Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: September 11, 2009 Permit type: Delead | Permit id: Ea09126 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 9, 2009 Permit type: Delead | Permit id: Ea12269 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 9, 2009 Permit type: Delead | Permit id: Ea12611 | |||||
Seal building: stucco seal all accesses to the entire bldg at 1st sty as follows. Building : at 1st floor front plywood and stucco seal one (1) Date: November 4, 2010 Permit type: Gc | Permit id: Eb14108 | |||||
SCORE 82 Equipment work Date: February 27, 2012 Contractor: Ny Developers And Manageme Permit status: Permit issued | Permit id: 32043253601 | |||||
Plywood and stuccoe sealtotal of three (3) doors as follows one (1) front door, one rear door (1) in basement. One (1) front entrance door on ist flo Date: November 29, 2010 Permit type: Gc | Permit id: Eb15538 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03510 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: September 25, 2009 Permit type: Util | Permit id: Ea11034 | |||||
Apt #2f) at kitchen, living room and bathroom : install (1 each rooms) window guard, and at bedroom#3 and bedroom#5 install (2 each rooms) window guar Date: November 20, 2008 Value: $299 Permit type: Gc | Permit id: E916400 | |||||
Install w/g complete at bathroom, reinstall w/g at kitchen, bedroom and living room Date: December 4, 2008 Value: $40 Permit type: Gc | Permit id: E918118 | |||||
SCORE 82 Equipment work Date: February 27, 2012 Contractor: Ny Developers And Manageme Permit status: Permit issued | Permit id: 32043253601 | |||||
Install w g complete at bathroom, reinstall w g at kitchen, bedroom and living room Date: December 4, 2008 Value: $40 Permit type: Gc | Permit id: E918118 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: September 25, 2009 Permit type: Util | Permit id: Ea11034 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03510 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 12, 2008 Permit type: Delead | Permit id: E834840 | |||||
Complete rewire of boiler with new roll out switch. Install new gas valve, and transformer. Install new thermo couplyn, and pilot assembly on boiler Date: November 9, 2009 Permit type: Heat | Permit id: Ea15277 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 12, 2009 Permit type: Delead | Permit id: Ea06516 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: June 1, 2006 Permit type: Delead | Permit id: E635316 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03070 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 9, 2009 Permit type: Util | Permit id: Ea03048 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 9, 2009 Permit type: Util | Permit id: Ea03048 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03070 |