Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Construct two-story plus cellar addition. Gut rehab of entire interior. Existing roof and floor structures to remain. Install new electrical, mechanical, and plumbing systems. Convert sfd to flat. Date: November 17, 2016 Contractor: Douglas Church; Trout Design Studio Client: Douglas M Church | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1611367 | |||||
SCORE 56 To install 4 kw size of 15 solar panels with a system height of 1. 9 feet on the roof of the building. Date: April 27, 2017 Client: Doug Church | Permit type: Solar system | Permit status: Permit issued | Permit id: Sol1700433 | |||||
SCORE 69 Erect scaffolding and repoint brick on front of home located in historic district Date: January 27, 2017 Contractor: Douglas Church Client: Douglas Church | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1704066 | |||||
Electrical Date: May 8, 2017 Client: Douglas M Church | Permit status: Permit issued | Permit id: E1706272 | |||||
SCORE 96 Electrical Date: March 17, 2017 Contractor: Walter H Meyer Client: Douglas M Church | Permit status: Permit issued | Permit id: E1704725 | |||||
Plumbing and gas Date: February 6, 2017 Client: Douglas M Church | Permit status: Permit issued | Permit id: P1703399 |