Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Date: February 5, 2013 Contractor: Michael Tardio Client: Maurice Mckenzie | Client Address: 507 West 18th Street New York Ny 10033 | Client Phone: (212) 923-4840 | Client Company: Park Avenue South Management | Expiration date: February 25, 2015 | Permit id: 121524564 | |||||
SCORE 98 Date: February 5, 2013 Contractor: Michael Tardio Client: Maurice Mckenzie | Client Address: 507 West 18th Street New York Ny 10033 | Client Phone: (212) 923-4840 | Client Company: Park Avenue South Management | Permit status: Renewal | Expiration date: February 25, 2015 | Permit id: 121524564 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 9, 2009 Permit type: Delead | Permit id: E926315 | |||||
Public hall - first story public hall stair -replace the broken wood tread 1st up from bottom at first story public hall stair to 1st mid landing and Date: December 5, 2008 Permit type: Gc | Permit id: E917792 | |||||
SCORE 100 Sidewalk shed Date: July 1, 2010 Contractor: J And G General Contracting Permit type: Equipment | Permit status: Permit issued | Permit id: 12039864901 | |||||
SCORE 93 Equipment work Date: February 18, 2010 Contractor: Uniques Fire Systems Inc Permit status: Permit issued | Permit id: 12026705901 | |||||
SCORE 100 Equipment work Date: February 18, 2010 Contractor: Unique Fire Systems Inc Permit status: Permit issued | Permit id: 12026705901 | |||||
SCORE 86 Equipment work Date: March 25, 2015 Contractor: Ashraf Ali Pe Pc Permit status: Permit issued | Permit id: 12234754901 | |||||
Location; lobby ; s&i new transom safety glass at top of vestibule door. Contractors notes ; contractor must sign and return bid contractor m Date: February 4, 2009 Permit type: Gc | Permit id: E925223 | |||||
Repair south and east side of roof bulkhead approximately, (1 sq. Ft.) to include roof flashing at same area. At 5th story public hallway, demo appr Permit type: Gc | Permit id: E207119 | |||||
(public area) install (1) set of stopsand oneway screws at public hall staircase floor(2). Remove all work related debris. Mini rc omo#k802652 Date: January 8, 2008 Permit type: Gc | Permit id: E815331 | |||||
Public hall: reglaze lower wooden sash @ left side between 3rd & 4th floors in hallway with (wired) clear safety glass approx. Size 18x28vendor scop Date: November 18, 2008 Permit type: Gc | Permit id: E915515 | |||||
Public hall stairs. Supply and install new wire mesh safty glass on lower sash at 3 1/2 floor. Note: contractor must contact h. P. D. @(718) 636-30 Date: July 11, 2008 Permit type: Gc | Permit id: E900811 | |||||
Location ; east yard & bulkhead ; s&i seven (7) new wood treads on east yard stairs. S&i new wood tread & saddle at bulkhead door. Contractors n Date: February 4, 2009 Permit type: Gc | Permit id: E925189 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 30, 2009 Permit type: Delead | Permit id: Ea04491 | |||||
SCORE 100 Plumbing Date: January 15, 2015 Contractor: So Plumbing And Heating Inc Permit status: Permit issued | Permit id: 12224760201 | |||||
Plumbing Date: February 25, 2014 Permit status: Permit issued | Permit id: 12152456402 | |||||
Location;boiler rm ; repair leaking pipe located over rear of boiler. Contractors notes ; contractor must sign and return bid contractor must Date: February 4, 2009 Permit type: Heat | Permit id: E925214 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: June 17, 2010 Value: $1,499 Permit type: Delead | Permit id: Ea39282 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 19, 2010 Permit type: Delead | Permit id: Eb15404 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: November 10, 2010 Value: $85 Permit type: Delead | Permit id: Eb14677 | |||||
Apt 9: bathroom install window guard, 1 each @ bathroom or a total of 1. Date: April 8, 2009 Value: $120 Permit type: Gc | Permit id: E934754 | |||||
Local law #1 violation : attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and as not Date: June 10, 2009 Value: $802 Permit type: Delead | Permit id: E941610 | |||||
Apt # 3 at bathroom - repair the leaky faucets at the bath tub. Date: March 25, 2009 Value: $35 Permit type: Plumb | Permit id: E932444 | |||||
Front fire passage way - remove the illegal fastening of chain and pad lock from fire passage way gate at east yard at front of building. Date: January 30, 2009 Value: $90 Permit type: Misc | Permit id: E925334 | |||||
Apt.# 11: supply and install new air valves on two (2) radiators and one (1) steam riser and open all radiator shut off valves throughout apartment. Date: January 26, 2009 Value: $141 Permit type: Plumb | Permit id: E924412 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: November 14, 2008 Value: $1,670 Permit type: Delead | Permit id: E915750 | |||||
Apt # - entire apartment - bleed the radiator in bed room -1 at north and replace with new the air valve at radiator and restore the radiator to pr Date: January 20, 2009 Value: $214 Permit type: Plumb | Permit id: E923532 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: January 2, 2009 Permit type: Delead | Permit id: E921441 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: December 22, 2008 Permit type: Delead | Permit id: E920468 | |||||
Boiler room: adjust boiler to provide sufficent heat to all apts. Date: December 10, 2008 Value: $89 Permit type: Heat | Permit id: E918908 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: February 4, 2009 Value: $1,055 Permit type: Delead | Permit id: E925846 | |||||
Apt #12a) at bathroom and kitchen : installed (1 each rooms) window guards, and at living room and bedroom#4, re-installed (2 each rooms) existing win Date: July 10, 2008 Value: $233 Permit type: Gc | Permit id: E901302 | |||||
(public area) remove free standing radiators from 1st and 2nd floor public hallways. Remove all work related debris. Date: February 15, 2008 Value: $59 Permit type: Misc | Permit id: E823004 | |||||
(apt. #4) install 3 window guards complete at kitchen(1), bedroom(1) and bedroom(1). Remove all work related debris. Date: March 3, 2008 Value: $218 Permit type: Gc | Permit id: E824917 | |||||
Public area: remove disonnected and free standing radiator from public hall, 1st story. Date: March 19, 2007 Value: $54 Permit type: Misc | Permit id: E725086 | |||||
Apt #. 3 at bthrm install (1) window guard and stop. Date: January 26, 1999 Value: $71 Permit type: Gc | Permit id: E004143 | |||||
SCORE 100 Equipment work Date: February 5, 2013 Contractor: Statewide Oil And Heating Permit status: Permit issued | Permit id: 12152456401 | |||||
Plumbing Date: February 5, 2013 Permit status: Permit issued | Permit id: 12152456401 | |||||
SCORE 93 Plumbing Date: February 25, 2014 Contractor: Tardio Plumbing Llc Permit status: Permit issued | Permit id: 12152456402 | |||||
Repair south and east side of roof bulkhead approximately, (1 sq. Ft.) to include roof flashing at same area. At 5th story public hallway, demo appr Permit type: Gc | Permit id: E207119 | |||||
SCORE 93 Plumbing Date: February 5, 2013 Contractor: Tardio Plumbing Llc Permit status: Permit issued | Permit id: 12152456401 | |||||
SCORE 99 Date: February 5, 2013 Contractor: Michael Savino Client: Maurice Mckenzie | Client Address: 507 West 18th Street New York Ny 10033 | Client Phone: (212) 923-4840 | Client Company: Park Avenue South Management | Permit status: Initial | Permit id: 121524564 | |||||
SCORE 99 Date: February 18, 2010 Contractor: Muntaz Khan Client: Mohammed Saleh | Client Address: 1437 Amsterdam Avenue New York Ny 10027 | Client Phone: (212) 690-0160 | Permit status: Initial | Permit id: 120267059 | |||||
SCORE 98 Date: February 18, 2010 Contractor: Muntazz Khan Client: Mohammed Saleh | Client Address: 1437 Amsterdam Avenue New York Ny 10027 | Client Phone: (212) 690-0160 | Permit status: Initial | Permit id: 120267059 | |||||
At apartment # 12a supply and install a total of (3) window guards as follows: room # 1 install (1n0) roo Date: October 11, 2016 Value: $103 Permit type: Gc | Permit id: Eh04778 | |||||
Repair south and east side of roof bulkhead approximately, (1 sq. Ft.) to include roof flashing at same area. At 5th story public hallway, demo appr Permit type: Gc | Permit id: E207119 | |||||
SCORE 96 Plumbing Date: February 25, 2014 Contractor: Tardio Plumbing, Llc Permit status: Permit issued | Permit id: 12152456402 | |||||
SCORE 96 Plumbing Date: February 5, 2013 Contractor: Tardio Plumbing, Llc Permit status: Permit issued | Permit id: 12152456401 | |||||
Public hall stairs. Supply and install new wire mesh safty glass on lower sash at 3 1 2 floor. Note: contractor must contact h. P. D. @(718) 636-30 Date: July 11, 2008 Permit type: Gc | Permit id: E900811 | |||||
Repair south and east side of roof bulkhead approximately, (1 sq. Ft.) to include roof flashing at same area. At 5th story public hallway, demo appr Permit type: Gc | Permit id: E207119 | |||||
Repair south and east side of roof bulkhead approximately, (1 sq. Ft.) to include roof flashing at same area. At 5th story public hallway, demo appr Permit type: Gc | Permit id: E207119 | |||||
Location ; apt #11 ; s & i new air valves on two radiators and one steam riser. Set steam shutoff vas to open position. Contractors notes Permit type: Heat | Permit id: E924378 | |||||
Location ; apt #11 ; s & i new air valves on two radiators and one steam riser. Set steam shutoff vas to open position. Contractors notes Permit type: Heat | Permit id: E924378 | |||||
Location ; apt #11 ; s & i new air valves on two radiators and one steam riser. Set steam shutoff vas to open position. Contractors notes Permit type: Heat | Permit id: E924378 | |||||
Location ; apt #11 ; s & i new air valves on two radiators and one steam riser. Set steam shutoff vas to open position. Contractors notes Permit type: Heat | Permit id: E924378 | |||||
Location ; apt #11 ; s & i new air valves on two radiators and one steam riser. Set steam shutoff vas to open position. Contractors notes Permit type: Heat | Permit id: E924378 | |||||
Apt #4) at room east south-5 bedroom: remove existing broken of defective window glass. Supply and install new glass to window lower sash. Remove a Date: February 29, 2008 Permit type: Gc | Permit id: E823816 | |||||
As per the requirement contract with hpd apartment # 9 supply and install the missing or repair/replace the defective window guards throughout t Date: October 7, 2013 Permit type: Gc | Permit id: Ee07209 | |||||
As per requirement contract supply and install 2 window guards (1 in the last bedroom and 1 in the second bedroom) complete and repair 2 window gua Date: December 6, 2012 Permit type: Gc | Permit id: Ed10268 | |||||
#2oil boiler: make all necessary repairs to #2 oil boiler. Restore to proper working condition. Restore hot water and heat to entire building. Date: November 14, 2008 Permit type: Heat | Permit id: E915102 | |||||
As per the requirement contract with hpd. Apartment # 9: repair total (3) existing window guards complete as follows: bedroom#4 (2), living room Date: September 3, 2013 Permit type: Gc | Permit id: Ee04517 | |||||
As per the requirement contract with hpd apartment # 9 supply and install the missing or repair replace the defective window guards throughout t Date: October 7, 2013 Permit type: Gc | Permit id: Ee07209 | |||||
Apt 5 at kitchen - trace and repair water leaks from the ceiling; demolish approx 32 sq ft ceiling and walls damaged as a result of the leak(s), re Date: May 5, 2009 Permit type: Gc | Permit id: E937180 | |||||
As per the requirement contract with hpd apartment #3 supply and install the missing or repair/replace the defective window guards throughout th Date: August 22, 2013 Permit type: Gc | Permit id: Ee04057 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 10, 2011 Permit type: Delead | Permit id: Eb19094 | |||||
Apt.#3: bed#1 install stops at 1 window, bed#2 replace broken balances so window works properly and install stops, bed#3: replace broken balanc Date: November 3, 2010 Permit type: Gc | Permit id: Eb12754 | |||||
(apt # 3) at bathroom: trace and repair the source of water leak and loose plaster. At bathroom: ceiling and/or wall damages 2 sq. Ft. Demolish Date: September 26, 2008 Permit type: Gc | Permit id: E909844 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: December 10, 2008 Permit type: Delead | Permit id: E918860 | |||||
As per the requirement contract with hpd, provide and install 4 window guards and repair window guards throughout entire apartment 3. Remove all wo Permit type: Gc | Permit id: Eh05077 | |||||
(apt # 3) at bathroom: trace and repair the source of water leak and loose plaster. At bathroom: ceiling and or wall damages 2 sq. Ft. Demolish Date: September 26, 2008 Permit type: Gc | Permit id: E909844 | |||||
As per the requirement contract with hpd, provide and install 4 window guards and repair window guards throughout entire apartment 3. Remove all wo Permit type: Gc | Permit id: Eh05077 | |||||
As per the requirement contract with hpd apartment #3 supply and install the missing or repair replace the defective window guards throughout th Date: August 22, 2013 Permit type: Gc | Permit id: Ee04057 | |||||
As per the requirement contract with hpd, provide and install 4 window guards and repair window guards throughout entire apartment 3. Remove all wo Permit type: Gc | Permit id: Eh05077 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 30, 2008 Permit type: Delead | Permit id: E910483 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: August 4, 2008 Permit type: Delead | Permit id: E904647 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 10, 2013 Permit type: Delead | Permit id: Ed13832 | |||||
As per the requirement contract with hpd. Apartment # 1: supply and install total (3) new window guards complete as follows: bedroom#1 (1), bedr Date: October 8, 2013 Permit type: Gc | Permit id: Ee07207 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: October 29, 2015 Permit type: Delead | Permit id: Eg06441 | |||||
Boiler room: #2 oil fired boiler: repair and adjust to proper working order to restore hot water to premises. Note: contractor must contact h. P. Date: July 14, 2008 Permit type: Heat | Permit id: E900808 | |||||
As per requirement contract apt. 1 supply and install 2 window guards (1 in the bath and 1 in the kitchen) complete at entire apartment. Rem Date: December 6, 2012 Permit type: Gc | Permit id: Ed10244 | |||||
As per the requirement contract with hpd apartment #1 supply and install the missing or repair/replace the de Date: August 22, 2013 Permit type: Gc | Permit id: Ee04516 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at apt# 1 ---- replace with three ( Permit type: Gc | Permit id: Eh07168 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at apt# 1 ---- replace with three ( Permit type: Gc | Permit id: Eh07168 | |||||
As per the requirement contract with hpd apartment #1 supply and install the missing or repair replace the de Date: August 22, 2013 Permit type: Gc | Permit id: Ee04516 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: December 27, 2016 Permit type: Delead | Permit id: Eh08823 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 16, 2016 Permit type: Delead | Permit id: Eh08161 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at apt# 1 ---- replace with three ( Date: February 23, 2017 Permit type: Gc | Permit id: Eh07168 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 26, 2009 Permit type: Delead | Permit id: E928602 | |||||
(apt # 8) at room east (4): trace and repair the source of water leak and loose plaster. At room east (4): ceiling and/or wall damages 3 sq. Ft. I Date: December 2, 2008 Permit type: Gc | Permit id: E916774 | |||||
(apt#8) install (1) window guards complete. (1) in the 1st room from east at north. Remove all work related debris. Mini rc omo# k806058 n Date: October 30, 2008 Permit type: Gc | Permit id: E913139 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 23, 2008 Permit type: Delead | Permit id: E920483 | |||||
Apt # 8 - kitchen - properly repair with similar materials the broken, damaged and rotted wood floor at kitehen . Work includes s/i new plywood base Date: December 9, 2008 Permit type: Gc | Permit id: E918007 | |||||
(apt#8) install (1) window guards complete. (1) in the 1st room from east at north. Remove all work related debris. Note: contractor must co Date: December 8, 2008 Permit type: Gc | Permit id: E917624 | |||||
Apt # 8 - kitchen - properly repair with similar materials the broken, damaged and rotted wood floor at kitehen . Work includes s i new plywood base Date: December 9, 2008 Permit type: Gc | Permit id: E918007 | |||||
(apt # 8) at room east (4): trace and repair the source of water leak and loose plaster. At room east (4): ceiling and or wall damages 3 sq. Ft. I Date: December 18, 2008 Permit type: Gc | Permit id: E919136 | |||||
# 2 oil boiler: make all necessary repairs to the # 2 oil boiler to restore to proper working condition. Restore hot water to entire apartment buildin Date: October 16, 2008 Permit type: Heat | Permit id: E912005 | |||||
As per the requirement contract with hpd apartment #12-a tenant ph # (347) 951-8691 supply and install the mi Date: August 22, 2013 Permit type: Gc | Permit id: Ee04518 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 6, 2009 Permit type: Delead | Permit id: Ea00928 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: November 12, 2008 Permit type: Delead | Permit id: E915117 | |||||
As per the requirement contract with hpd apartment # 12-a supply and install the missing or repair/replace the defective window guards throughou Date: October 9, 2013 Permit type: Gc | Permit id: Ee07208 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 20, 2010 Permit type: Delead | Permit id: Eb04335 | |||||
(apt#12-a) install (4) window guards complete. (1) in the kitchen, (1) in the bathroom, (1) in the 2nd room from east (1) in the 5th room from east. Date: July 8, 2008 Permit type: Gc | Permit id: E836630 | |||||
(apt#12-a) install (1) window guards complete. (1) in the 2nd room from east. Remove all work related debris. Mini rc omo# k806058 note: con Date: October 23, 2008 Permit type: Gc | Permit id: E912483 | |||||
Local law # 1 violation: court case as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 2 Date: August 24, 2009 Permit type: Delead | Permit id: Ea07071 | |||||
As per the requirement contract with hpd, provide and install 2 window guards (1 in the 1st bedroom and the 2nd bedroom) and repair 1 window guard (in Date: December 7, 2012 Permit type: Gc | Permit id: Ed09914 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 9, 2009 Permit type: Delead | Permit id: Ea15093 | |||||
As per the requirement contract with hpd apartment # 12-a supply and install the missing or repair replace the defective window guards throughou Date: October 9, 2013 Permit type: Gc | Permit id: Ee07208 |