Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Installation of a flush-mount grid tie 4. 23kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Date: March 23, 2011 Contractor: Solarcity Client: Patrick Murphy | Applicant: Solarcity | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 25, 2011 | Current use: Single family d | |||||
SCORE 95 Replace sewer service in-property, occupy sidewalk & street with equipment only Date: May 6, 2013 Contractor: Drain O Rooter Client: Patrick Murphy | Applicant: Drain O Rooter | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 95 Installation of a flush-mount grid tie 4. 23kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Client: Patrick Murphy | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 25, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01144 |