Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration Date: November 18, 1993 Permit status: Permit issued | Permit id: 20007947701 | |||||
Doh clean and dust-wipe only: floor in (stairs from first to second floor public hallway) floor in (second floor public hallway from stairs) and Date: July 13, 2012 Value: $145 Permit type: Delead | Permit id: Ed02407 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 27, 2012 Value: $1,033 Permit type: Delead | Permit id: Ed13064 | |||||
At apt #1- at bathroom: remove obstructions from water closet and tub in order to restore to proper working order and seal around toilet base at floo Date: June 13, 2013 Value: $66 Permit type: Plumb | Permit id: Ed24483 | |||||
SCORE 100 Alteration Date: November 18, 1993 Contractor: Same Permit status: Permit issued | Permit id: 20007947701 | |||||
SCORE 100 Date: September 21, 2016 Contractor: George Bateman Client: Jay Singer | Client Address: P.O. Box 190388 Brooklyn Ny 11219 | Client Phone: (212) 289-4300 | Client Company: 1529 Vyse Holdings Llc | Permit status: Initial | Permit id: 240155844 | |||||
SCORE 59 Date: November 18, 1993 Contractor: Porfiro Feliciano Diaz Client: Porfirio Diaz | Client Address: 1216 Simpson St. Bx Ny 10460 | Client Phone: (212) 842-2499 | Permit status: Initial | Permit id: 200079477 | |||||
SCORE 82 Equipment work Date: September 21, 2016 Contractor: Gsb Plumbing And Heating Co Permit status: Permit issued | Permit id: 24015584401 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 16, 2012 Permit type: Delead | Permit id: Ed04260 | |||||
At boiler room, make all necessary repairs to hot water heater to restore hot water to building. Note: contractor must contact h. P. D. @ 212-42 Date: February 16, 2012 Permit type: Plumb | Permit id: Ec20591 | |||||
Make all necessary repairs aand file for new installation of 75 gal tank gas hot water heater and legalize to code at boiler room remove gas h/w hea Date: January 26, 2012 Permit type: Heat | Permit id: Ec18895 | |||||
Make all necessary repairs aand file for new installation of 75 gal tank gas hot water heater and legalize to code at boiler room remove gas h w hea Date: January 26, 2012 Permit type: Heat | Permit id: Ec18895 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 5, 2013 Permit type: Delead | Permit id: Ed15865 | |||||
As per requirement contract with hpd. (apt# 1) provide and install total (4) new window guard as follows: bedroom#1 (1), bedoom#2 (1), bedr Date: December 19, 2012 Permit type: Gc | Permit id: Ed12190 |