Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install 80ft x 120ft tent no cooking, no propane, no heaters, 16ft x 80ft stage no lighting, no sidewalls:open tent 4ft x 16ft stage installed june 1-6, 2012 event on june 5, 2012 11: am - 3: pm Date: March 20, 2012 Client: Sisters Of The Visitation Of Georgetown | Applicant: Sisters Of The Visitation Of George; Woody Wickliffe | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200067 | |||||
Construct new 5 sf greenhouse addition to existing potting shed. Includes associated site improvements, plumbing, electrical, foundation and greenhouse structure. Date: November 22, 2013 Client: Georgetown Visitation Prep School | Applicant: David Fontana Mckeever Services Corp. | Permit type: Addition | Permit status: Permit issued | Permit id: B1306645 | |||||
Interior replacement of fire alarm control panel and initiating devices. Georgetown visitation preparatory school gymnasium Date: November 12, 2013 Client: Sisters Of The Visitation Of Georgetown | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1400683 | |||||
Install 80ft x 120ft tent no cooking, no propane, no heaters, no lighting, 16ft x 80ft stage no sidewalls, open tent 4ft x 16ft stage installed may 31-jun 5, 2013 event jun 4, 2013 11: am - 3: pm Date: May 3, 2013 Client: Sisters Of The Visitation Of Georgetown | Applicant: Woody Wickliffe | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300177 | |||||
Electrical Date: December 20, 2013 Client: Sisters Of The Visitation Of Georgetown | Applicant: John W. Hyre | Permit status: Completed | Permit id: E1402169 | |||||
Renovation of existing grass athletic field into new slightly larger synthetic turf athletic field. Work includes grading, tree removal, storm water management new seven foot chain link fence. Retaining wall under seperate permit number using same plans. Date: June 27, 2014 Client: Georgetown Visitation Prep School | Applicant: David Fontana Msc | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1402726 | |||||
Install 80ft x120ft tent no cooking, no propane, no heaters, no lighting 16ft x 80ft platform no sidewalls, open tent 4ft x 16ft platform installed may - jun 4, 2014 event jun 3, 2014 8am - 6pm Date: March 31, 2014 Client: Sisters Of The Visitation Of Georgetown | Applicant: Woody Wickliffe | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1400089 | |||||
Construct new 4 ft long retaining wall around new synthetic turf field. Wall is six inches away from property line. Alteration to field under seperate permit using same plans. Date: June 27, 2014 Client: Georgetown Visitation Prep | Applicant: David Fontana Msc | Permit type: Retaining wall | Permit status: Permit issued | Permit id: Rw1400039 | |||||
SCORE 96 Electrical Date: December 20, 2013 Contractor: John W. Hyre Client: Sisters Of The Visitation Of Georgetown | Permit status: Completed | Permit id: E1402169 | |||||
Plumbing and gas Date: August 4, 2015 Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: P1507975 | |||||
SCORE 93 Plumbing and gas Date: October 9, 2015 Contractor: Matt Losignor Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: P1600253 | |||||
SCORE 96 Electrical Date: October 30, 2015 Contractor: Robert S. Watts Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: E1600943 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildpukv%2fc%2fqbr%2bmrunf8ipk9 Date: July 3, 2015 Client: Mary Sales Mcnabb | Permit type: Electrical | Permit status: Permit issued | Permit id: E13082787 | |||||
SCORE 96 Electrical Date: December 20, 2013 Contractor: John W. Hyre Client: Sisters Of The Visitation Of Georgetown | Permit status: Completed | Permit id: E1402169 | |||||
SCORE 93 Interior replacement of fire alarm control panel and initiating devices. Georgetown visitation preparatory school gymnasium Date: November 12, 2013 Contractor: Sam Hollen Ramco Of Dc Inc Client: Sisters Of The Visitation Of Georgetown | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400683 | |||||
SCORE 56 Install 80ft x 120ft tent no cooking, no propane, no heaters, 16ft x 80ft stage no lighting, no sidewalls:open tent 4ft x 16ft stage installed june 1-6, 2012 event on june 5, 2012 11: am - 3: pm Date: March 20, 2012 Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200067 | |||||
SCORE 96 Construct new 5 sf greenhouse addition to existing potting shed. Includes associated site improvements, plumbing, electrical, foundation and greenhouse structure. Date: November 22, 2013 Contractor: David Fontana Mckeever Services Corp Client: Georgetown Visitation Prep School | Permit type: Addition | Permit status: Permit issued | Permit id: B1306645 | |||||
SCORE 96 Install 80ft x 120ft tent no cooking, no propane, no heaters, no lighting, 16ft x 80ft stage no sidewalls, open tent 4ft x 16ft stage installed may 31-jun 5, 2013 event jun 4, 2013 11: am - 3: pm Date: May 3, 2013 Contractor: Woody Wickliffe Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300177 | |||||
SCORE 86 Renovation of existing grass athletic field into new slightly larger synthetic turf athletic field. Work includes grading, tree removal, storm water management new seven foot chain link fence. Retaining wall under seperate permit number using same plans. Date: June 27, 2014 Contractor: David Fontana Msc Client: Georgetown Visitation Prep School | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1402726 | |||||
SCORE 96 Install 80ft x120ft tent no cooking, no propane, no heaters, no lighting 16ft x 80ft platform no sidewalls, open tent 4ft x 16ft platform installed may - jun 4, 2014 event jun 3, 2014 8am - 6pm Date: March 31, 2014 Contractor: Woody Wickliffe Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1400089 | |||||
SCORE 86 Construct new 4 ft long retaining wall around new synthetic turf field. Wall is six inches away from property line. Alteration to field under seperate permit using same plans. Date: June 27, 2014 Contractor: David Fontana Msc Client: Georgetown Visitation Prep | Permit type: Retaining wall | Permit status: Permit issued | Permit id: Rw1400039 | |||||
SCORE 56 Install 80ft x 120ft tent no cooking, no propane, no heaters, 16ft x 80ft stage no lighting, no sidewalls:open tent 4ft x 16ft stage installed june 1-6, 2012 event on june 5, 2012 11: am - 3: pm Date: March 20, 2012 Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200067 | |||||
SCORE 93 Interior replacement of fire alarm control panel and initiating devices. Georgetown visitation preparatory school gymnasium Date: November 12, 2013 Contractor: Sam Hollen Ramco Of Dc, Inc Client: Sisters Of The Visitation Of Georgetown | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400683 | |||||
SCORE 96 Electrical Date: December 20, 2013 Contractor: John W. Hyre Client: Sisters Of The Visitation Of Georgetown | Permit status: Completed | Permit id: E1402169 | |||||
SCORE 93 Porch decking and balustrade to be removed temporarily; ground-floor wall to be partially demolished for larger openings. Associated structure brick pavers and existing vegetation to be removed. Demolition of dining and kitchen are to prepare for renovations. Date: May 26, 2015 Contractor: Sherri Humphrise Client: Sisters Of The Visitation Of Georgetown | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500554 | |||||
SCORE 82 Four soil borings will be advanced at the locations indicated on the soil boring plan. The borings will be advanced using the hollow stem auger method, will extend to feet below existing grades and will be 6 inches in diameter. The borings will be advanced and abandoned in a manner consistent with ddoe practices and procedures. Please reference the project work plan for further details. Date: March 19, 2015 Client: Robert Waechter Capitol Projects Management | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500211 | |||||
SCORE 96 Install 20ft x 60ft tent, 20ft x 20ft tent no cooking, no stages, no smoking installed nov 4 - 9, 2015 events nov 6 11am - 9pm, nov 7 10am - 4pm Date: October 26, 2015 Contractor: Woody Wickliffe Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600026 | |||||
SCORE 96 Install 50ft x 100ft tent no lighting, no generators, no cooking, no propane, 50ft x 100ft tent no heaters, no smoking, no sidewalls, 16ft x 80ft platform open tent 4ft x 16ft platform Date: April 22, 2015 Contractor: Woody Wickliffe Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1500102 | |||||
SCORE 95 Valve replacement (like for like) condition: submit license application on file. Est. Cost of work: 12,319. 00 Date: September 9, 2015 Contractor: Schindler Elevator Corp Client: Sisters Of The Visitation Of Georgetown | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1503225 | |||||
SCORE 96 Electrical Date: October 30, 2015 Contractor: Robert S. Watts Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: E1600943 | |||||
SCORE 93 Plumbing and gas Date: October 9, 2015 Contractor: Matt Losignor Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: P1600253 | |||||
Plumbing and gas Date: August 4, 2015 Client: Sisters Of The Visitation Of Georgetown | Permit status: Permit issued | Permit id: P1507975 | |||||
SCORE 62 Install 50ft x 100ft tent, 50ft x 100ft tent, 16ft x 80ft platform, 4ft x 16ft platform no generators, no lighting, no cooking, no heaters, no propane, no smoking, no sidewalls, open tent installed june 3-8, 2016 event june 7, 2016 11am - 3pm Date: April 21, 2016 Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600113 | |||||
SCORE 96 Install 30ft x 40ft tent no cooking, no stages, no seating, no smoking, 30kw diesel generator installed march 11 - 13, 2016 event march 12, 2016 5: pm - 10: pm Date: February 19, 2016 Contractor: Woody Wickliffe Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600061 | |||||
SCORE 95 Replacement of piston and cylinder on hydraulic elevator system. Replacement piston and cylinder will include a new pvc liner, buffer stand, and pit channel. Estimated cost of work : 75,000. 00 Date: June 28, 2016 Contractor: Schindler Elevator Corp Client: Sisters Of The Visitation Of Georgetown | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1602534 | |||||
SCORE 62 Install 50ft x 100ft tent, 50ft x 100ft tent, 16ft x 80ft platform, 4ft x 16ft platform no generators, no lighting, no cooking, no heaters, no propane, no smoking installed june 2-7, 2017 event june 6, 2017 11: am - 3: pm Date: April 25, 2017 Client: Sisters Of The Visitation Of Georgetown | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1700095 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildpukv%2fc%2fqbr%2bmrunf8ipk9 Date: July 3, 2015 Client: Mary Sales Mcnabb | Permit type: Electrical | Permit status: Permit issued | Permit id: E13082787 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilef2gekeimyv%2bjjtslvt6xb Date: July 23, 2015 Client: Sisters Of The Visitation Of George Sisters Of The Visitation Of | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: G33920494 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildbq%2f3svgqxsbudc44hxcot Date: July 10, 2015 Contractor: Joseph Liska; Mary Mcnabb; Uwe Neumann Client: Mary Mcnabb | Permit type: Mechanical | Permit status: Permit issued | Permit id: Ar21536444 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilef2gekeimyvyh%2fw2pawrzl Date: July 23, 2015 Client: Sisters Of The Visitation Of George Sisters Of The Visitation Of | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P43229394 | |||||
SCORE 86 Modernization of dining room, servery, kitchen, and replacement of gang mens restroom with 2 ada compliant single occupancy unisex restrooms. Mech/plum/elec systems will be updated. Existing fire protection system will be reconfigured. Existing porch enclosed, masonry piers rebuilt, exterior brick patio expanded to create accessible ramps. Date: June 24, 2015 Contractor: Sherri R Permit Service Llc Client: Sisters Of The Visitation Of Georgetown | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1504377 | |||||
SCORE 83 Erect scaffold up to eave of roof on private property. Scaffold to be 3 stories high. Scaffold to be used to perform repairs on roof on entire upper south elevation. Remove cast iron railing and salvage for reuse, remove three courses of slate shingles from eave and salvage for reuse. Remove existing damaged water table metal roof. Haul debris from premises. Install new water table metal roof. Install previously removed slate shingles, providing weather ones to replace broken missing slate shingles. Intall previously removed cast iron railing. Structural wood work to be done by others if needed. All work to remain in kind. Date: July 6, 2017 Contractor: Manny Campos Client: Sisters Of The Visitation Of Georgetown Charitable Assets Trust | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709915 |