Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dccr proposes one geotechnical boring, nebbc-49, located in the westbound lane of adams st nw, feet west of the flagler pl. ? Adams st. Nw intersection. The location is south of 147 adams st nw. The boring will be 6 inches in diameter and 155 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 1 feet below ground surface upon completion Client: Ddot | Applicant: Ddot; Chris Willett Dc Clean Rivers Project | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300084 | |||||
SCORE 96 Electrical Client: Benjamin S Stewart | Permit status: Permit issued | Permit id: E1506673 | |||||
SCORE 59 Dccr proposes one geotechnical boring, nebbc-49, located in the westbound lane of adams st nw, feet west of the flagler pl. ? Adams st. Nw intersection. The location is south of 147 adams st nw. The boring will be 6 inches in diameter and 155 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 1 feet below ground surface upon completion Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300084 | |||||
SCORE 59 Dccr proposes one geotechnical boring, nebbc-49, located in the westbound lane of adams st nw, feet west of the flagler pl. ? Adams st. Nw intersection. The location is south of 147 adams st nw. The boring will be 6 inches in diameter and 155 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 1 feet below ground surface upon completion Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300084 | |||||
SCORE 96 Electrical Client: Benjamin S Stewart | Permit status: Permit issued | Permit id: E1506673 | |||||
SCORE 59 Monitoring wells: on behalf of the district of columbia water and sewer authority -dc water-, the dc clean rivers -dccr- project requests the approval to abandon a monitoring well -nebbc-49- located on adams st. This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division p are now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700304 |