Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 6000watt output of grid interactive inverter, 40a backfeed breaker into main 200a panel. Add circuit for monitoring. Date: June 14, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 26, 2016 | Expiration date: June 14, 2017 | Current use: Single family / duplex | Permit id: 6540645 | |||||
SCORE 99 Complete remodel & room addition. Date: November 7, 2002 Contractor: Orca Electric Llp Permit type: Electrical | Permit status: Permit finaled | Completion date: March 25, 2003 | Expiration date: November 7, 2003 | Current use: Single family / duplex | Permit id: 6006558 | |||||
SCORE 95 Install new furnace Date: September 17, 2002 Contractor: Cardinal Heating And A C Inc Applicant: Cardinal Heating & A/c Inc | Permit type: Mechanical | Permit status: Permit finaled | Completion date: March 14, 2003 | Expiration date: March 17, 2004 | Current use: Single family / duplex | Permit id: 6003900 |