SCORE 89 Building renovations office building renovate existing office space(8th flr) as per plans. Date: March 2, 2001 Contractor: Kristi Esposito Client: Faison Enterpri, East Skelly Ll C | Permit id: B01000767 | |||||
SCORE 70 Building renovations office building interior renovations to existing high rise tenant space 18th floor as per plans. Date: April 25, 2001 Contractor: James Gsell Client: Center Cit, Westminister | Permit id: B01001782 | |||||
SCORE 59 Building renovations office building interior renovations to 18th floor of existing high rise office building as per plans. Date: March 27, 2002 Contractor: Jim Gsell Client: Center Cit, Westminister | Permit id: B02000322 | |||||
SCORE 89 General repairs office building alfred deubler Date: August 15, 2003 Contractor: Alfred Deubler Client: Center Cit, Westminister | Permit id: E03006346 | |||||
SCORE 89 Building renovations office building renovations to existing office space as per plans. Date: May 31, 2001 Contractor: Kristi Esposito Client: Insurance Comp, Equitable | Permit id: B01002400 | |||||
SCORE 59 Building renovations office building renovations to existing office space as per plans. Date: July 25, 2001 Contractor: Kristi Espito Client: Insurance Comp, Equitable | Permit id: B01003428 | |||||
SCORE 93 Install mechanical equipment community center add one ac unit & duct bremermann , david - 466-4261 Date: October 24, 2001 Contractor: Bremermann Mechanical Client: Insurance Comp, Equitable | Permit id: M01006684 | |||||
SCORE 89 Building renovations office building renovations to suite 21 of existing office building as per plans. Date: June 4, 2001 Contractor: Kristi Esposito Client: Life Assurance, The Equitable | Permit id: B01002462 | |||||
SCORE 89 Building renovations office building high rise tenant renovation to suite 21 as per plans. Date: October 11, 2002 Contractor: Inotee Rivera Client: Life Assurance, The Equitable | Permit id: B02004110 | |||||
SCORE 86 Building renovations office building renovations to suite # 21 of existing office building as per plans. Date: June 18, 2001 Contractor: Kristi Exposito Client: Assurance Co., Equitable Life | Permit id: B01002786 | |||||
SCORE 86 Building renovations office building tenant renovations to the 9th and 13th floors as per plans tenant - western geophysical Date: October 1, 2001 Contractor: Kathy Dardar Client: Cit Property, Westminster | Permit id: B01004189 | |||||
SCORE 99 Building renovations office building thomas dinkins Date: October 16, 2001 Contractor: Thomas Dinkins Client: Cit Property, Westminster | Permit id: E01007785 | |||||
SCORE 99 Building renovations office building improvements to elevators lobbies,public corridors and bathrooms as per plans. Floors 13th,15th,16th,17th and 24th. Date: April 1, 2002 Contractor: James Rogers Client: Faison Enterpri, East Skelly Ll C | Permit id: B01004846 | |||||
SCORE 99 General repairs office building exterior improvements to consist of new plaza paving, sidewalks, new trees, lighting. Electric interior work in 1st floor lobbys as per plans & dpw approval Date: April 10, 2002 Contractor: James Rogers Client: Faison Enterpri, East Skelly Ll C | Permit id: B02001037 | |||||
SCORE 78 Banner bank or savings & loan association certificate of occupancy to erect a temp banner for hibernia bank 3-8-02 - 4-8-02 Contractor: Charles Rachal Client: Faison Enterpri, East Skelly Ll C | Permit id: B02001104 | |||||
SCORE 99 Building renovations office building improvements to elevator lobbies, public corridors & bath rooms of 16th, 17th & 22nd floors of existing high rise office building as per plans. Date: August 18, 2003 Contractor: James Rogers Client: Faison Enterpri, East Skelly Ll C | Permit id: B03002338 | |||||
SCORE 99 Electrical rewiring office building interior renovations to aetna tenant spa ce Date: August 15, 2001 Contractor: Thomas Dinkins Client: Faison Enterpri, East Skelly Ll C | Permit id: E01006218 | |||||
SCORE 99 General repairs office building switchgear cleaning job #455 Date: October 23, 2001 Contractor: Thomas Dinkins Client: Faison Enterpri, East Skelly Ll C | Permit id: E01007901 | |||||
SCORE 99 Electrical reconnect office building thomas dinkins switch gear cleaning Date: September 18, 2002 Contractor: Thomas Dinkins Client: Faison Enterpri, East Skelly Ll C | Permit id: E02007282 | |||||
SCORE 99 Building renovations office building thomas dinkins Date: April 29, 2003 Contractor: Thomas Dinkins Client: Faison Enterpri, East Skelly Ll C | Permit id: E03003196 | |||||
SCORE 89 Alteration office building alfred deubler Date: August 19, 2003 Contractor: Alfred Deubler Client: Faison Enterpri, East Skelly Ll C | Permit id: E03006413 | |||||
SCORE 89 Building renovations office building renovations to an existing office building ste 2245 as per plans Date: December 3, 2001 Contractor: Kristi Esposito Client: Llc Faison Ent, East Skelly | Permit id: B01004993 | |||||
SCORE 59 Building renovations office building renovation to existing office space, as per plans. Date: November 19, 2001 Contractor: Kristi Esposoto Client: The Equitable L, E Assurance | Permit id: B01005285 | |||||
SCORE 86 Building renovations office building renovations to an existing office building and suite (2250) to include: walls, doors, electrical, plumbing as per plans. Date: January 24, 2002 Contractor: Leroy Griffin Client: Llc, East Skelly | Permit id: B02000037 | |||||
SCORE 89 Building renovations office building renovation of existing tenant space as per plans. Date: May 29, 2002 Contractor: Inotee Rivera Client: Lasalle, Jones Lang | Permit id: B02001885 | |||||
SCORE 61 Building renovations office building interior tenant build-out of 6268sf for law offices as per plans. Date: July 17, 2002 Contractor: Gary N. Krasnow Client: Llc% Faison, East Skelly | Permit id: B02002628 | |||||
SCORE 89 Building renovations office building tenant high rise renovation to the 26th floor lobby and bathrooms as per plans. Date: July 17, 2002 Contractor: Inotee Rivera Client: Management, Compass | Permit id: B02002655 | |||||
SCORE 99 Building renovations office building thomas dinkins Date: July 22, 2002 Contractor: Thomas Dinkins Client: Management, Compass | Permit id: E02005563 | |||||
SCORE 89 Building renovations office building interior renovations,suite 2400,as per plans. Date: October 23, 2002 Contractor: Kristi Esposito Client: Assurance Co., Equitable Life | Permit id: B02004470 | |||||
SCORE 89 Building renovations office building renovation of existing tenant space as per plans. Date: January 2, 2003 Contractor: Inotee Rivera Client: La Salle, Jones Lang | Permit id: B02005187 | |||||
SCORE 89 General repairs office building alfred deubler Date: January 8, 2003 Contractor: Alfred Deubler Client: La Salle, Jones Lang | Permit id: E03000155 | |||||
SCORE 89 Building renovations office building renovate existing office space as per plans. Date: January 14, 2003 Contractor: Kristi Esposito Client: Llc, East Skelly | Permit id: B02005649 | |||||
SCORE 86 Building renovations office building tenant renovations to suite 13 of existing office building as per plans. Date: April 14, 2003 Contractor: Leroy Griffin Client: Assurance Co., Equitable Life | Permit id: B03001639 | |||||
SCORE 89 Alteration office building alterations to existing office building as per plans. Date: April 14, 2003 Contractor: Kristi Esposito Client: Westminster Cit, Center | Permit id: B03001654 | |||||
SCORE 98 Building renovations fast food service renovate exsting wendys hamburger rest. Into a mcdonalds hamburger rest. As per plans. Elec.,plumbing and mech. Date: June 19, 2003 Contractor: Diane Hickman Client: Insurance,Co, Equitable | Permit id: B03002593 | |||||
SCORE 98 Alteration fast food service construct a handicapped ramp at existing fast food restaurant(mc donalds) as per sketch,state fire marshals letter dated 10 20 03. Date: October 22, 2003 Contractor: Diane Hickman Client: Insurance,Co, Equitable | Permit id: B03005656 | |||||
SCORE 93 Install mechanical equipment restaurant 49 and under install 2-fry master, 2-garland, 2-a. S. Amtimes co toasters, deep fryer, star grill . David bremermann - 466-4261 Date: September 29, 2003 Contractor: Bremermann Mechanical Client: Insurance,Co, Equitable | Permit id: M03005948 | |||||
SCORE 93 Install mechanical equipment restaurant 49 and under install 2-meaco oven, pizza warmer, 4 m-piml overand micro wave david bremermann - 466-4261 Date: September 29, 2003 Contractor: Bremermann Mechanical Client: Insurance,Co, Equitable | Permit id: M03005949 | |||||
SCORE 93 Install mechanical equipment restaurant 49 and under install 2-ovens,2-fry master,amer. Rermawgmt warmer toaster , deep fry david bremermann - 466-4261 4 range hood Date: September 29, 2003 Contractor: Bremermann Mechanical Client: Insurance,Co, Equitable | Permit id: M03005950 | |||||
SCORE 89 Building renovations office building renovations to an existing office build to inc: adding 2 closets, laminate work, and int painting. No change in egress. Date: August 6, 2003 Contractor: Kristi Esposito Client: Llc, East Skelly | Permit id: B03004160 | |||||
SCORE 89 Alteration office building alfred deubler Date: September 16, 2003 Contractor: Alfred Deubler Client: Llc, East Skelly | Permit id: E03007154 | |||||
SCORE 86 Building renovations office building interior renovations to existing office building(suite 1875) as per plans. Date: August 26, 2003 Contractor: Leroy Griffin Client: Llc, East Skelly | Permit id: B03004264 | |||||
SCORE 70 Building renovations office building renovate existing tenant space as per plans. Date: November 10, 2003 Contractor: James Gsell Client: % Faison Enterp, East Skelly Ll C | Permit id: B03005510 | |||||
SCORE 59 Building renovations office building renovation to public corridor of existg office building as per plans. Contractor: Ashlee Galvis Client: The Equitable L, E Assurance | Permit id: B98003342 | |||||
SCORE 89 Building renovations office building alfred deubler Date: February 20, 2001 Contractor: Alfred Deubler Client: Westminster Cit, Center | Permit id: E01001360 | |||||
SCORE 99 Alteration office building thomas dinkins Date: May 7, 2001 Contractor: Thomas Dinkins Client: Westminster Cit, Center Prop | Permit id: E01003387 | |||||
SCORE 89 Alteration office building alfred deubler Date: May 22, 2001 Contractor: Alfred Deubler Client: Westminster Cit, Center Prop | Permit id: E01003875 | |||||
SCORE 59 Alteration office building alfred deubler Date: May 9, 2002 Contractor: Alfred Deuble Client: Westminster Cit, Center Prop | Permit id: E02003507 | |||||
SCORE 99 Building renovations restaurant 49 and under thomas dinkins Date: July 14, 2003 Contractor: Thomas Dinkins Client: Westminster Cit, Center Prop | Permit id: E03005408 | |||||
SCORE 93 Install mechanical equipment office building add 10-ton, 2-ton ac,duct & grills and elec water heater. David bermermann - 466-4261 Date: July 16, 2001 Contractor: Bremermann Mechanical Client: Westminster Cit, Center Prop | Permit id: M01004471 | |||||
SCORE 89 Alteration office building alfred deubler Date: June 18, 2001 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E01004533 | |||||
SCORE 99 Building renovations office building thomas dinkins Date: June 26, 2001 Contractor: Thomas Dinkins Client: The Equitable L, E Assurance | Permit id: E01004748 | |||||
SCORE 89 Alteration office building alfred deubler Date: March 1, 2002 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E02001581 | |||||
SCORE 59 Install mechanical equipment office building relocate moduline supply air grills - david bremeramann 466-4261 Date: July 16, 2001 Contractor: Bremermann Mechanicla Client: The Equitable L, E Assurance | Permit id: M01004472 | |||||
SCORE 89 Electrical vacancy repairs office building alfred deubler 1st floor suite 1 Date: September 27, 2001 Contractor: Alfred Deubler Client: Mc Donalds, Ronald | Permit id: E01007337 | |||||
SCORE 99 Marquee sign restaurant people and over thomas dinkins Date: September 26, 2003 Contractor: Thomas Dinkins Client: Mc Donalds, Ronald | Permit id: E03007445 | |||||
SCORE 93 Install mechanical equipment restaurant 49 and under install 2-range hood , elec water heater and alter-new duct to existing chill water units , exhaust hood to kitchen d. Bremermann - 466-4261 Date: July 29, 2003 Contractor: Bremermann Mechanical Client: Mc Donalds, Ronald | Permit id: M03004781 | |||||
SCORE 93 Install mechanical equipment restaurant 49 and under install 2-icemaker 2-ton, cooler 1-ton and freezer 3-ton and 3-range hood . Patrick m banbat 486-6097 Date: September 24, 2003 Contractor: Deep South Refrigeration Client: Mc Donalds, Ronald | Permit id: M03005867 | |||||
SCORE 99 Alteration office building thomas dinkins Date: October 9, 2001 Contractor: Thomas Dinkins Client: Westminster Cit, Center Prop | Permit id: E01007623 | |||||
SCORE 89 Alteration office building alfred deubler Date: March 1, 2002 Contractor: Alfred Deubler Client: Westminster Cit, Center Prop | Permit id: E02001577 | |||||
SCORE 89 Alteration office building alfred deubler Date: November 5, 2003 Contractor: Alfred Deubler Client: Westminster Cit, Center Prop | Permit id: E03008538 | |||||
SCORE 93 Install mechanical equipment office building relocate supply bremermann , david 466-4261 Date: October 24, 2001 Contractor: Bremermann Mechanical Client: Westminster Cit, Center Prop | Permit id: M01006685 | |||||
SCORE 89 Alteration office building alterations Date: November 19, 2001 Contractor: Alfred Deubler Client: East Skelly Llc, Faison Enter P | Permit id: E01008684 | |||||
SCORE 89 Alteration office building alfred deubler Date: August 19, 2003 Contractor: Alfred Deubler Client: East Skelly Llc, Faison Enter P | Permit id: E03006412 | |||||
SCORE 89 Alteration office building alfred deubler Date: January 2, 2002 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E02000009 | |||||
SCORE 93 Install mechanical equipment office building relocate modulines david bremermann - 466-4261 Date: December 11, 2001 Contractor: Bremermann Mechanical Client: The Equitable L, E Assurance | Permit id: M01007901 | |||||
SCORE 89 Alteration office building alfred deubler Date: March 1, 2002 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E02001578 | |||||
SCORE 89 Alteration office building alfred deubler Date: March 1, 2002 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E02001580 | |||||
SCORE 89 General repairs office building alfred deubler Date: June 26, 2002 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E02004863 | |||||
SCORE 89 Alteration office building alfred deubler Date: June 4, 2002 Contractor: Alfred Deubler Client: Westminster Cit, Center | Permit id: E02004222 | |||||
SCORE 93 Install mechanical equipment community center relocate supply air grills david bremermann - 466-4261 Date: March 8, 2001 Contractor: Bremermann Mechanical Client: Westminster Cit, Center | Permit id: M01001425 | |||||
SCORE 89 Alteration office building alfred deubler Date: April 1, 2003 Contractor: Alfred Deubler Client: Westminster Cit, Center Prop | Permit id: E03002434 | |||||
SCORE 99 Electrical emergency reconn - after hrs. Office building thomas dinkins repairs to main switch Date: June 23, 2003 Contractor: Thomas Dinkins Client: The Equitable L, E Assurance | Permit id: E03004847 | |||||
SCORE 99 Electrical emergency reconn - after hrs. Office building thomas dinkins preventive maintenance for switchgear Date: September 17, 2003 Contractor: Thomas Dinkins Client: The Equitable L, E Assurance | Permit id: E03007180 | |||||
SCORE 92 Italian american marching club floats 15-05122-spma Date: March 13, 2015 Contractor: Mark David Leblanc Permit type: Float | Permit status: Permit issued | Expiration date: September 13, 2015 | Current use: Business use | Permit id: 15-07648-Eflo | |||||
SCORE 96 Semi - annual inspection Date: January 18, 2016 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical semi-annual maintenance | Permit status: Permit issued | Expiration date: July 18, 2016 | Current use: Business use | Permit id: 16-01737-Eann | |||||
SCORE 96 Semi annual inspection Date: July 20, 2015 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical semi-annual maintenance | Permit status: Permit issued | Expiration date: January 20, 2016 | Current use: Business use | Permit id: 15-21572-Eann | |||||
SCORE 97 Interior renovation of partial floor 25 and partial floor 24: to include minor demolition and build back of offices, conference and storage rooms as per plans. Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Completion date: March 27, 2015 | Expiration date: June 8, 2015 | Current use: Business use | Permit id: 14-30812-Rnvn | |||||
Work descripton: replacement of existing 2-hrexpansion joint system, 2nd floor garage of existing office building,per sketchhistorical import type: permits commercial renovation (structural) nauser: ebrowntracking: 86165633894status: permit issuance activestatus date: 6/13/2012 12:00: amowner: east skelly llcowner address: c/o jones lang lasalle property mgnt 1515 poydras st., #105, new orleans, la 70112owner phone: 5045852697owner edited by: 6/13/2012 by ebrown Date: June 13, 2012 Value: $102,000 Permit type: Renovation (structural) | Permit status: Permit issuance - active | Expiration date: December 13, 2012 | Current use: Business use | Permit id: 12com-00781 | |||||
SCORE 96 Semi annual inspection Date: July 25, 2016 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical semi-annual maintenance | Permit status: Permit issued | Expiration date: January 25, 2017 | Current use: Business use | Permit id: 16-24296-Eann | |||||
SCORE 96 Semi annunal inspection Date: January 10, 2017 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical semi-annual maintenance | Permit status: Permit issued | Expiration date: July 10, 2017 | Current use: Business use | Permit id: 17-00904-Eann | |||||
Work descripton: replacement of existing 2-hrexpansion joint system, 2nd floor garage of existing office building,per sketchhistorical import type: permits commercial renovation (structural) nauser: ebrowntracking: 86165633894status: permit issuance activestatus date: 6 13 2012 12:00: amowner: east skelly llcowner address: c o jones lang lasalle property mgnt 1515 poydras st., #105, new orleans, la 70112owner phone: 5045852697owner edited by: 6 13 2012 by ebrown Date: June 13, 2012 Value: $102,000 Permit type: Renovation (structural) | Permit status: Permit issuance - active | Expiration date: December 13, 2012 | Current use: Business use | Permit id: 12com-00781 | |||||
SCORE 96 Planned entergy cut out/ cut in on 9/12/15 to do switchgear maintenance testing Date: August 25, 2015 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: February 25, 2016 | Current use: Business use | Permit id: 15-25557-Erpr | |||||
Bike share station with 25 racks and a large sign on-street, plus an adjacent off-street payment kiosk, on lasalle at the corner of poydras. Date: November 6, 2017 Permit type: Bike share station | Permit status: Application submitted | Current use: Not applicable | Permit id: 17-37798-Bss | |||||
SCORE 96 Planned entergy cut out cut in on 8 19 17 foe switchgear maintence testing Date: July 27, 2017 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: January 27, 2018 | Current use: Business use | Permit id: 17-26054-Erpr | |||||
SCORE 96 Have entergy do a cut out / cut in on 9/27/14 fro switchgear testing / cleaning Date: September 22, 2014 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: March 22, 2015 | Current use: Business use | Permit id: 14-29412-Erpr | |||||
SCORE 96 Planned entergy cut out/ cut in on 8/20/2016 for switchgear maintenance testing Date: August 9, 2016 Contractor: Alfred Clifton Deubler Jr Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: February 9, 2017 | Current use: Business use | Permit id: 16-26132-Erpr | |||||
SCORE 89 Alteration office building alfred deubler Date: August 19, 2003 Contractor: Alfred Deubler Client: The Equitable L, E Assurance | Permit id: E03006411 | |||||
SCORE 93 Install mechanical equipment office building relocate supply air grills david bremermann - 466-4261 Date: August 7, 2002 Contractor: Bremermann Mechanical Client: The Equitable L, E Assurance | Permit id: M02005051 | |||||
SCORE 89 Building renovations office building alterations of to #21 of exist office space to consist of: remove int. Part. (23 linear ft.) & construct new part. (15 linear ft. Per sketch & fire marshal Date: May 31, 2001 Contractor: Kristi Esposito Client: Life Assuance, The Equitable | Permit id: B01002785 |