Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Ti to include demolition of non-structural partitions millwork ceiling finishes. Construction of non-structural partitions. Mep life safety fire sprinkler under separate permit. Current use: Office | Permit id: #201301147903 | |||||
SCORE 98 Demo of (e) non structural interior partitions doors frames hardware finishes. Construction of new non structural partitions. M. E. P & life safety under seperate permits Current use: Office | Permit id: #201301178215 | |||||
SCORE 98 Basement and 1st floor:architectural revision to app#201301147903 to make minor alaterations to original approved permit. Current use: Office | Permit id: #201302049393 | |||||
SCORE 100 Fire sprinkler system - relocate 9 add 16 & delete 6 pendent sprinklers. T. I. #2013. 01. 17. 8215. Current use: Office | Permit id: #201302059481 | |||||
SCORE 100 1st 2nd and basement floors:install 13 ceiling mount strobes install 29 ceiling horn-strobes install 1 booster panel install 1 signal module install detectors install 11 control relays. Ref app#201301178215 Current use: Office | Permit id: #201302089841 | |||||
SCORE 98 Revision to pa#2013-01-17-8215. To add (5) five additional private office including structural. Current use: Office | Permit id: #201302119906 | |||||
Seismic upgrade and handicap bldg with mis mech & elect. Value: $300,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 25, 1994 | Expiration date: September 6, 1995 | Current use: Garment shops | Permit id: 9411766 | |||||
SCORE 95 Electrical buildout - 2nd floor Date: March 5, 2013 Contractor: C B F Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130305941 | |||||
SCORE 95 Install (52) data cables Date: March 29, 2013 Contractor: Mcmillan Data Communications Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130329721 | |||||
Fire sprinkler system - relocate 9 add 16 & delete 6 pendent sprinklers. T. I. #2013. 01. 17. 8215. Value: $15,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 5, 2013 | Expiration date: January 31, 2014 | Current use: Office | Permit id: 201302059481 | |||||
SCORE 98 Basement and 1st floor:architectural revision to app#201301147903 to make minor alaterations to original approved permit. Permit type: Building permit | Expiration date: June 7, 2013 | Current use: Office | Permit id: #201302049393 | |||||
SCORE 100 Fire sprinkler system - relocate 9 add 16 & delete 6 pendent sprinklers. T. I. #2013. 01. 17. 8215. Permit type: Building permit | Expiration date: August 5, 2013 | Current use: Office | Permit id: #201302059481 | |||||
SCORE 100 1st 2nd and basement floors:install 13 ceiling mount strobes install 29 ceiling horn-strobes install 1 booster panel install 1 signal module install detectors install 11 control relays. Ref app#201301178215 Permit type: Building permit | Expiration date: August 8, 2013 | Current use: Office | Permit id: #201302089841 | |||||
SCORE 98 Revision to pa#2013-01-17-8215. To add (5) five additional private office including structural. Permit type: Building permit | Expiration date: June 19, 2013 | Current use: Office | Permit id: #201302119906 | |||||
SCORE 100 Work category: 4pb; relocate 9 add 16 and delete 6 pendent sprinklers ti#2013-01-17-8215 #1344844 Date: February 6, 2013 Contractor: Rlh Fire Protection Cma Fire Protect Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130206501 | |||||
SCORE 98 Ti to include demolition of non-structural partitions millwork ceiling finishes. Construction of non-structural partitions. Mep life safety fire sprinkler under separate permit. Permit type: Building permit | Expiration date: January 16, 2014 | Current use: Office | Permit id: #201301147903 | |||||
SCORE 98 Demo of (e) non structural interior partitions doors frames hardware finishes. Construction of new non structural partitions. M. E. P & life safety under seperate permits Permit type: Building permit | Expiration date: January 22, 2015 | Current use: Office | Permit id: #201301178215 | |||||
SCORE 87 Tenant improvement: relocate 3 sinks to conform with new cabinet layout shower valve & shower pan test. Date: January 24, 2013 Contractor: M J Moore Design And Construction Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130124675 | |||||
Ti to include demolition of non-structural partitions millwork ceiling finishes. Construction of non-structural partitions. Mep life safety fire sprinkler under separate permit. Value: $160,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 14, 2013 | Expiration date: January 1, 2016 | Current use: Office | Permit id: 201301147903 | |||||
Office buildout for t/i (no demo) creation of offices to 2 floors & basement Value: $562,000 Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: May 1, 2000 | Expiration date: August 23, 2002 | Current use: Office | Permit id: 200005018664 | |||||
Install sprinklzrs and 2 bathroom and partitions Value: $40,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 25, 1984 | Expiration date: June 26, 1985 | Current use: Garment shops | Permit id: 8404379 | |||||
Street space use Permit type: Otc alterations permit | Permit status: Expired | Completion date: July 6, 2000 | Expiration date: January 6, 2001 | Permit id: M13322 | |||||
Funish and install hval systems only Value: $70,000 Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 16, 1999 | Expiration date: October 3, 2001 | Current use: Office | Permit id: 9924367 | |||||
1st 2nd and basement floors:install 13 ceiling mount strobes install 29 ceiling horn-strobes install 1 booster panel install 1 signal module install detectors install 11 control relays. Ref app#201301178215 Value: $17,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 8, 2013 | Expiration date: February 3, 2014 | Current use: Office | Permit id: 201302089841 | |||||
Rev pa 9411766. Overhd racks for clothes distribution. Value: $5,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 2, 1995 | Expiration date: July 2, 1995 | Current use: Garment shops | Permit id: 9503019 | |||||
Fire sprinkler system Permit type: Otc alterations permit | Permit status: Expired | Completion date: September 26, 2000 | Expiration date: January 26, 2001 | Current use: Office | Permit id: 200009261614 | |||||
Demo existing inter partitions abandoned elect/plumb device/ Value: $25,000 Permit type: Otc alterations permit | Permit status: Expired | Completion date: October 12, 1999 | Expiration date: April 12, 2000 | Current use: Garment shops | Permit id: 9921543 | |||||
Sprinkler system Permit type: Otc alterations permit | Permit status: Expired | Completion date: October 10, 2000 | Expiration date: April 10, 2001 | Current use: Office | Permit id: 200010102591 | |||||
Seismic upgrade new handicap access. Entry stairs elev/resrm Value: $150,000 Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: October 16, 1999 | Expiration date: May 22, 2002 | Current use: Office | Permit id: 9922025 | |||||
Street space Permit type: Otc alterations permit | Permit status: Expired | Completion date: March 23, 2000 | Expiration date: September 23, 2000 | Permit id: M12005 | |||||
Parapet bracing Value: $28,500 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 22, 1992 | Expiration date: February 14, 1993 | Current use: Warehouse | Permit id: 9201122 | |||||
Seismic upgrade per attached plans Value: $176,500 Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: January 28, 1991 | Current use: Warehouse | Permit id: 9101205 | |||||
Demo of (e) non structural interior partitions doors frames hardware finishes. Construction of new non structural partitions. M. E. P & life safety under seperate permits Value: $400,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 17, 2013 | Expiration date: January 7, 2016 | Current use: Office | Permit id: 201301178215 | |||||
Revision to pa#2013-01-17-8215. To add (5) five additional private office including structural. Value: $5,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 11, 2013 | Expiration date: February 14, 2014 | Current use: Office | Permit id: 201302119906 | |||||
Alter existing system for seismic upgrade install new backflow device Value: $40,000 Permit type: Otc alterations permit | Permit status: Expired | Completion date: September 6, 2000 | Expiration date: September 6, 2001 | Current use: Office | Permit id: 200009069800 | |||||
Basement and 1st floor:architectural revision to app#201301147903 to make minor alaterations to original approved permit. Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 4, 2013 | Expiration date: February 2, 2014 | Current use: Office | Permit id: 201302049393 | |||||
Add 15 fire sprinklers Value: $3,000 Permit type: Otc alterations permit | Permit status: Expired | Completion date: January 4, 1995 | Expiration date: May 4, 1995 | Current use: Garment shops | Permit id: 9500073 | |||||
Office buildout for t i (no demo) creation of offices to 2 floors & basement Date: May 1, 2000 Value: $562,000 Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: May 1, 2000 | Current use: Office | Permit id: 200005018664 | |||||
To obtain final inspection for work approved under pa# 2000090698 200009261614 2000010102591. All work is complete. Date: November 15, 2016 Value: $1 Permit type: Building permit | Expiration date: March 15, 2017 | Current use: Office | Permit id: #201611152721 | |||||
To obtain final inspection for work approved under pa# 9924367 9500073 all work is complete. Date: November 15, 2016 Value: $1 Permit type: Building permit | Expiration date: March 15, 2017 | Current use: Office | Permit id: #201611152732 | |||||
To obtain final inspection for work approved under pa# 9921543 9922025 200005018664 . All work is complete. Date: November 15, 2016 Value: $1 Permit type: Building permit | Expiration date: March 15, 2017 | Current use: Office | Permit id: #201611152733 | |||||
Demo existing inter partitions abandoned elect plumb device Date: October 12, 1999 Value: $25,000 Permit type: Otc alterations permit | Permit status: Expired | Expiration date: October 12, 1999 | Current use: Garment shops | Permit id: 9921543 | |||||
Seismic upgrade new handicap access. Entry stairs elev resrm Date: October 16, 1999 Value: $150,000 Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: October 16, 1999 | Current use: Office | Permit id: 9922025 | |||||
To confirm use as office. Basement 1st & 2nd flr: modifications of (e) tenant suites to incconstruction of non load bearing partitions selective demo new millwork & finishes. Mep under sep permit mahre na Date: December 29, 2016 Value: $762,000 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: December 29, 2016 | Current use: Office | Permit id: 201612296150 | |||||
Electrical buildout - basement 1st floor Permit status: Complete | Permit id: Ew20130123001 | |||||
Install (52) data cables Permit status: Complete | Permit id: Ew20130329721 | |||||
Electrical buildout - 2nd floor Permit status: Complete | Permit id: Ew20130305941 | |||||
Install 135 workstations Permit status: Filed | Permit id: Ew201612302669 | |||||
Tenantimprovement:relocate3sinkstoconformwithnewcabinetlayout showervalve&showerpantest. Date: January 24, 2013 Permit status: Complete | Expiration date: January 24, 2013 | Permit id: Pp20130124675 | |||||
Workcategory:4pb;relocate9add16anddelete6pendentsprinklersti#2013-01-17-8215 #1344844 Date: February 6, 2013 Permit status: Complete | Expiration date: February 6, 2013 | Permit id: Pw20130206501 | |||||
Electrical buildout - basement 1st floor Permit status: Complete | Permit id: Ew20130123001 | |||||
1st & 2nd flr: mechanical work for ti. New vrv fan coil units new transfer fan and new exhaust fan. No new fsds also ele work maher na Date: January 19, 2017 Value: $100,000 Permit type: Otc alterations permit | Permit status: Filed | Expiration date: January 19, 2017 | Current use: Office | Permit id: 201701197436 | |||||
Install (52) data cables Permit status: Complete | Permit id: Ew20130329721 | |||||
Electrical buildout - 2nd floor Permit status: Complete | Permit id: Ew20130305941 | |||||
Install 135 workstations Permit status: Filed | Permit id: Ew201612302669 | |||||
To confirm use as office. Basement, 1st & 2nd flr: modifications of (e) tenant suites to incconstruction of non load bearing partitions, selective demo, new millwork & finishes. Mep under sep permit mahre na Date: January 5, 2017 Value: $762,000 Permit type: Otc alterations permit | Completion date: June 27, 2017 | Expiration date: December 29, 2016 | Current use: Office | Permit id: 201612296150 | |||||
Basement, 1st & 2nd flr: mechanical work for ti. New vrv fan coil units, new transfer fan and new exhaust fan. No new fsds also ele work maher na Date: February 16, 2017 Value: $100,000 Permit type: Otc alterations permit | Completion date: June 27, 2017 | Expiration date: January 19, 2017 | Current use: Office | Permit id: 201701197436 | |||||
Basement, 1st floor, and 2nd floor: installation of new notification devices on basement and 2nd floor. Removal & relocation of extg notification devices at same level of light fixtures mechanical ducting. Installation of new duct smoke detectors for new mechanical units on 1st fl. & 2nd fl. Date: March 9, 2017 Value: $12,175 Permit type: Otc alterations permit | Completion date: May 8, 2017 | Expiration date: March 8, 2017 | Current use: Office | Permit id: 201703081017 | |||||
Install sprinklzrs and 2 bathroom, and partitions Date: June 26, 1984 Value: $40,000 Permit type: Additions alterations or repairs | Completion date: October 10, 1984 | Expiration date: April 25, 1984 | Current use: Garment shops | Permit id: 8404379 | |||||
Demo existing inter partitions,abandoned elect plumb device Date: October 12, 1999 Value: $25,000 Permit type: Otc alterations permit | Expiration date: October 12, 1999 | Current use: Garment shops | Permit id: 9921543 | |||||
Seismic upgrade new handicap access. Entry stairs elev resrm Date: May 22, 2000 Value: $150,000 Permit type: Additions alterations or repairs | Expiration date: October 16, 1999 | Current use: Office | Permit id: 9922025 | |||||
Funish and install hval systems only Date: October 3, 2000 Value: $70,000 Permit type: Additions alterations or repairs | Expiration date: November 16, 1999 | Current use: Office | Permit id: 9924367 | |||||
Office buildout for t i (no demo), creation of offices to 2 floors & basement Date: August 23, 2000 Value: $562,000 Permit type: Additions alterations or repairs | Expiration date: May 1, 2000 | Current use: Office | Permit id: 200005018664 | |||||
Electric double faced sign, illuminated. Maher na Date: February 9, 2017 Value: $5,000 Permit type: Sign - erect | Completion date: July 26, 2017 | Expiration date: February 2, 2017 | Current use: Office | Permit id: 201702028449 | |||||
Add, relocate and remove fire sprikler per tenant improvment 22 add, 29 relocate, 6 remove. Ref 201612296150. N a ordinance#155-13 Date: February 22, 2017 Value: $26,775 Permit type: Otc alterations permit | Completion date: July 7, 2017 | Expiration date: February 22, 2017 | Current use: Office | Permit id: 201702229845 | |||||
Ti to include demolition of non-structural partitions, millwork ceiling, finishes. Construction of non-structural partitions. Mep, life safety, fire sprinkler under separate permit. Date: January 16, 2013 Value: $160,000 Permit type: Otc alterations permit | Completion date: April 12, 2013 | Expiration date: January 14, 2013 | Current use: Office | Permit id: 201301147903 | |||||
Demo of (e) non structural interior partitions, doors, frames, hardware finishes. Construction of new non structural partitions. M. E. P & life safety under seperate permits Date: January 22, 2013 Value: $400,000 Permit type: Otc alterations permit | Completion date: April 12, 2013 | Expiration date: January 17, 2013 | Current use: Office | Permit id: 201301178215 | |||||
Fire sprinkler system - relocate 9, add 16 & delete 6 pendent sprinklers. T. I. #2013. 01. 17. 8215. Date: February 5, 2013 Value: $15,000 Permit type: Otc alterations permit | Completion date: March 21, 2013 | Expiration date: February 5, 2013 | Current use: Office | Permit id: 201302059481 | |||||
1st, 2nd, and basement floors:install 13 ceiling mount strobes, install 29 ceiling horn-strobes, install 1 booster panel, install 1 signal module, install detectors, install 11 control relays. Ref app#201301178215 Date: February 8, 2013 Value: $17,000 Permit type: Otc alterations permit | Completion date: March 29, 2013 | Expiration date: February 8, 2013 | Current use: Office | Permit id: 201302089841 | |||||
To obtain final inspection for work approved under pa# 200009069800, 200009261614, 2000010102591. All work is complete. Date: November 15, 2016 Value: $1 Permit type: Otc alterations permit | Completion date: December 22, 2016 | Expiration date: November 15, 2016 | Current use: Office | Permit id: 201611152721 | |||||
To obtain final inspection for work approved under pa# 9924367,9500073 all work is complete. Date: November 15, 2016 Value: $1 Permit type: Otc alterations permit | Completion date: December 22, 2016 | Expiration date: November 15, 2016 | Current use: Office | Permit id: 201611152732 | |||||
To obtain final inspection for work approved under pa# 9921543, 9922025, 200005018664 . All work is complete. Date: November 15, 2016 Value: $1 Permit type: Otc alterations permit | Completion date: December 22, 2016 | Expiration date: November 15, 2016 | Current use: Office | Permit id: 201611152733 | |||||
Pinterest - lights, switches, receptacles life safety: speaker strobes Date: February 16, 2017 Permit status: Issued | Permit id: Ew201702163632 | |||||
(1) exterior sign "p" Date: February 9, 2017 Permit status: Complete | Completion date: July 17, 2017 | Permit id: E201702092818 | |||||
Install (52) data cables Date: March 29, 2013 Permit status: Complete | Completion date: April 10, 2013 | Permit id: Ew20130329721 | |||||
C17-0278 pinterest technology infrastructure Date: February 22, 2017 Permit status: Issued | Permit id: Ew201702223713 | |||||
Electrical buildout - basement 1st floor Date: January 23, 2013 Permit status: Complete | Completion date: April 10, 2013 | Permit id: Ew20130123001 | |||||
Basement - lights,switches, receptacles life safety:speaker strobes, Date: February 16, 2017 Permit status: Issued | Permit id: Ew201702163631 | |||||
Electrical buildout - 2nd floor Date: March 5, 2013 Permit status: Complete | Completion date: April 10, 2013 | Permit id: Ew20130305941 | |||||
Floors 1 & 2, install compass controls Date: February 27, 2017 Permit status: Issued | Permit id: Ew201702273813 | |||||
Install 135 workstations Date: December 30, 2016 Permit status: Issued | Permit id: Ew201612302669 | |||||
Pinterst - lights, switches, receptacles life safety Date: February 16, 2017 Permit status: Issued | Permit id: Ew201702163633 | |||||
Work category: 4pb; add 22, relocate 29 and remove 6 fire sprinklers per ti. #17-609 Date: February 27, 2017 Permit status: Complete | Completion date: March 27, 2017 | Expiration date: February 27, 2017 | Permit id: Pw20170227464 | |||||
Work category: 5p; restroom, breakroom and mothers room water closet and sinks upgrades #17-006 Date: February 15, 2017 Permit status: Complete | Completion date: May 11, 2017 | Expiration date: February 15, 2017 | Permit id: Pw20170215207 | |||||
Tenant improvement: relocate 3 sinks to conform with new cabinet layout, shower valve & shower pan test. Date: January 24, 2013 Permit status: Complete | Completion date: March 27, 2013 | Expiration date: January 24, 2013 | Permit id: Pp20130124675 | |||||
Work category: 4pb; relocate 9 add 16 and delete 6 pendent sprinklers ti#2013-01-17-8215 , #1344844 Date: February 6, 2013 Permit status: Complete | Completion date: March 7, 2013 | Expiration date: February 6, 2013 | Permit id: Pw20130206501 | |||||
SCORE 67 Install 135 workstations Date: December 30, 2016 Contractor: The Inside Source Young Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201612302669 | |||||
SCORE 95 C17-0278 pinterest technology infrastructure Date: February 22, 2017 Contractor: Bei Construction Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702223712 | |||||
SCORE 95 Pinterest - lights switches receptacles life safety: speaker strobes Date: February 16, 2017 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702163632 | |||||
SCORE 96 (1) exterior sign "p" Date: February 9, 2017 Contractor: Ad Art Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201702092818 | |||||
SCORE 95 Basement - lights switches receptacles life safety:speaker strobes Date: February 16, 2017 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702163631 | |||||
SCORE 95 Floors 1 & 2 install compass controls Date: February 27, 2017 Contractor: Syserco Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702273813 | |||||
SCORE 95 Pinterst - lights switches receptacles life safety Date: February 16, 2017 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702163633 | |||||
Electric double faced sign illuminated. Maher na Date: February 2, 2017 Value: $5,000 Permit type: Building permit | Expiration date: June 9, 2017 | Permit id: #201702028449 | |||||
SCORE 98 Add relocate and remove fire sprikler per tenant improvment 22 add 29 relocate 6 remove. Ref 201612296150. N a ordinance#155-13 Permit type: Building permit | Expiration date: February 22, 2018 | Current use: Office | Permit id: #201702229845 | |||||
SCORE 100 Work category: 5p; restroom breakroom and mothers room water closet and sinks upgrades #17-006 Date: February 15, 2017 Contractor: Ayoob And Peery Plumbing Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170215207 | |||||
SCORE 100 Work category: 4pb; add 22 relocate 29 and remove 6 fire sprinklers per ti. #17-609 Date: February 27, 2017 Contractor: Ayoob And Peery Plumbing Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170227464 | |||||
SCORE 95 Electrical buildout - basement / 1st floor Date: January 23, 2013 Contractor: C B F Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130123001 | |||||
SCORE 98 To confirm use as office. Basement 1st & 2nd flr: modifications of (e) tenant suites to incconstruction of non load bearing partitions selective demo new millwork & finishes. Mep under sep permit mahre na Permit type: Building permit | Expiration date: January 5, 2019 | Current use: Office | Permit id: #201612296150 | |||||
SCORE 98 Basement 1st & 2nd flr: mechanical work for ti. New vrv fan coil units new transfer fan and new exhaust fan. No new fsds also ele work maher na Permit type: Building permit | Expiration date: February 16, 2019 | Current use: Office | Permit id: #201701197436 | |||||
SCORE 100 Basement 1st floor and 2nd floor: installation of new notification devices on basement and 2nd floor. Removal & relocation of extg notification devices at same level of light fixtures mechanical ducting. Installation of new duct smoke detectors for new mechanical units on 1st fl. & 2nd fl. Permit type: Building permit | Expiration date: September 9, 2017 | Current use: Office | Permit id: #201703081017 |