | Permit type: Short form bldg permit | Expiration date: January 8, 2015 | Current use: Multi | Permit id: Sf381634 | Parcel: 0400985010
2014/07/082055510016 Harcourt St Boston MaArtur Sharra
Bfd smoke/co inspection and
Date:  August 30, 2016

Client: Mass Turnpike Authority | Expiration date: October 29, 2016 | Current use: 1unit | Permit id: Smk628945 | Parcel: 0400985000
2016/08/3009516 Harcourt St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 20, 2016

Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk587073 | Parcel: 0400985000
2016/05/2009516 Harcourt St Boston Ma
Stand;dumpster at curb 24 hours
Date:  November 23, 2015

Client: Copley Place Cooperative | Permit type: Street occupancy permit | Expiration date: December 19, 2015 | Permit id: Occu-517126 | Parcel: 0400985010
2015/11/2309516 Harcourt St Boston Ma
Repair gas leak; 5x4; rdwy; ; boston police area a; 343=4239; street closures9: am to 3: pm; ; extension; no work; 11 25-11 29
Date:  June 15, 2015

Client: Mass Turnpike Authority | Permit type: Excavation permit | Expiration date: December 22, 2015 | Permit id: Exca-482791 | Parcel: 0400985000
2015/06/1509516 Harcourt St Boston Ma
Stand boom truck at curb erect and maintain pedestrian protective staging on sidewalk stand truck at curb 930am to 330pm
Date:  December 14, 2015

Client: Copley Place Cooperative | Permit type: Street occupancy permit | Expiration date: December 17, 2015 | Permit id: Occu-409905 | Parcel: 0400985010
2015/12/1409516 Harcourt St Boston Ma
SCORE
95
Replace kitchen cabinets. Remove non-load-bearing wall between kitchen and dining room. Remove carpet/tile floor and install hardwood floors in dining room living room kitchen hall and bedrooms. In master bedroom - remove bedroom door and adjacent closet. Install new bedroom door at beginning of hall. Install crown moulding and baseboard trim in all rooms. In bathrooms replace toilets vanities and sinks. Replace ceiling flush mount lights with recessed lights
Date:  January 15, 2015
Value:   $27,000
Contractor: Richard Smith

Client: Copley Place Cooperative | Permit type: Short form bldg permit | Expiration date: July 15, 2015 | Current use: 1-2fam | Permit id: Sf441622 | Parcel: 0400985010
2015/01/15270009516 Harcourt St Boston MaRichard Smith
Bfd smoke/co inspection and
Date:  April 26, 2017

Client: Mass Turnpike Authority | Expiration date: June 25, 2017 | Current use: 1unit | Permit id: Smk695447 | Parcel: 0400985000
2017/04/2609516 Harcourt St Boston Ma
SCORE
72
Moving two fire sprinklers four feet
Date:  March 10, 2017
Contractor: Charlie Rodgers

Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk674510 | Parcel: 0400985000
2017/03/1007216 Harcourt St Boston MaCharlie Rodgers
Stand yd dumpster at curb; two spaces; 7am-4pm
Date:  February 2, 2017

Client: Mass Turnpike Authority | Permit type: Street occupancy permit | Expiration date: February 7, 2017 | Permit id: Occu-678386 | Parcel: 0400985000
2017/02/0209516 Harcourt St Boston Ma
SCORE
98
Powderoom / kitchen / guestbath / masterbath remodel/update
Date:  June 13, 2014
Value:   $20,000
Contractor: Robert Trethewey

Client: Copley Place Cooperative | Permit type: Plumbing permit | Expiration date: December 13, 2014 | Current use: Multi | Permit id: Pl359094 | Parcel: 0400985010
2014/06/13200009816 Harcourt St Boston MaRobert Trethewey
SCORE
100
Install 1/8 copper water line around cabinets. Connect plumbing to sink and faucet for two bathrooms. Connect up kitchen appliances and sink.
Date:  March 10, 2015
Value:   $1,500
Contractor: Matthew Nelson

Client: Copley Place Cooperative | Permit type: Plumbing permit | Expiration date: September 10, 2015 | Current use: 1-2fam | Permit id: Pl450787 | Parcel: 0400985010
2015/03/10150010016 Harcourt St Boston MaMatthew Nelson
SCORE
97
Take out old tub/shower. Install new walk in shower. Re-install toilet same location install sink same location
Date:  December 26, 2013
Value:   $2,300
Contractor: Carlos Lopes

Client: Copley Place Cooperative | Permit type: Plumbing permit | Expiration date: June 26, 2014 | Current use: Multi | Permit id: Pl315530 | Parcel: 0400985010
2013/12/2623009716 Harcourt St Boston MaCarlos Lopes
SCORE
99
Bathroom rehab/small kitchen - unit #8f
Date:  January 25, 2012
Value:   $1,500
Contractor: Charles Murphy

Client: Copley Place Cooperative | Permit type: Plumbing permit | Expiration date: July 25, 2012 | Current use: Multi | Permit id: Pl116273 | Parcel: 0400985010
2012/01/2515009916 Harcourt St Boston MaCharles Murphy
SCORE
98
Replace two tubs with two shower stalls. Replaced w/c and lavatory.
Date:  December 8, 2015
Value:   $10,000
Contractor: Patrick Otoole

Client: Copley Place Cooperative | Permit type: Plumbing permit | Expiration date: June 8, 2016 | Current use: Multi | Permit id: Pl545861 | Parcel: 0400985010
2015/12/08100009816 Harcourt St Boston MaPatrick Otoole
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.